Search Documents

  • SAIMM
    When Is A Workplace Safe Or Unsafe?: The Safety Criterion In Terms Of The Occupational Health And Safety Act And The Mine Health And Safty Act - Mine And Occupational Health And Safety 2010 - 1 Statute And Common Law

    By Willem Le Roux

    Occupational health and safety is regulated by statute and common law. South Africa has, like many other countries, legislated extensively on occupational health and safety. Despite the body of legisl

    Jan 1, 2011

  • ISEE
    Development of Light ANFO

    By Yasunori Kosaka, Junya Tokita, Aramaki Shosaku, Inoue Junji

    Light ANFO that satisfies blasters and customers who want to reduce the amount of explosive consumption without changing blasting effects and designs and passes Cap sensitivity test regulated by law.

    Jan 1, 2002

  • AUSIMM
    The Design, Construction and Commissioning of No. 2 Concentrator, Mount Isa Mines Limited

    The ore treatment expansion programme at Mount Isa Mines required the erection of a new lead-zinc concentrator to be known as No. 2 Concentrator. This concentrator was designed by Western-Knapp Engine

    Jan 1, 1968

  • SME-ICGCM
    Geomechanic Monitoring And Distributed Information Systems

    By G. I. Gritsko

    In this paper we consider the elements of a distributed information geomechanic monitoring system which is used in computerized mine planning and mining operations control. The automated system is a t

    Jan 1, 1996

  • CIM
    History of China’s Electrolytic Copper Production

    By Changping Hu, Keqin Tan

    In 1937, the Metallurgical Department of the National Resources Committee established a copper refinery plant (predecessor of the Chongqing Smelter) in Changsha, Hunan Province, China. The blister cop

    Jan 1, 2019

  • AUSIMM
    Australian Innovations in High Pressure Grinding Rolls and Large Grinding Mill Manufacture

    By E J. Hofmann, J E. Hofmann, A J. Hofmann-Fritz

    "With its Head Quarters in Perth, global heavy engineering company Hofmann Engineering is one of the largest family owned engineering companies in Australia. The company has pioneered a number of new

    Jul 15, 2013

  • DFI
    Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results

    By Yogesh Prashar

    Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December

    Jan 1, 2002

  • NIOSH
    IC 7975 Injury Experience In Quarrying, 1957 ? Introduction And Summary

    By John C. Machisak

    THE INJURY data and experience at quarries and related plants of the United States are presented in this publication under the following general sections (A) General injury experience: Tables 1-3: C

    Jan 1, 1960

  • SME
    Longwall Mining Of Coal In Seams Pitching 30 Degrees

    By Keenan. Albert M

    The challenge of mining coal seams having a pitch of 30 degrees is one not frequently found in the United States, due primarily to the scarcity of such deposits. However, in the Thompson Creek Distric

    Jan 1, 1971

  • SME
    Implementing a tracking and ventilation control system at Barrick Goldstrike?s underground division

    By M. A. Meyer

    Underground mining accidents in the USA in recent times have prompted the Mine Safety and Health Administration (MSHA) to review emergency and tracking systems for underground mines. Several communica

    Jan 1, 2009

  • AUSIMM
    Historic Mining Landscapes of Central Otago

    As the theme of this conference is æRediscover OtagoÆ it would seem appropriate to revisit the era of the gold rushes and subsequent mining industry which rapidly advanced settlement and economic pros

    Jan 1, 1992

  • AUSIMM
    The Round Hill Gold-Scheelite Deposit, Macraes Flat, Otago, New Zealand

    The Round Hill gold-scheelite deposit is located three kilometres from Macraes Flat and approximately 60 kilometres due north of Dunedin, New Zealand. A mining feasibility study is currently being und

    Jan 1, 1987

  • AUSIMM
    Computer-Assisted Geological Mapping

    Measurements from an old survey are being machine processed as a pilot project in the development of a computer-assisted method of structural mapping in shield areas. The key element in the system is

    Jan 1, 1969

  • SME
    Development of a Robust Ultra-Wideband Module for Underground Positioning and Collision Avoidance "Mining, Metallurgy & Exploration (2020)"

    By RALPH BALTES, AMIR EHSAN KIANFAR, FABIAN UTH, ELISABETH CLAUSEN

    As indoor positioning provides particular challenges due to the unavailability of GPS signals, various systems such as ultrawideband (UWB), radio frequency identification (RFID), ultrasound, and wirel

    Jul 31, 2020

  • CIM
    A Benchmarking Tool for Assessing Flotation Cell Performance

    By Jan E. Nesset, James A. Finch, Wei Zhang

    "Bubbles are unquestionably the heart of the flotation process. Their size and combined surface area are largely what drive the recovery process. This suggests that plant engineers should be aware of

    Jan 1, 2012

  • NIOSH
    RI 7995 Oil Shale Retorting in a 150-Ton Batch-Type Pilot Plant

    By A. E. Harak

    To determine the retorting characteristics of a column of mine-run, ungraded oil shale ranging in size from fines to 5-ton pieces, a 150-ton batch-type retort was designed and constructed at the Burea

    Jan 1, 1974

  • AIME
    Notes On Titanium And On The Cleansing Effect Of Titanium On Cast-Iron.

    By Bradley Stoughton

    (Cleveland Meeting, October, 1912.) [SECRETARY'S NOTE.-To avoid repetition of foot-notes, references to authorities are made in this paper by means of figures, referring to a numbered list in th

    Nov 1, 1912

  • SME
    Numerical Evaluation of Tunnel Lining in Visco?elastic creep active ground

    By Kyoosang Yoo

    The report presents the results corresponding to the analysis of a lining system for tunnels in soil and soft rock in creep-active ground. The purpose of the analysis is to evaluate the performance of

    Jan 1, 2010

  • SAIMM
    Masjed-e-Soleiman HEPP, Iran Rock Engineering Investigations, Analysis, Design and Construction

    By F. B. Samani, B. Stabel

    The 1,000 MW Hydro Power Station Masjed-e-Soleiman (formerly called Godar-e-Landar) in Iran is under construction since 1992. The rock engineering aspects of the major underground structure, i.e. the

    Jan 1, 2003

  • NIOSH
    OFR-154-83 Validation And Extension Of Visibility Requirements Analysis For Underground Mining Equipment

    By Mark S. Sanders

    Six underground coal mine shuttle cars (three high seam and three low seam) were used to assess visibility using the concept of visual attention locations (VALs) and an improved human eye reference me

    Jan 1, 1983