Search Documents

  • NIOSH
    RI 3338 Estimate Of Natural-Gas Reserves From The Layton, Oolitic, And Oswego-Prue Horizons In The Oklahoma City Oil Field ? Introduction (44a91fff-c2c0-4763-a3d3-3773dffbc146)

    By R. E. Heithecker

    In June 1933 the Bureau of Mines, in cooperation with the State of Oklahoma and the Oklahoma City Chamber of Commerce, published a report of the gas at reserves in the Oklahoma City oil field3/ based

    Jan 1, 1937

  • NIOSH
    RI 2238 Iceland Spar

    By Oliver Bowles

    "Properties and Uses.Iceland spar is a name given to a pure crystallized form of calcite (CaCo3) which is sufficiently transparent and free of defects to be used in the manufacture of optical instrume

    Apr 1, 1920

  • IIMP
    Herramientas de planeamiento estratégico para crear valor económico, social y ambiental en la empresa minera

    By Armando Gallegos Monteagudo

    El presente texto señala las experiencias realizadas en GERENS, empresa de consultoría y capacitación en gestión del sector minero, formulación, implementación y control de planes estratégicos que uti

    Sep 12, 2005

  • NIOSH
    IC 7609 Why Men Were Killed At Pennsylvania Anthracite Mines In 1950 - Introduction

    By J. J. Forbes

    The investigation of major and minor coal-mine disasters has been a routine function of the Bureau of Mines since its inception in 1910, and the facts obtained during such investigations have been use

    Jan 1, 1951

  • SME
    Double Shield TBM In Challenging, Difficult Ground Conditions?A Case Study From Zagros Long Water Transfer Tunnel, Iran

    By Jafar Khademi Hamidi

    The Zagros long tunnel is one of the main components of Sirvan water transfer project in western Iran. It is approximately 48 km in length and consisted of two lots. The second 26 km lot of this tunne

  • DFI
    Prescriptive Specification Design: The Impact on Cost and Constructability – Case History

    By Shawna Munn, Nadir Ansari, Allison Bennett

    "This paper outlines how specification driven design has made Toronto Area transit infrastructure projects more expensive than similar private projects, and provides a case study of the results of an

    Jan 1, 2017

  • DFI
    Getting Paid In Hard Times - I. Formation Of The Contract

    By Dennis J. Riley

    A. This outline addresses what a sub-contractor, or a subsub-contractor should do to get paid in the event the general contractor or building owner files for bankruptcy. B. Negotiating payment ter

    Jan 1, 1991

  • CIM
    The transition of mining methods at Anderson Lake Mine

    By Seppo Haapamaki

    "Since it started production in 1970, Anderson Lake Mine has experienced several radical changes in mining methods as a result of the physical characteristics of the ore zone along with the need for i

    Jan 1, 1988

  • CIM
    Building the Next Major Iron Ore Mine in the Labrador Trough

    Certain information contained herein regarding Champion Minerals Inc., including management?s assessment of future plans and operations, may constitute forward-looking statements under applicable secu

    May 1, 2011

  • AUSIMM
    A Transparent and Pragmatic Quantitative Risk Assessment Process for Assessing Fire Safety in New Zealand Tunnels

    By T Ireland, B Wright, S Weaver

    All tunnels have unique characteristics that result in different fire and life safety risk. The fire safety systems for each tunnel also give different benefits at different costs. It is therefore nei

    Sep 17, 2014

  • CIM
    The Cariboo and Bridge River Goldfields, British Columbia

    By Victor Dolmage

    Introduction Although gold production in British Columbia began in 1859, lode gold was not produced till 1893. Since 1900, the annual production of lode gold has fluctuated between $3,000,000 and $6,

    Jan 1, 1934

  • NIOSH
    Application Of The Q-System To Australian Underground Metal Mines

    By Max F. Lee, Warren A. Peck

    The applicability of the Q-system [Barton et al. 1974] to Australian underground metal mines is discussed with reference to two common design issues: ground support for horizontal mine development, an

    Jan 5, 2007

  • SME
    Analysis Of Sampling And Slurry Flow Using Multi-Physics Modeling - Preprint 09-058

    By D. McBride

    Representative samples are required from process streams in order to accurately measure chemical and physical characteristics. This information can then be used by process operators and metallurgists

    Jan 1, 2009

  • NIOSH
    RI 2277 Selected Bibliography on Oil Shale

    By E. H. Burroughs, M. J. Gavin

    The references in the following compilation are selected chiefly from the literature of the years 1915-1920 , though a few of the more valuable standard works published before that period have necessa

    Sep 1, 1921

  • DFI
    Driven Piles For New Pacific Northwest Baseball Park - Introduction

    By Thomas M. Gurtowski

    The New Pacific Northwest Baseball Park, now known as Safeco Field, is located directly south of the Kingdome in Seattle, Washington, and will be the new home of the Seattle Mariners baseball team. Th

    Jan 1, 1998

  • NIOSH
    OFR-93-75 Development Of An Optical Carbon Monoxide Detector

    By Burton Scott

    A device for detecting carbon monoxide at ppm levels is described which is based on the measurement of infrared absorption at 4.65 microns. The unique feature of the nondispersive infrared instrument

    Jan 1, 1975

  • NIOSH
    RI 8519 Effects of Humidity on Salt Mine Dust: A Preliminary Report

    A preliminary study was conducted by the Bureau of Mines to determine the effect of humidity on salt mine airborne dust levels. Results showed less dust where the humidity was elevated. Dust reduction

    Jan 1, 1980

  • AIME
    Institute of Metals Division - Effects of Strain Rate and Temperature on Yield Points

    By R. J. Arsenault

    The yield drop that occurs in tantalum, Cu-AZ. and Ag-Al was investigated as a function of strain rate and at several temperatures. From the strain-rate dependence of the yield drop an activation volu

    Jan 1, 1964

  • SME
    The Mineral Nature Of Asbestos

    By Malcolm Ross

    Fibrous minerals are common in nature but asbestiform minerals are rare. The unique mineralogical characteristic common to all the asbestos minerals is their morphologic form (or habit of crystallizat

    Jan 1, 2007

  • SME
    Quick-Erect Stopping System for Radiation Protection and Mine Rescue in Small-scale Mining "Mining, Metallurgy & Exploration (2020)"

    By JÖRG DEHNERT, PETER WINDISCH, Bernd Schönherrt, JENS STOPP

    The Quick-Erect Stopping System (QESS) offers a new way of reducing the radon exposures of miners in Germany, especially during remediation work in old mines. The QESS is a light-weight, modular, and

    Jul 23, 2020