Providing External Confinement to Precast Prestressed Pile Shafts to Improve Ductility - ·Experimental Observations
By Andrew Budek
"Analytical and experimental work has shown that achieving the full inelastic lateral capacity of a pile may require the formation of a plastic hinge below ground level, in the pile shaft. The confini
Jan 1, 2005
-
Deep Mixing Ground Improvement Design to Support Large MSE Walls for Kitimat LNG, BC
By Randy R. Williams, Roberto R. Olivera, Brian W. Wilson, Marina S. W. Li
"An extensive, deep mixing (DM) ground improvement program using the Cutter Soil Mixing (CSM) technique was designed and constructed in 2013 to support up to 20 m (66 ft) high Mechanically Stabilized
Jan 1, 2017
-
Application of Deep Soil Mixing Walls in the Warren Avenue Grade Separation Project, Fremont, CA
By D. S. Yang, Y. D. Wang, G. Watanabe, A. P. Notaro
"Deep soil mixing (DSM) walls reinforced with steel soldier piles were installed for excavation support and groundwater control for the construction of a grade separation structure at the intersection
Jan 1, 2015
-
Retaining Structure for Berth at Krishnapatnam
By P. V. Chandramohan
"The paper deals with the arrangement of structural members for a retaining structure used as a berth in the port of Krishnapatnam. The height of retention is 24.3m. A T-shaped diaphragm wall acts as
Jan 1, 2015
-
Material Properties for Analysis of Deep Mixing Support Systems
By Alex Grenoble, Alex Reeb, George Filz, Farzad Abedzadeh
"This paper summarizes available information on the characteristics and properties of deep-mixed soilcement produced by the wet method. The topics covered in this paper include: unit weight, unconfine
Jan 1, 2015
-
Seismic Behavior Of Full-Scale Piles In Improved Soft Clay
By Bradley J. Fleming
Although soil improvement and its application to deep foundations is gaining popularity in the engineering community, this technique is not widely used in high seismic regions due to lack of fundament
-
The Need For Air Control In Down The Hole Hammer Casing Advancement Drilling
By Frank J. Purcell
“Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou
Nov 1, 2022
-
Design and Construction of Pile-Supported Mechanicallystabilized-Earth Slope Stabilization
By Nasr Sheta
"After Hurricane Sandy, the stability of an earth slope in the Atlantic Highlands, New Jersey in the United States was deteriorating due to slumping soils and erosion from flooding. A slope stability
Jan 1, 1900
-
Drilled Pier Foundation with Ground Improvement Using Cement Deep Soil Mixing for Highway Bridges
By Shahriar Vahdani, Andy Herlache, Andrew Bro, Wei-Yu Chen
"The Presidio Parkway Project will reconstruct approximately 1.6 miles of highway, including seven bridges, three cut-and-cover tunnels, and an undercrossing connecting the Golden Gate Bridge to the C
Jan 1, 2014
-
Centrifuge Modelling Of Displacement Piles and Installation Effects
By J. Gniel, L. King, C. Gaudin, C. O’Loughlin
"This paper presents some recent advancements in centrifuge modelling, which enable the installation of displacement piles to be performed in-flight while measuring ground responses. Details and resul
Jan 1, 1900
-
Safety Evaluation Of Adjoining Structures In Urban Areas During Deep Excavation: A Case Study Of Nagpur Metro
By Shreya Vivek Hokam, Dr. A. I. Dhatrak, S. W. Thakare, Dr. Vivek S. Hokam
Construction in congested urban areas has necessitated tall and massive structures. In urban areas, it is common to construct underground structure nearby existing buildings. Selection of an appropria
Sep 1, 2022
-
Thirty Years of Experience with the Wave Equation Solution Based on the Method of Characteristics
By Peter Middendorp, Gerald E. H. Verbeek
"This paper will describe a brief history of the method of characteristics as an accurate solution of the wave equation, and the author's experiences with the method of characteristics over a period o
Jan 1, 2005
-
Deep Foundation Support for the Iconic New York Wheel
By Satyajit Vaidya, Rudolph Frizzi, Quadri Owokoniran
"This paper presents a case history in the design and construction of high-capacity drilled shafts for the iconic New York Wheel presently being constructed along the St. George area waterfront in nor
Jan 1, 2016
-
Monopile Construction Technique For Mumbai Coastal Road Package 1 - Mumbai
By T Vijayakumar, Vipul Dobhada, Rajesh Patel, Swarnadip Dey, Naveen Babu D
The most challenging scope of any bridge project in marine or inter tidal zone is to construct sub structure like well Foundation, group pile, pile cap etc. Similarly, it also affects the marine envir
Sep 1, 2022
-
Buttressing Berms for Stability of Cantilever Sheet Piles – Limit Equilibrium and Finite Element Approaches
By Ali Ebrahimi, Meena L. Viswanath, John F. Beech, Mustafa B. Erten, Ming Zhu
"Excessive deformation of a cantilever sheetpile wall can occur due to dredging, excavation, backfilling, or long-term creep behavior of soil. A buttressing berm constructed in front of the wall can b
Jan 1, 2016
-
Levee Repair and Upgrade by Dual Sheet Pile Walls and Accordion Sheet Pile Wall
By Takefumi Takuma, Ali Fayad, Shigeru Kambe
"This paper discusses the unique design and construction circumstances of the cantilevered dual sheet pile walls and the Accordion Sheet Pile Wall for the repair and upgrade of the East Garden Grove-W
Jan 1, 2017
-
Large Diameter Auger Cast Piles At Audi Field, Dc United's New Soccer Stadium
By Christophe H. Locussol
D.C. United, the professional soccer team located in Washington, D.C., completed a 20,000 seat capacity stadium in July 2018 named Audi Field. The project initially considered a foundation system cons
-
Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff Wall
By Gene Bryant, Wesley Schmutzler, Matteo Bertoni
The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00
Jan 1, 2019
-
Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction
By Alan D. Fisher
Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen
Jan 1, 2013
-
Augercast Piles - History And Advancements
By Larry Rayburn
Augercast piles evolved in the late forties from the process of pressure grouting open holes backfilled with stone. In 1956, a patent was issued for a cast in situ pile by pumping high pressure grout
Jan 1, 2005