Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    New Laminated Displacement-Discontinuity Program: Fundamental Behavior

    By Keith A. Heasley

    In the past, numerous displacement-discontinuity (DD) models of stratified rock masses have been proposed using a homogeneous isotropic elastic overburden. In this paper, it is postulated that a lamin

    Jan 1, 1996

  • SME-ICGCM
    Geotechnical Mapping By Seismic Imaging In Underground Mines

    By W. J. Mcgaughey

    A crosshole seismic imaging (tomography) experiment has been carried out in an underground mine in order to delineate waste rock within a massive sulphide ore body. Data comprising 1526 travel time me

    Jan 1, 1989

  • SME-ICGCM
    Stability analysis and characterization of ground subsidence of abandoned lead-zinc mines in northeastern Oklahoma

    By M. M. Zarnan

    This paper presents the results of s study involving characterization of ground subsidence of abandoned lead-zinc mines in northeastern Oklahoma. Two coordinated efforts were undertaken: (1) collectio

    Jan 1, 1989

  • SME-ICGCM
    Classification Of Large Seismic Events At The Lucky Friday Mine

    By J. K. Whyatt

    The paper presents an approach to design a multi level room and pillar layout in a 40m thick seam overlain by a major aquifer. The design was required to maximise extraction with due consideration of

    Jan 1, 1996

  • SME-ICGCM
    Bi-Directional Shield Recovery in a Wide Face Longwall Move with a Pre-Driven Recovery Room under Weak Roof Conditions

    By Peter Zhang

    Shield recovery in a longwall move is normally conducted from tailgate to headgate. However, if the face is wide and the immediate roof is weak, difficult conditions with considerable roof sag, excess

    Jan 1, 2007

  • SME-ICGCM
    Improved Source Location And Evaluation Of Seismic Events Over A Deep Coal Mine

    By D. S. Choi

    This paper describes an improved source location technique for microseismic events related to coal mining. A system of non- linear distance equations is solved with the use of the Newton-Raphson metho

    Jan 1, 1990

  • SME-ICGCM
    Analytical Investigation of Shaft Damages at West Elk Mine

    By Tim Ross

    Several shear failures were observed in Shaft #1 at the Mountain Coal Company, LLC, West Elk Mine, after mining longwall Panel 23, 1,100 ft to the east of Shaft #1. It was speculated that this shear

    Jan 1, 2006

  • SME-ICGCM
    Relationship Between Floor Rock Stress And Floor Failure

    By X. S. Tan

    This paper deals with the analysis of stress condition on the interface between two types of floor rock materials when the vertical stress is larger, or when the horizontal stress is larger in a recta

    Jan 1, 1990

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • SME-ICGCM
    Rating Coal Mine Roof Strength From Exploratory Drill Core

    Characterizing coal mine roof rock is extremely important for hazard assessment, reinforcement, and entry design. The Coal Mine Roof Rating (CMRR) is an innovative rock mass classification that has fo

    Jan 1, 1996

  • SME-ICGCM
    Application Of Tomographic Imaging To Stability Assessment

    By Hamid Maleki

    Roof falls are one of the leading ground control problems that adversely influence productivity and worker safety in underground mines, construction sites, and nuclear waste repositories. To control r

    Jan 1, 1996

  • SME-ICGCM
    A Practical Solution to Highwall Mining Coal Reserves Sterilized by Auger Mining

    By Michael Amick

    Over the last few years as the coal industry has seen an increase in the price of coal, a renewed interest in the additional mining of pre-law highwall sites has occurred. Much premium coal and pro

    Jan 1, 2007

  • SME-ICGCM
    Rock Mechanics Investigations on Seismic Events Around Two Longwall Coal Operations

    By Michael Alber

    Coal mining by the longwall method typically causes seismic events. This paper describes the research on mining induced seismicity around two specific longwalls at 1100m depth under several old longwa

    Jan 1, 2008

  • SME-ICGCM
    An Applications Approach To Barrier Pillar Design For Improved Resource Recovery

    By John R. Koehler

    Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu

    Jan 1, 1989

  • SME-ICGCM
    Large Scale Ground Instability Caused By Failure of Underlying Pillars: A Case Study of Dynamic Multiple Seam Interaction

    By Christopher Mark

    Severe dynamic multiple seam interactions can occur when active mine workings are subsided by underlying mining activity. The most dramatic events are usually caused by longwall mining or pillar recov

    Jan 1, 2012

  • SME-ICGCM
    The Significance of Specimen Stiffness and Post Yield Characteristics on Passive Roof Support Design

    By Thomas M. Barczak

    The intent of this paper is to make mine operators and engineers aware of parameters which affect the loading behavior of passive roof support systems. The strength of a passive roof support element a

    Jan 1, 1987

  • SME-ICGCM
    Estimation Of Long-Term Stability Of Mine Pillars In Underground Pit

    By S. Yamashita

    Recently in Japan, unexpected degradation (surface subsidence) at old underground quarry sites, such as 'Ohya-Ishi' (pumice tuff) pit field has often been occurred. At these quarry sites, th

    Jan 1, 1996

  • SME-ICGCM
    Truss Systems For Longwall Tailgate Support - Update

    By John C. Stankus

    At the 13th Conference on Ground Control in Mining, a paper was presented detailing a successful test in which a new truss system was utilized, in lieu of wood cribs, for tailgate support in the Pitts

    Jan 1, 1995

  • SME-ICGCM
    Applications Of New Technologies To The Technical Design And Monitoring Of Longwall Panels

    By Brad R. Blair

    This paper will review impacts on longwall design and ground stability assessment due to advances in mine automation and sensing technology. Several new approaches to the prediction and monitoring of

    Jan 1, 1996

  • SME-ICGCM
    Microcomputer Simulation of Rock Blasting to Predict Fragmentation (e1b89d1b-bf88-4e3c-9f38-0d3739330b7a)

    By C. Dinis da Cama

    In order to reduce the complexity of mechanisms influencing rock- fragmentation by blasting a simulation approach is proposed, using the capabilities of micro-computer interactive graphics. Situat

    Jan 1, 1984