Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
MLA 30-93 - Mineral Appraisal Of Coronado National Forest, Part 6 - Dragoon Mountains Unit Cochise County, ArizonaBy Mark L. Chatman
The U.S. Bureau of Mines studied mineral resources of the Dragoon Mountains Unit, Coronado National Forest (54,264 ac), Cochise County, AZ. This study involves literature and field investigations with
Jan 1, 1993
-
IC 7468 Safety Achievements of the Continental Mine, Continental-Archbald Coal Co., Scranton, Lackawanna County, PaBy H. A. Schrecengost, H. R. Gil, Alfred Clarkson, E. H. McCleary
Much has been written and many discussions have been held concerning the prevention of accidents in coal mines , and considerable progress has been made in eliminating hazards to the health and safety
Jun 1, 1948
-
Medición de los proyectos de responsabilidad socialBy Cesar Sáenz Acosta
El presente texto señala las mediciones de impactos que se han realizado a los programas de responsabilidad social de una empresa minera. Esta medición se realizó a través del cálculo del indicador “R
Sep 12, 2011
-
Progress in Dust Control at Ontario MinesBy Clifford S. Gibson
A year ago a paper (1) was presented at the Annual Western Meeting of the Institute regarding silicosis in Ontario mines. It described the whole problem as we see it and discussed the means of prevent
Jan 1, 1939
-
Sappington Bridge: An Opportunity for Strengthening Research and Demolition TrainingBy J. Baird
The Sappington Bridge, a steel arch span bridge constructed in 1904 over the Meramec River, was demolished due to its advanced state of deterioration. The demolition was a project to benefit Crawford
Jan 1, 2003
-
Some effects of earth-movement on the Coal-Measures of the Sheffield district (South Yorkshire and the neighbouring parts of West Yorkshire, Derbyshire, and Nottinghamshire), part IIBy Fearnsides W. G.
The second part of the paper, presented at the Midland Institute of Mining, Civil and Mechanical Engineers' general meeting held in Doncaster on 27th May 1916, addresses the post-Carboniferous and pre
Dec 1, 1916
-
Gold Ore Treatment at Macraes FlatMacraes Mining Company Limited operates a 2.1 million tonnes per annum gold processing plant at Macraes Flat, Otago. This uses a conventional CIL route to treat oxide ore, and a flotation, grind, CIL
Jan 1, 1992
-
RI 2948 Crushing Resistance Of MineralsBy S. R. Zimmerley
Recent investigations of finely ground materials have verified Rittinger's law of crushing.4, This law states that the surface produced is proportional to the work expended in the crushing operat
Jan 1, 1929
-
The Mine Management System at Olympic Dam MineThe operations management system at Olympic Dam has evolved over a two-year period to the state described in this paper. This evolution has been driven largely by the requirements of the recent expans
Jan 1, 2000
-
Comparative Tests Of Hammer Drill BitsBy Carroll Forbes
INTRODUCTION MANY different shapes of drill bits are in use with hammer drills, but little definite information is available whereby to judge which one of these shapes is the best. The following inv
Jan 8, 1917
-
Path Planning and Position Control for Autonomous Loading Operation by Wheel LoaderAuthors have been conducting research on autonomous loading operation by wheel loader. Autonomous loading cycles has been demonstrated with real size experimental model. In V shape loading operation,
Dec 6, 2010
-
RI 4337 Investigation Of Melrose Zinc-Lead District Ottawa County, Okla., And Cherokee County, Kans.By Clinton C. Knox
To demonstrate the feasibility of unwatering ore reserves previously indicated in the virgin Melrose zinc-lead field in Kansas and Oklahoma, the Bureau of Mines .carried through a pumping project on t
Jan 1, 1948
-
Process Description And Short History Of Polokwane SmelterBy J. Ndlovu, R. Hundermark
Keywords: Anglo Platinum, Polokwane Smelter, pyrometallurgy, metallurgy, platinum, platinum group metals, PGM, base metals, nickel, copper, sulphide smelting, electric furnace, Söderberg, electrode, m
Jan 1, 2006
-
RI 3199 A Study Of Falls Of Roof And Coal In Northern ColoradoBy H. Tomlinson
Fatalities from falls of roof and coal are responsible for the death of more than 1,000 miners annually in the bituminous coal mines of the United States, or practically one-half of the total fataliti
Jan 1, 1933
-
Momentum Theory – A New Calculation of Blast Design and Assessment of Blast VibrationsBy Robert Boehnke, Bernd Mueller
Despite enormous efforts over the last decades there are still many unanswered questions with respect to calculation and modeling of the blast process using appropriate physical laws. Most calculation
Jan 1, 2003
-
IC 8315 Wyoming Iron-Ore Deposits - Description, Beneficiation Processes, And Economics (c32c420a-e8af-4801-8eae-8e33dcecd86b)By C. M. Harrer
The location, features, quality, and extent of iron ore deposits are evaluated in this Bureau of Mines report. The results of pioneer beneficiation on Wyoming taconites and their success are discussed
Jan 1, 1966
-
IC 8315 Wyoming Iron-Ore Deposits - Description, Beneficiation Processes, And EconomicsBy C. M. Harrer
The location, features, quality, and extent of iron ore deposits are evaluated in this Bureau of Mines report. The results of pioneer beneficiation on Wyoming taconites and their success are discussed
Jan 1, 1966
-
Investigations for a New Flowsheet and Plant at Wattle Gully Gold Mines N.L.By Woodcock J. T, Jackson N
Wattle Gully Gold Mines N.L. of Chewton, Victoria, has decided to replace its present battery plant by a new mill to treat a free milling gold ore, after fine grinding, by concentrating coarse gold in
Jan 1, 1959
-
Introducing HPGR quaternary crushers in a Russian magnetite operation – challenges and solutionsBy B C. Povey, K Lagutin, M Mryasov, V Noll
The current Stoilensky magnetite concentrator comprises a three-stage crushing circuit followed by three stages of ball milling, grinding and concentration to produce a magnetite concentrate with 66.5
Sep 11, 2017
-
Rabbit Lake project – environmental impactBy R. L. J. Phillips
"The environmental impact of the Rabbit Lake project is presented. Baseline data for fish, water, air and radon collected in 1973, 1975, 1980and 1986, are compared with post-development environmental
Jan 1, 1989