Search Documents

  • AUSIMM
    An overview of ventilation and gas management systems in an underground coalmine in Iran

    By S M. Aminossadati, R Bagherpour, F Hasheminasab

    Mine ventilation is an essential part of underground mining operations used to provide fresh and cool air, as well as to dilute and remove contaminants from the work environment. This paper presents a

    Aug 28, 2017

  • SME
    Rapid Monitoring Of Coal Refuse Embankments

    By Lawrence H. Roth

    Past failures of coal refuse embankments have resulted in intensified efforts in inspections of coal refuse sites by the Mining. Enforcement, and Safety Administration (MESA). MESA inspections however

    Jan 1, 1980

  • SAIMM
    SPOTLIGHT on the Mine Metallurgical Managers' Association of South Africa

    By A. Buncombe

    In March 1984, two years' work by senior metallurgical personnel from the six major mining groups culminated in the formation of the Mine Metallurgical Managers' Association of South Africa.

    Jan 1, 1987

  • AUSIMM
    The Metallurgical Development of an Enargite-Bearing Deposit

    The Metallurgical Development of an Enargite-Bearing Deposit

    Sep 13, 2010

  • CIM
    "Operational Readiness" - A Value Proposition

    By J. E. Amadi-Echendu, F. Stober, J. Ndlovu, L. R. Nelson

    The Polokwane Smelter Complex (PSC) relies on a single 68MW high-intensity six-in-line furnace to smelt a planned 650 000 t/a dry concentrate to produce a platinum group metals (PGM)-bearing matte. As

    Jan 1, 2005

  • AUSIMM
    Advanced Media-Free Fine and Ultra-Fine Grinding - The Kelsey Axial Displacement Mill

    By J Kelly, C Kelsey

    The Autogenous Kelsey Axial Displacement (KAD) mill is essentially a short retention time centrifugal mill, designed to effectively harness extraordinarily high concentrations of input energy for effi

    Jul 15, 2013

  • SME
    Cyprus-Pima Pilot Plant Predictions Vs. Actual Plant Results

    By Fred Pena

    Cyprus Pima Mining Company is located in the Mineral Hill District of southern Arizona, approximately 22 miles south-southeast of Tucson. Cyprus Pima Mining Company is owned 50.01% by Cyprus Mines Cor

    Jan 1, 1974

  • SME-ICGCM
    A Method for Sizing Longwall Pillars Based on Field Measurements

    By Christopher Mark

    A new method for the design of longwall pillars, called "Analysis of Longwall Pillar Stability" (ALPS), is described. The method is the final result of a research program that included two major field

    Jan 1, 1987

  • NIOSH
    MLA 8-82 - Mineral Investigation Of The Garcia Mountain Rare II Area ( No. 5107), San Luis Obispo County, California

    By David A. Lipton

    In 1980, the U.S. Bureau of Mines conducted a mineral survey of the 23,500 acre Garcia Mountain RARE II area (No. 5107) in the Los Padres National Forest. Bureau of Mines data indicate a low potentia

    Jan 1, 1982

  • AUSIMM
    Hybrid Process Control Strategy for the Ok Tedi Mining Ltd Semi-Autogenous Grinding Mill #2 - A Comparative Analysis

    By G Metzner, R Rodriguez, C Savage

    OK Tedi Mining Ltd. (OTML) is in the process of optimising the concentrator performance. One aspect that has been recently implemented is an upgrade of the existing expert control philosophy on the gr

    Jul 15, 2013

  • CIM
    A Novel Separation Process for Detoxifying Cadmium-Containing Residues from Zinc Purification Plants

    By Diankun Lu, Ganfeng Tu, Edouard Asselin, Feng Xie

    A novel separation process for detoxifying cadmium-containing residues arising from zinc hydrometallurgical processes has been developed. An initial investigation indicated that a high concentration o

    Jan 1, 2014

  • CIM
    Autogenous and semi-autogenous mill circuits

    By A. K. Ratte, C. M. Brown

    "IntroductionIn autogenous mills, grinding of the ore feed is accomplished by the direct action of the variously sized rocks making up the feed on each other and the mill interior. Size reduction is a

    Jan 1, 1989

  • ISEE
    Concepts and Case Study for Regular Rhythmic Timing and Sequence

    By Neal Lee, Braden T. Lusk, Jhon Silva-Castro, Patrick J. Jenks

    "Timing and charge sequence are very important for optimized blast design. Traditional nonelectricinitiation systems have moved the industry toward a system of delays consisting of hole-to-hole androw

    Jan 1, 2016

  • AUSIMM
    Separation of Nickel and Cobalt from Manganese, Magnesium and Calcium by Synergistic Solvent Extraction - From Batch Tests to Pilot Plant Operation

    Separation of Nickel and Cobalt from Manganese, Magnesium and Calcium by Synergistic Solvent Extraction - From Batch Tests to Pilot Plant Operation The synergistic solvent extraction system consistin

    Sep 13, 2010

  • DFI
    Large Diameter CIDH Construction In Cohesionless Soils By The Use Of Rotator/Ocsillator Techniques: A Case Study - 116th Avenue Bridge Over The Gila River Phoenix, Az.

    By M. Cornelius

    Drilled shaft construction through caving soils has historically been an uncertain, risky and costly operation. Uncertain, because the zone of caving may or may not be known, risky because the loss of

    Jan 1, 1999

  • SME
    Risk analysis for evaluation of mine impounded water

    By Michael Gobla

    "Since 1994 the Bureau of Reclamation (BOR) has used risk analysis to evaluate dams. Risk considers both the likelihood of failure and the expected consequences should failure occur. Risk analysis rel

    Dec 1, 2016

  • SAIMM
    Keynote Address: EPRI?s Global Coal Initiative

    By S. Dalton

    The use of coal for power generation is being questioned in many developed countries, as a result of ever-tightening environmental restrictions and concerns about the potential impact of CO2emissions

    Jan 1, 2001

  • AUSIMM
    The Composition of Ore from the Lloyd Copper Mine, Burraga, N.S.W

    In an earlier paper (Stanton, 1953) a brief account was given of the geological environment and structure of the Lloyd Copper Mine orebody, Burraga, N.S.W. The present paper is concerned with the chem

    Jan 1, 1955

  • SME-ICGCM
    Analytical Solutions of Hard Roof’s Bending Moment, Deflection, and Energy under Front Abutment Pressure before Periodic Weighting

    By Yun Zhang, Haijun Jiang, Shenggen Cao, Chen Wang

    The distribution of front abutment pressure is closely related to the force, deformation and energy distribution of hard roof before periodic weighting. So it is necessary to carry out research on the

    Jan 1, 2015

  • ISEE
    JK Simblast - Blast Simulation and Management

    By Mike Higgins

    "Data management is emerging as a major concern for miners. Engineers today are faced with anextensive array of data from varying sources, and are required to consolidate and analyse thisinformation t

    Jan 1, 1998