Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Have Emerging Technologies Reached the Point Where Diesel Particulate Matter can be removed from Underground Mines?

    By K. C. Kocsis

    "Diesel-powered equipment has allowed the mining industry to raise production rates and significantly improve productivity, as it is rugged, mobile and reliable, but its widespread use in underground

    Jan 10, 2017

  • SME
    The Mercer Clay in Pennsylvania as a Polymetallic Mineral Resource: Review and Update - Mining, Metallurgy & Exploration (2021)

    By Lee R. Kump, Sarma V. Pisupati, Peter L. Rozelle, Alan R. Larson, Timothy S. White, Nicholas A. Crescenzo, Maureen D. Feineman

    The Mercer Clay bed in central Pennsylvania has produced feedstocks for the refractory industry in the USA and has also been investigated as a source of alumina and lithium. Developments in global mar

    Jul 22, 2021

  • SME
    Understanding Charge Effects on Marked Ball Wear Rates: a Corrosion Study — Part 2. The Impact of Chromium Content in Media and Dissolved Oxygen - Mining, Metallurgy & Exploration (2023)

    By Michael S. Moats, John Bailey Fletcher

    Wear rates of grinding media can be misrepresented by marked ball wear tests (MBWT). Galvanic interactions between dissimilar grinding media can be affected by the chromium content in the media and th

    Dec 21, 2022

  • SME
    Grouting Aggressive Ground in Qatar - NAT2024

    By Hernan Fernandez, Khalid Saif F S Al- Khayareen, Volkan Salepciler, Jacek B. Stypulkowski

    Wakrah and Wukair Drainage Tunnel, WWDT is 13 km long with a 4.5 m ID sewer water tunnel about 50 to 60 m below ground surface. Integral to the project are several adits with provisions for future con

    Jun 23, 2024

  • SME
    A Shaft-Electric Furnace For Melting And Smelting

    By G. E. Viens

    The electric arc furnace has characteristics which make it attractive for a number of metallurgical applications. Some of these characteristics are: high thermal efficiency, the possibility of attaini

    Jan 1, 1971

  • SME
    Improvement Of Longwall Bit Design (2515ab35-820d-4a22-94cf-dcc1d9c5ed44)

    By Yi Luo

    In a shearer longwall mining operation, the longwall bits are responsible for breaking into and chip-ping the broken coal blocks away from the coal face. However, underground observations have found t

    Jan 1, 1996

  • SME
    Physical Coal Cleaning To Reduce Illinois No. 6 Seam Coal's Slagging Potential (4d6d8d96-e462-4178-9f9b-1fc25a23eea6)

    By Clark D. Harrison

    This paper compares the ash slagging potential of Illinois No. 6 Seam coal: as raw coal; as commercially cleaned coal processed in a baum-jig plant; and as coal cleaned to a reduced ash specification

    Jan 1, 1984

  • SME
    Dragline Extraction of 1.2 Million Tonnes of a 52-Meter Thick Vertically Dipping Coal Seam

    By T. J. Morris

    "From November 2014 through September 2016, Westmoreland’s Coal Valley Mine utilized a Marion 7450 electric walking dragline to extract 1.2 million tonnes of a vertically-dipping, 52-meter wide, fault

    Jan 1, 2017

  • SME
    Oil Shale Mining - Plans And Practices

    By Robert B. Crookston

    This paper presents a resume and status report: of mining technology appropriate to commercial oil shale development in the United States today. The nature and extent of oil shale in Colorado and Utah

    Jan 1, 1980

  • SME
    Ventilation and Air-Conditioning of the Meden Rid Mine in Ore Mining Below 1000 M from the Earth's Surface

    By Georgi N. Shoushoulov, Ventsislav D. Bozhilov

    The mining conditions in the Meden Rid mine at levels below 1000 m from the Earth's surface are specific and rather severe. The rock temperature is about 40-45°C. The air humidity in the workings

    Jan 1, 1997

  • SME
    Cyprus Coppertone Gold Benefits From Computerized Ore Control Procedures

    By Rodrigo Jerez

    Advances in inexpensive computer automation led to the development and use of a computerized ore control system at the Cyprus Copperstone Gold Mine near Parker, AZ. These new ore control practices imp

    Jan 1, 1991

  • SME
    Field Monitoring of Delayed Coal Burst in an Advancing Entry of a Deep Coal Mine - Mining, Metallurgy & Exploration (2021)

    By Shannon Seitz, Qingwen Shi, Junfeng Pan, Shuwen Wang, Brijes Mishra, Shaohong Liu

    Delayed coal bursts in deep coal mines have caused significant fatalities and economic losses in recent years. Instead of occurring right around the advancing face, this particular type of coal burst

    Oct 19, 2021

  • SME
    Designing and modeling mesh communications in underground coal mines

    By Michael E. Karmis

    New and developing communication systems en-able underground miners to, not only connect to the surface from an increased communication coverage area, but also to be discovered in the event of an emer

    Jun 1, 2010

  • SME
    A Parametric Study for the Effect of Dip on Stone Mine Pillar Stability Using a Simplified Model Geometry "Mining, Metallurgy & Exploration (2021)"

    By Morgan M. Sears, Gamal Rashed, Michael M. Murphy, Brent Slaker

    In this study, a parametric study was conducted using FLAC3D numerical models to examine the impact of oblique loading, generated from seam dip, on the strength and the failure propagation pattern of

    Feb 5, 2021

  • SME
    The Design Of Slope Stability Monitoring Systems ? 1. Introduction

    By Iain Weir-Jones

    The efficient operation of an open pit mine presupposes that the slopes are maintained at an angle which closely approaches that of the ultimate stability of the slope. In order to do this in a safe m

    Jan 1, 1975

  • SME
    Factors Bearing On The Interpretation Of In Situ Testing Results

    By D. J. Dodds, W. L. Schroeder

    INTRODUCTION The plate loading test is a simple, useful tool in rock mechanics. The test consists of applying load to a rock surface and noting the resulting deflections. Plate loading tests are ty

    Jan 1, 1974

  • SME
    Exploratory Finite Element Analysis (FEA) And Conceptual Design Findings Of Large-Diameter, Segmentally Lined Shafts

    By D. Kruse

    Top-down constructed large-diameter (up to 90 m or 300 ft) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study co

    Jan 1, 2011

  • SME
    Signifcant developments in dry rare-earth magnetic separation

    By M. Dobbins

    The advent of the more efficient and effective rare-earth roll (RER) separator in the early 1980s began a new era of dry magnetic separation. The RER units quickly became the separator of choice withi

    Jan 1, 2010

  • SME
    Mechanized Mining of Narrow Veins – Problems and Equipment Options

    By Jacek Paraszczak

    Numerous problems encountered in the mining of narrow vein deposits challenge the productivity, competitiveness and profitability of many mines. Mechanization of mining operations is one of the most i

    Jan 1, 1992

  • SME
    Determining the Benefit of Air Receivers in South African Deep‑Level Mines Using a Genetic Algorithm (Mining, Metallurgy & Exploration)

    By Michael David Harmse, Wiehan Adriaan Pelser, Jean Herman van Laar, Cornelius Stephanus Lodewyk Schutte

    The South African deep-level mining industry is characterised by high operating costs and narrowing profit margins. Compressed air is commonly the largest consumer of energy in these mines, and any in

    Jul 11, 2022