Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Large Scale Jet Grouting And Deep Mixing Test Program At Tuttle Creek Dam
By Mario Mauro
Tuttle Creek Dam was constructed by the U.S. Army Corps of Engineers in the 1950?s on the Big Blue River in north-east Kansas. Since the dam is located in a seismic area, the safety of the dam was re-
Jan 1, 2008
-
Case Histories On The Applications Of Colloidal Silica For Permeation Grouting
By Davide Grassi, Joel Joaquin Cortez, Giovanni Spagnoli, Nick Chittenden
Grouting is a technique used to improve the engineering properties of soils and rocks. Grouting techniques are classified under different criteria: injection method used, type of grout material inject
May 1, 2022
-
A Review of Guidelines for Dewatering Design within the Abu Dhabi Municipality
By M. Melih Demirkan, Jared Deible, Michael Rosenmeier, Mazen Elias Adib, Juan J. Gutierrez, Raghav Ramanathan
Dewatering and groundwater control is required frequently for construction projects and needs to be accounted for and dealt with care during design and construction to complete the project successfull
Jan 1, 2016
-
Dynamic Pile Monitoring For Offshore Pile Acceptance
By Scott Webster
Dynamic pile Monitoring Services (DMS) have been used for testing of offshore piles for several decades. However, most of this testing was to measure hammer performance and pile stresses rather than
Jan 1, 2010
-
Large Diameter Steel Pipe Piles Running Under Self Weight In Soft Clay ' Predicted Vs. Observed Behavior ' Richmond San Rafael Bridge Seismic Retrofit
By A. R. Dover
The Richmond San Rafael Bridge (Figure 1) is a 4.3 mile long major toll bridge span across northern San Francisco Bay. Tutor-Saliba/Koch/Tidewater (TSKT) conducted a comprehensive seismic retrofit, wh
Jan 1, 2006
-
Review Of Major Developments In Ground Engineering Over The Last 20 Years And Current Trends
By David Sherwood
The paper has been prepared as the basis for the 2008 John Mitchell Memorial Lecture. It reviews major developments in ground engineering over the last 20 years, not from the point of view of technic
Jan 1, 2008
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KY
By Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Collaborative Value Engineering Redesign - DFI 2020
By Martin Mcdermott, Kevin Tehansky, Robert Ross, Jeffrey Goodwin
A foundation value engineering redesign is a collaboration between the project owner, original design team, general contractor, foundation contractor and redesign team. Without the acceptance and coll
-
Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 Walton
By Joel B. Dellaria, Justin R. Lewis
"No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca
Jan 1, 2017
-
Cutter Soil Mixing Solutions at the Leixões Cruise Terminal
By Xavier Pita, Alexandre Pinto, António Cristovão, Rui Tomásio
"The cutter soil mixing technology was been applied in Portugal since the last seven years. The aim of this paper is to present the main design and execution criteria, related with both the cofferdam
Jan 1, 2015
-
Improvements to Commonly Used Cutoff Wall Specifications
By Michael Kynett, Francke Walberg, Richard Millet, Khaled Chowdhury, Mary Perlea
"Cutoff walls are the most common seepage improvement measure for levee flood control projects throughout California’s Central Valley. Cutoff walls are widely used because they can be implemented with
Jan 1, 2015
-
Washington Avenue Tunnel Project: Fortifying Aging Underground Infrastructure
By Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016
-
A Case History – Termination of Pile in Rock Based on Penetration Resistance for a Bridge across River Mandovi in Goa
By Akshay Sakhuja, M. S. Karthika, R. Vignesh
"The bridge across River Mandovi in Goa is a cable stay bridge structure proposed parallel, along existing bridges for regulation and reduction of vehicular traffic; the entire bridge structure is sup
Jan 1, 2015
-
Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs Extension
By Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee
"The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u
Jan 1, 2015
-
Elliptical Jet Grouting for the Sela-22 Project in New Orleans, LA: An Innovative Solution
By Filippo Maria Leoni, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, the SELA-22 project entailed the construction of a co
Jan 1, 2017
-
A Digital Twin For Deep Vibro Ground Improvement
By Negin Khalili-Motlagh-Kasmaei, Paul O'Leary, Christopher J. Rothsiedl, Dimitar Ninesvski, Alexander Zöhrer, Vincent Winter
This paper presents the implementation of a digital twin for the vibro-replacement ground improvement process, as part of a digital construction site. The goal is to implement an evidence-based qualit
May 1, 2022
-
8000 Series Piling Rig
By Roger A. Bullivant
The introduction of this size and type of piling rig is intended to address a multipurpose foundation activity. The 8000 denotes the size of equipment that is attached to the mast, namely 8000 Kg. Lar
Jan 1, 1995
-
Water Powered Percussive Downhole Hammers – Energy Savings And Productivity
By Shyam Chengalath, Johan Jeansson, Magnus Hörman
Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm
Sep 1, 2022
-
Soil Mixing for the LPV-111 Levee Improvements, New Orleans: A Case History
By Filippo Maria Leoni, George Filz, Wesley Schmutzler, Matteo Bertoni
"The US Army Corps of Engineers selected the Deep Mixing Method (DMM) for the required stabilization at the LPV 111 Project (New Orleans, USA). DMM was used for ground improvement/foundation strengthe
Jan 1, 2015
-
Interpretation and Evaluation of Thermal Integrity Profiling Measurements
By Seth Robertson, Daniel Belardo, Travis Coleman
Thermal Integrity Profiling (TIP) is a non-destructive method used to evaluate drilled deep foundation integrity. This integrity testing method is specified more frequently, and is becoming an indust
Sep 8, 2021