Pit Optmisation and Mine Production Scheduling - The way AheadBy Gordon S. Thomas
The problem of how best to exploit a reserve has vexed mine planners and design engineers since mining began. The cyclic nature of the mine design-scheduling problem, combined with the lack of good ma
Jan 1, 1996
-
Prediction of Air Flows Through Broken Rock by Finite Difference GridsBy J. A. Procarione, M. K. McCarter, Bradley C. Paul
A numerical technique is described which can be used to model the quantity and distribution of air flow through broken rock. The method can also describe gas concentration and temperature distribution
Jan 1, 1989
-
Operation Of A Commercial Scale Bioleach Reactor At The Congress Gold PropertyBy Ralph P. Hackl
The Congress gold property, located near Goldbridge, B.C., is extremely refractory with most of the gold disseminated in fine- grained arsenopyrite. Metallurgical testwork conducted by Giant Bay Biote
Jan 1, 1990
-
2. Installation of a Major System - Responsibility Reporting ? IntroductionBy Lorraine B. Yde
Successful implementation of computer systems deals with meeting final systems objectives and cost and schedule requirements, but the final success is dependent upon personal inter- action. This is a
Jan 1, 1979
-
Operating Data For An Alpine Miner Used At The Nevada Test Site With A Conveyor For Rail Haulage Muck DisposalBy Richard V. Good, John B. Harvey, Lloyd S. Jones
INTRODUCTION The term "Rapid Underground Excavation" is generally associated with high speed tunnel advance with large volumes of excavation, and indeed this is the type of work for which most of t
Jan 1, 1997
-
A Decision Support System For The Management Of The Mineral Resources Of A Developing CountryBy G. D. Schena
A decision support system for the management of the mineral resources of a developing country has been derived. The system allows the evaluation of the impact of a mineral project in a developing coun
Jan 1, 1992
-
A New Optimum Pit Limit Design AlgorithmBy Yixian Zhao
Although many ultimate pit limit design algorithms have been developed for the past one- quarter century, only the well known Lerchs-Grossmann's (LG) algorithm is capable of producing a truly opt
Jan 1, 1992
-
Regulation Of Mining, Milling, And Smelting Wastes Under Superfund: Regulatory And Liability FrameworkBy R. Callaway
The Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (?CERCLA?), as amended by the Superfund Amendments and Reauthorization Act of 1986 ("SARA?) establishes a comprehensiv
Jan 1, 1988
-
Influence Of Passageway Fires On Ventilation FlowsBy C. K. Lee
The influence of passageway fires on ventilation flows was investigated in three horizontal fire tunnel s: 1. a laboratory-scale fire tunnel network, 2. a small-scale fire-plume tunnel, and 3. a large
Jan 1, 1980
-
Technical Note - Sulfuric Acid Leaching Of Igarapé Bahia Gold-Copper Ore For Copper Extraction - An Ore Pretreatment For Gold Recovery By CyanidationBy F. D. Mendes, A. H. Martins
The high copper grade in the Igarapé Bahia (Brazil) gold-copper ore restricts the direct application of the classical cyanidation process. Copper oxide and sulfide minerals react with cyanides in solu
Jan 1, 2003
-
Groundwater Evaluation and Control for Gold Mining ProjectsBy Adrian Brown
Groundwater inflow and impacts have become major aspects in the permitting and operation of many gold mines. First, the hydrothermal or placer genesis of many of the orebodies being investigated or pr
Jan 1, 1988
-
Mining Company Performance Improvement Programs and Results-Summary of Benchmarking StudyBy Peter Fordham
A Norbridge review of 25 top mining companies highlighted financial problems for many firms. To better understand these results, Norbridge benchmarked 17 mining companies to understand the problems th
Jan 1, 2004
-
The Copper Segregation ProcessBy Maurice Rey
The copper segregation process is designed to concentrate oxidized copper ores or mixed sulfide-oxide copper ores which are refractory to normal and cheaper mineral dressing or leaching processes. Suc
Jan 1, 1985
-
Simulation and Animation of the Materials Handling for a Working SmelterBy Thomas Fliess, Klaus-Christof Ritter, John R. Sturgul
The optimum flow of materials through a smelter is an extremely important phase of the mining cycle. A typical copper smelter will have up to $US 1,000,000 per day of copper being processed. The motio
Jan 1, 1996
-
Direct Three-Dimensional Liberation Analysis by Cone Beam X-Ray MicrotomographyBy J. D. Miller, C. L. Lin
Liberation of valuable minerals during size reduction is an important aspect of mineral processing technology. In practice, most quantitative information on liberation is based on the application of s
Jan 1, 1997
-
Knowledge Representation Issues Pertaining To Mine Ventilation KBS Development (cc6ab886-7b63-4708-be07-9212b667ae40)By R. V. Ramani, K. V. K. Prasad, M. Swaminathan
Engineering design involves, in addition to numerical calculations, considerable amount of expertise and judgement. The expertise and judgement is required to conceptualize and idealize the problem, s
Jan 1, 1989
-
An Investigation Of Mine Thermal Draught Dynamics IntroductionBy Todor P. Stefanov
The thermal draught within ventilation networks of underground mines depends to a great extent on the shafts depths and degree of change of ventilating air density. When the topology and space orienta
Jan 1, 1980
-
Comparison Between Predicted and Measured South Drift Closures at the WIPP Using a Transient Creep Model for SaltBy A. F. Fossum, D. E. Munson
The U. S. Department of Energy is constructing and operating the Waste Isolation Pilot Plant (WIPP), a research and development facility near Carlsbad, New Mexico, to determine whether or not defense-
Jan 1, 1986
-
Technology News - Using Mobile Satellites For Exploration Work - Fraser ClaridgeA group of geologists is located in a remote area of North America, without telephone lines, electricity or even running water. They have spent days accumulating data for a mining company that is eage
Jan 1, 1999
-
Mine Design at the Cannon Mine: Integration of Operational Planning and Geomechanical DesignBy J. F. T. Agapito, C. E. Brechtel, C. J. Gilbert, T. R. Kelly, R. C. Karlson
A multi-lift benching cut-and-fill mining method was adopted at Asamera Minerals (U. S.), Inc.'s Cannon Mine to balance the goals of high productivity and near 100 percent recovery with the need
Jan 1, 1987