Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Study Of Stability Of Mercury And Silver Polythiocarbonate Nanofilms Generated During Optimized Mercury Removal From Cyanidation Pregnant EluateBy C. Bucknam, M. McComb
Mercury and silver polythiocarbonate sludge that was generated from the pilot testing of optimized mercury removal from cyanidation pregnant eluate solutions prior to Merrill-Crowe recovery of gold an
Jan 1, 2007
-
Collection Of Hydrophobic Particles In The Froth PhaseBy N. Ahmed
The collection of hydrophobic particles in the froth phase in flotation has been studied. A continuous flotation cell was developed, in which the froth phase could be isolated from the pulp zone. Hema
Jan 1, 2001
-
Using Optimizing Control System At CVRD’s Pelletizing PlantsBy Magno Rodrigues Ribeiro, Alexandre Cabral Stelzer, Cacio José da Silva, Leonardo Nogueira Ferri, Marcelo Ciminelli Mendes, Christophe Bouché, Marco Aurélio Soares Martins, Evenilson Soprani Lopes, José Xavier da Silva Filho, Sérgio Luiz Dalvi
Since 2001, CVRD is carrying out a modernization project in it’s pelletizing plant’s automation systems, that comprehends instrumentation, control and information systems. In addition, the project in
Jan 1, 2005
-
Modelling Liberation Of Comminuted Particles - Preprint 09-088One of the challenges in the development of mineral processing simulators is the modelling of liberation characteristics of particles produced by comminution circuits. Understanding the mineral charac
Jan 1, 2009
-
Composite Segmental Lining to Resist a Fault Rupture - RETC2021By Girish Roy, Robert Goodfellow, Angel Del Amo, Bingzhi Yang
Designing and constructing tunnels in seismic prone areas present unique challenges to both designers and contractors. The Westside Purple Line Extension Project– Section 3 in Los Angeles requires cro
Jun 13, 2021
-
Using Real Options To Manage Technical Risk In Life Of Mine Planning: Application At Chuquicamata Underground Copper Mine, ChileBy J. A. Botín
Traditional risk quantification methods provide little information on the sources of risk, and tend to produce static over-conservative evaluations, which do not account for changes in the performance
Feb 27, 2013
-
Better Fragmentation Through Team Work At Dos Pobres Mine Safford, AZBy D. Brandt
The Dos Pobres Mine is a copper oxide heap-leach mine located near Safford, Arizona. Mine production is 180,000 tons (163,293 tonnes) per day with a stripping ratio of 2:1. During the startup pha
Jan 1, 2011
-
Selection Of The Vertical Alignment Of Rapid Transit TunnelsBy Charles W. Daugherty, James P. Gould, Kenneth R. Ware
INTRODUCTION As illustrated in Figure 1, the Washington Metropolitan Area Transit Authority's (WMATA) rapid transit system (METRO) ultimately will comprise 100 miles of line divided among 10 r
Jan 1, 1976
-
Integrating Research and Development in E&C FirmsBy Roshan B. Bhappu
Integrating a research and development department into an engineering company's corporate structure can be rewarding to the engineering division, the R&D group, and, most of all, the company&apos
Jan 10, 1980
-
Mining Foundation of the Southwest Honors its 2004 InducteesThe 22nd Annual American Mining Hall of Fame Awards Banquet sponsored by the Mining Foundation of the Southwest will be held at the Westin La Paloma in Tucson, AZ on Saturday, Dec. 4, 2004. This ye
Jan 1, 2004
-
Characterization And Treatment Of Selenium In Water Discharged From Surface Coal Mining Operations In West VirginiaBy T. Harrison
Surface coal mines in West Virginia are receiving stringent NPDES discharge limits for total recoverable selenium. With limits in the low parts-per-billion range, selection and implementation of prope
Jan 1, 2010
-
Flue Gas Treatment For So2 Removal With Air-Sparged Hydrocyclone TechnologyBy R. Bokotko, J. D. Miller, J. Hupka
Laboratory results from an initial study on the removal of SO2 from gas mixtures are reported using air-sparged hydrocyclone (ASH) technology. Tap water and alkaline solutions were used for absorption
Jan 1, 2002
-
Evaluating the Status of Omo Forest ReserveBy T. O. Dauda, L. O. Ojo
One of the results of the Earth summit (The United Nations Conference) on Environment and Development - UNDP is the statement of forest principles. Others include: the Rio Declaration which is that th
Jan 1, 2005
-
Ways To Deal With Mine/Plant Effluent Residues: A Roadmap ProcessBy K. Tabra
In a mine operation, the proper strategy to handle residues is one of the main concerns, in particular when dealing with mine/plant liquid effluents. Most active water treatment systems at metal mines
Feb 27, 2013
-
Environmental Planning For A Coal Terminal In A Sensitive Offshore Environment ? IntroductionBy David Atkin
This paper presents methods and results of environmental planning conducted for a proposed coal and iron ore transshipment terminal which would be located on reclaimed land west of Lisbon, Portugal. O
Jan 1, 1983
-
Design Tools To Control Transients In Solvent Extraction Plants (SME Annual Meeting Feb. 26-28, Denver, Colorado)By G. Miller
The design of solvent extraction plants has been generally based on the assumption of steady operating conditions in both the settler and the mixers. Recent experience with both large and small plant
Jan 1, 2001
-
Improvements In Crusher ControlBy C. Ottergren
A process does not have higher capacity than what can pass through its bottleneck. Acknowledging this, and with the goal to optimize production at a minimum investment, one can use existing equipment,
Jan 1, 1999
-
Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO ProjectBy Jean Habimana
The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather
Jan 1, 2008
-
Assessment of Lining Performance of Tunnels Built in Cemented Fine-Grained Stiff SoilsBy Daniel de la Rosa, Juan Manuel Mayoral, Damián Vital
"This paper presents a numerical study regarding the loads, and the corresponding damage, taken by the primary and secondary lining of a tunnel built in cemented fine-grained stiff soils. This study a
Jan 1, 2016
-
T& UC Tunnel DemandTABLE TUNNEL NAME OWNER LOCATION STATE TUNNEL USE LENGTH (FEET) WIDTH (FEET) BID YEAR STATUS Gateway Tunnel project Amtrak Newark NJ Subway 14,600 24.5 2015 Under study
Sep 1, 2013