Large Diameter Steel Pipe Piles Running Under Self Weight In Soft Clay ' Predicted Vs. Observed Behavior ' Richmond San Rafael Bridge Seismic RetrofitBy A. R. Dover
The Richmond San Rafael Bridge (Figure 1) is a 4.3 mile long major toll bridge span across northern San Francisco Bay. Tutor-Saliba/Koch/Tidewater (TSKT) conducted a comprehensive seismic retrofit, wh
Jan 1, 2006
-
Bio-Grout Based Soil ImprovementBy Terzis D. PhD, Katterbach M.
While awareness around the environmental impact of existing grout materials and chemical binders is increasing rapidly, biotechnologies are growing traction as sustainable alternatives in groundwork o
May 1, 2022
-
Review Of Major Developments In Ground Engineering Over The Last 20 Years And Current TrendsBy David Sherwood
The paper has been prepared as the basis for the 2008 John Mitchell Memorial Lecture. It reviews major developments in ground engineering over the last 20 years, not from the point of view of technic
Jan 1, 2008
-
Case Histories On The Applications Of Colloidal Silica For Permeation GroutingBy Davide Grassi, Joel Joaquin Cortez, Giovanni Spagnoli, Nick Chittenden
Grouting is a technique used to improve the engineering properties of soils and rocks. Grouting techniques are classified under different criteria: injection method used, type of grout material inject
May 1, 2022
-
A Review of Guidelines for Dewatering Design within the Abu Dhabi MunicipalityBy M. Melih Demirkan, Jared Deible, Michael Rosenmeier, Mazen Elias Adib, Juan J. Gutierrez, Raghav Ramanathan
Dewatering and groundwater control is required frequently for construction projects and needs to be accounted for and dealt with care during design and construction to complete the project successfull
Jan 1, 2016
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Collaborative Value Engineering Redesign - DFI 2020By Martin Mcdermott, Kevin Tehansky, Robert Ross, Jeffrey Goodwin
A foundation value engineering redesign is a collaboration between the project owner, original design team, general contractor, foundation contractor and redesign team. Without the acceptance and coll
-
Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 WaltonBy Joel B. Dellaria, Justin R. Lewis
"No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca
Jan 1, 2017
-
Cutter Soil Mixing Solutions at the Leixões Cruise TerminalBy Xavier Pita, Alexandre Pinto, António Cristovão, Rui Tomásio
"The cutter soil mixing technology was been applied in Portugal since the last seven years. The aim of this paper is to present the main design and execution criteria, related with both the cofferdam
Jan 1, 2015
-
Improvements to Commonly Used Cutoff Wall SpecificationsBy Michael Kynett, Francke Walberg, Richard Millet, Khaled Chowdhury, Mary Perlea
"Cutoff walls are the most common seepage improvement measure for levee flood control projects throughout California’s Central Valley. Cutoff walls are widely used because they can be implemented with
Jan 1, 2015
-
8000 Series Piling RigBy Roger A. Bullivant
The introduction of this size and type of piling rig is intended to address a multipurpose foundation activity. The 8000 denotes the size of equipment that is attached to the mast, namely 8000 Kg. Lar
Jan 1, 1995
-
Washington Avenue Tunnel Project: Fortifying Aging Underground InfrastructureBy Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016
-
A Case History – Termination of Pile in Rock Based on Penetration Resistance for a Bridge across River Mandovi in GoaBy Akshay Sakhuja, M. S. Karthika, R. Vignesh
"The bridge across River Mandovi in Goa is a cable stay bridge structure proposed parallel, along existing bridges for regulation and reduction of vehicular traffic; the entire bridge structure is sup
Jan 1, 2015
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs ExtensionBy Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015
-
Elliptical Jet Grouting for the Sela-22 Project in New Orleans, LA: An Innovative SolutionBy Filippo Maria Leoni, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, the SELA-22 project entailed the construction of a co
Jan 1, 2017
-
A Digital Twin For Deep Vibro Ground ImprovementBy Negin Khalili-Motlagh-Kasmaei, Paul O'Leary, Christopher J. Rothsiedl, Dimitar Ninesvski, Alexander Zöhrer, Vincent Winter
This paper presents the implementation of a digital twin for the vibro-replacement ground improvement process, as part of a digital construction site. The goal is to implement an evidence-based qualit
May 1, 2022
-
Water Powered Percussive Downhole Hammers – Energy Savings And ProductivityBy Shyam Chengalath, Johan Jeansson, Magnus Hörman
Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm
Sep 1, 2022
-
Soil Mixing for the LPV-111 Levee Improvements, New Orleans: A Case HistoryBy Filippo Maria Leoni, George Filz, Wesley Schmutzler, Matteo Bertoni
"The US Army Corps of Engineers selected the Deep Mixing Method (DMM) for the required stabilization at the LPV 111 Project (New Orleans, USA). DMM was used for ground improvement/foundation strengthe
Jan 1, 2015
-
Interpretation and Evaluation of Thermal Integrity Profiling MeasurementsBy Seth Robertson, Daniel Belardo, Travis Coleman
Thermal Integrity Profiling (TIP) is a non-destructive method used to evaluate drilled deep foundation integrity. This integrity testing method is specified more frequently, and is becoming an indust
Sep 8, 2021
-
Environmental Considerations Regarding The Danish Landworks For The Fixed Link Across The Øresund - SynopsisBy Uwe Hess
For the Danish landworks for the coming fixed link between Denmark and Sweden across the Øresund the focus has been on the environmental aspects of the construction and operation of the facilities. Th