Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Improved Remediation Performance of a Contaminated Basalt Aquifer by Blast Fracturing

    By Adrian Moore, Bryan Goodwin, David Fales, David Lam

    This paper describes the development of blasting protocols used to successfully create a 450m long blast fractured permeable trench in a basalt aquifer up to 20m thick, at a petrochemical facility in

    Jan 1, 2011

  • ISEE
    Modernizing Operations: Leveraging GIS in Drilling, Blasting and Quarry Applications

    By Dr. Anurag Agrawal, Steve Franklin, Clint Zimmerman, Elijah Williams

    In a time when data has become a highly valued commodity within many mining and quarry operations, managing large amounts of current and historical information can be difficult. If not managed properl

    Jan 21, 2025

  • ISEE
    Improving Blast Preformance with High Density Toe Loads

    By John Floyd, Larry Wardrip

    A series of tests were conducted to evaluate the performance of a high density, high velocity cartridged explosive. The tests included two production blasts in a limestone quarry and two production bl

    Jan 1, 2002

  • ISEE
    The History and Development of Permissible Explosives for Underground Coal Mining (c0bdb26c-921d-4fa8-97b7-a8bd2dbb04d2)

    By Robert B. Hopler

    The hazards which naturally prevail in underground coal mines, always severe and unpredictable due to the loosely-consolidated strata in which coal is frequently found, are increased by the commonly-o

    Jan 1, 1996

  • ISEE
    Journal: 100 Years / A Trip Through The Anthracite Coal Mines

    By Robert Hopler

    RBH Note: in 1913 black powder was still dominant as a coal-mining explosive, but permissible explosives were making some slight headway. For example, in 1902 there were only 11,300 pounds of permissi

    Jan 1, 2014

  • ISEE
    Impact of Blasting on Resource Recovery, Mining Profit, Safety, and the Environment

    By Z X. Zhang

    If the iron ore loss is 15% in the process of mining, the total iron ore loss in the world will be about 461 million tons, this is equal to the total production of 230 iron ore mines each of which pro

    Jan 1, 2014

  • ISEE
    Developing Safety in United Kingdom Drilling Operations

    By Rob Farnfield, Ben Williams, Bob Woolley

    This paper outlines how drilling safety standards are being driven forward in the United Kingdom’s surface mining and quarrying industry with developments in equipment, procedures and competence.

    Jan 1, 2010

  • ISEE
    Precision Delay Detonators: A Decade of Progress

    By M. Y. Wong

    Electronic detonators have been used on a trial basis for over a decade, and found more recent application in production blasting as well. The relative merits of these detonators and their applicabili

    Jan 1, 2004

  • ISEE
    Blasting for Installation of one of the World’s Largest In-Pit Crushers at an Open Cut Copper Mine

    By S. Mansfield, A. Sharma

    At a large open cut copper mine, in pit crushing and conveying is used to shorten haul routes and minimise stockpiling of ore. This strategy decreases capital expenditure by reducing the number of hau

    Jan 1, 2024

  • ISEE
    Determination of Blast Vibration Limits by Direct Strain Measurement

    By Adrian Moore, Alan Richards, Andrew Brodbeck

    Structural blast vibration limits should be based on the strength of the structure, the stress induced by blasting, and a responsible factor of safety. In this paper a methodology that uses direct str

    Feb 1, 2020

  • ISEE
    Track and Trace (T&T) of Regulated Material

    By Paulo Cesar Pavan

    T&T or Traceability, is a concept of generating, storing and on demand providing information about all traceable items in the supply chain

    Jan 1, 2019

  • ISEE
    Case Study: Iterative Design Process of Presplitting in an Underground Overhand Cut and Fill Mine

    By David Porter, Nathan Rouse

    The implementation of presplit blasting has been widely utilized in open pit and underground tunneling. This case study works through the iterative process of developing a heading drill and blast desi

    Feb 6, 2023

  • ISEE
    Chilean Challenges in Underground Mining - Electronic Initiation System (IS) and Drill & Blast Engineering Focused Projects

    By Manuel Villalobos Calderón

    This paper presents the Enaex group approach to addressing the blasting challenges and outlines the solutions created. Aspects such as rock mass damage occurrence as a function of blast vibration freq

    Feb 1, 2020

  • ISEE
    Improved Drill and Blast Designs Free $3.6M of Ore for Surface Copper Mine Tacio Ferreira, Dyno Nobel

    By Tacio Ferreira

    A surface copper mine in the Western United States faced challenges in recovering rock and ore from final walls because of geotechnical constraints that require restrictions on methods for loading bla

    Jan 21, 2025

  • ISEE
    Vibration Control In Open Cut Mine Through Pre-Loading Applying Wireless Detonators

    By C. Feliciano, M. Cavalcante

    A large iron ore open pit mine in Brazil operates with reduced blast sizes, due to the imminence of red alerts in the rainy season and the proximity of plant and dam structures that demand control of

    Jan 1, 2024

  • ISEE
    Chilean Challenges in Underground Mining - Electronic Initiation System (IS) and Drill &Blast Engineering Focused Projects

    By Manuel Calderón

    Chile is responsible for 30% of the global copper production; the world ́s largest. However, significant challenges are faced in this industry; declining grades (1.13% in 2002 to 0.61% in 2015), high

  • ISEE
    S-Load Cartridge

    By Marco Larghi, Jurg Knobel, Braden Schmidt

    Remote Avalanche Control Systems (RACS) which uses solid explosives has been used in Europe since 1996 and North America since 1999. With large destructive avalanches in transportation corridors, vari

    Feb 1, 2020

  • ISEE
    Varying Stemming Heights Based on the Horizontal Relief Available to Each Hole

    By Neal Lee

    Reduced relief horizontally means an increase in energy expended vertically into the rock surrounding the stemming column, and potentially through the stemming column. The vast majority of holes in an

    Feb 6, 2023

  • ISEE
    HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive Ground

    By K. Dufresne

    Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron

    Jan 1, 2024

  • ISEE
    S-Load Cartridge

    By Marco Larghi, Jurg Knobel, Braden Schmidt

    Remote Avalanche Control Systems (RACS) which uses solid explosives has been used in Europe since 1996 and North America since 1999. With large destructive avalanches in transportation corridors, vari