Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Manhattan Mine: Linking Reclamation and Sustainable DevelopmentBy Mark Ioli, Debra Struhsacker
In September 2004, Gale Norton, U.S. Secretary of the Interior, presented the Manhattan Mine with a U.S. Bureau of Land Management’s 2004 Hardrock Mineral Environmental Award. The Manhattan Mine is a
Jan 1, 2005
-
Concentration Of Utah Tar Sands By An Ambient Temperature Flotation ProcessBy J. D. Miller
Physical separation of bitumen from low-grade Utah tar sand deposits containing a relatively high viscosity bitumen phase (Sunnyside and Tar Sand Triangle deposits) has been accomplished by traditiona
Jan 1, 1981
-
Mechanical Mining: Challenges and DirectionsBy Richard E. Gertsch
Mechanical mining holds great promise for the mining industry. Realizing this promise depends on developing the tools needed to mechanize a mining operation with a reasonable expectation of success.
Jan 1, 1994
-
Solid Phase Characterization For Metal Mine Waste Drainage Quality PredictionBy K. Lapakko
Several static tests estimate the capacity of mine waste to produce and neutralize acid and are used as tools for predicting metal-mine waste drainage quality. Various methods and their accuracies ar
Jan 1, 2003
-
Large Flotation Cells In The Copper Processing Industry ? Recent Experiences And Future Considerations (Part 1)By D. Govender
In recent years, economies of scale have continued to drive copper projects to larger throughputs to offset depleting lower grade resources. A decade ago there were only a small number of projects tha
Feb 27, 2013
-
Columbus Circle Station Complex - History and RehabilitationBy Aram Grigoryan
This paper addresses historical aspects and construction sequencing of the subway complex under Columbus Circle in Manhattan; the structural elements of the rehabilitation and new construction; and th
Jan 1, 2008
-
High Speed Shotcrete Tunneling in Chalk for the Channel Tunnel Rail Link in the United Kingdom (North Downs Tunnel)By Christian Neumann, Josef Arnold, Albin Reinhart
The Channel Tunnel Rail Link (CTRL) is the most significant railway infrastructure development project in the United Kingdom since the construction of the Channel Tunnel between France and England. Th
Jan 1, 2001
-
Sao Paulo Metro Project?Control Of Settlements In Variable Soil Conditions Through EPB Pressure And Bicomponent Backfill GroutBy Lorenzo Pellegrini
The respect of EPB reference pressure during TBM advance and hyperbaric activities, the complete and effective filling of the annular gap between tunnel lining extrados and the excavation section and
-
Synthetic aperture sonar as a tool for rapid high resolution deposit estimationBy Rolf Birger Pedersen, Alden Ross Denny
"Synthetic Aperature Sonar (SAS) is a powerful tool for ultra-high resolution marine survey. The Kongsberg HiSAS system deployed on the HUGIN AUV has a rangeindependent resolution of 3x3 cm for sonar
Sep 1, 2014
-
The Modelling Of Froth Zone Recovery In Batch And Continuously Operated Laboratory Flotation CellsBy Z. T. Mathe, M. A. Vera, M. C. Harris
This contribution presents a methodology how to quantify froth zone recovery in a continuously operated laboratory mechanical flotation cell. The methodology consists of relating the overall flotatio
Jan 1, 2001
-
Update On Deployment Of Gamma Radiation Controls For Surface CoalBy L. Frederick
Measurement of gamma radiation occurring in nature to characterize geological formations has been widely recognized in mineral exploration. Different methods and apparatuses have been developed for dr
Feb 27, 2013
-
Industrial Minerals 1986 - Barite, Bauxite and aluminaBy R. J. Anderson, A. V. Castelli
In 1986, United States' barite production fell 48.9%, consumption - sold or used by grinding plants - was off 47.3%, and imports were down 63.8%. Meanwhile, world mine production decreased 29.6%,
Jan 5, 1987
-
Horse: Value-Based Objective Functions Applied to Circuit AnalysisBy A. Noble
Linear circuit analysis (LCA) is a fundamental tool which has been used to evaluate mineral separation circuits during the preliminary design phase. Traditionally, the LCA methodology uses the analyt
Feb 23, 2014
-
Employment opportunities in the coal industryBy T. R. Jr. McMillan
Introduction Examining the short- and long-term job prospects for engineers in the coal industry might include looking at coal tonnage projections, future export markets, federal regulations, and the
Jan 2, 1985
-
Underground Caving Shield Change Outs At Us Steel’s Oak Grove MineBy B. Weyerman
U. S. Steel's Oak Grove Mine experienced several top hinge failures on their caving shields. It was determined that all the caving shields needed to be replaced with new caving shields before mor
Jan 1, 2001
-
Rock Melting Subterrenes--Their Role In Future Excavation TechnologyBy Charles A. Bankston, John C. Rowley, Robert J. Hanold, Joseph W. Neudecker
The basic concepts and processes of soil and rock melting as applied to excavation technology are reviewed. The electrically heated, small diameter prototype penetrator development sequence is present
Jan 1, 1974
-
Discussion - Lime substitutes for the treatment of acid mine drainage - by G.W. Heunisch Technical Papers, MINING ENGINEERING, Vol. 39, No. 1 January 1987, pp. 99-96By L. B. Anderson, G. A. Carmody
We wish to comment on the paper by G.W. Heunisch (MINING ENGINEERING, January 1987), which raised several important points regarding treatment of acidic waste waters. This paper confirms, in part, tes
Jan 1, 1988
-
An Underground Concept For Oil Field Development In Offshore AreasBy Cherie H. Tilley
The possibility of drilling oil wells from underground locations is not a new concept. It bas not been cost effective for the oil industry in the past and therefore disregarded. Today's state of
Jan 1, 1983
-
Asbestos Mining In Russia: Approaches To Public Health Risk AssessmentBy A. Korchevskiy
While Russia continues to be a worldwide leader in asbestos production, the environmental and health status around Russian asbestos mines is not well known and understood, internationally. A literatu
Feb 27, 2013
-
Actual vs. Baseline Tracking During TBM Tunneling In Highly Variable Glacial GeologyBy Ulf G. Gwildis
The Bright water Conveyance System includes 21 km of tunnels mined by two earth pressure balance Tunnel Boring Machines (TBMs) and two slurry TBMs. The probabilistic baseline approach defined in the G