Search Documents

  • TMS
    A New Type of Multicomponent Phase Diagrams for the Evaluation of Process Parameters and Operating Conditions in Non-Ferrous Pyrometallurgy

    By Florian Kongoli

    New operating conditions and process parameters are often necessary in today's industrial practice of non-ferrous smelting and converting in order to accommodate various new chemical compositions

    Jan 1, 2000

  • AUSIMM
    Fundamental study for biomass char utilisation at sintering process in view of combustion property

    By T Takayama, R Muroi, M Matsumura

    The steel industry occupies 14 per cent of CO2 emissions in Japan, and the sintering process is one of the major emitters. Since most of CO2 released from the sintering process comes from coke fine co

    Nov 8, 2021

  • TMS
    Analysis Of The Molecular Form Of Arsenic In Silicate Slag

    By D. M. Dabbs

    A static dew point technique has been used to evaluate the solubility of arsenic in ?slag and its dependency on P02 at temperatures of 1458 and 1523K. The ferrous-ferric ion ratio of the slags ranged

    Jan 1, 1983

  • AIME
    Institute of Metals Division - Preparation and Properties of Ga ( As1-x Px) p-n Junction Lasers

    By Nick Holonyak

    Halogen vapor-transport synthesis of Ga(As,-,Px) and its preparation into laser junctions are described. Electrical and optical properties of Ga(As,-,PX) laser junctions are discussed. The present lim

    Jan 1, 1964

  • SME
    The 1990’s – Politics and the Environment

    By Georgene Renner

    At the beginning of the 1990s, Communism fell and signaled the end of the Cold War. The world rejoiced but also watched and waited to see how those countries would restructure themselves. The 1990

    Jan 1, 2007

  • SME
    The Stormwater Management and Road Tunnel (SMART), KualaLumpur, Malaysia—A Unique Use of Tunnel Space for both Traffic and Flood Water

    By Christopher J. Bambridge, Lee Seng Hoor

    The Stormwater Management and Road Tunnel (SMART) Tunnel is a world first in the use of tunnel space transmitting both road and water through the same spatial envelope. The unique aspect of the SMART

    Jan 1, 2005

  • CIM
    Discrete event control and dynamic scheduling for tele-robotic mining

    By T. Norvell, R. Gosine, S. O’Young

    "This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. This work has been carried out within ongoing research int

    Jan 1, 2003

  • CIM
    Ore Characterisation of the Aqqaluk Deposit at Red Dog

    By Steven W. Wilson, Brigitte Lacouture, Nichola A. McKay

    "The Aqqaluk deposit is a lead-zinc ore body that lies immediately north of the Main Pit at Teck Cominco’s Red Dog Mine in Alaska. It is scheduled to begin production in 2011 or 2012. A project team w

    Jan 1, 2007

  • DFI
    Combined Loading Tests On Large Diameter Piles

    By A. Lyndon

    Combined loading tests are described to three 1.2m diameter cast-in-place bored piles, 12m long, formed through cohesionless material into stiff sandy clay. The maximum loading conditions imposed at t

    Jan 1, 1989

  • AUSIMM
    Increasing Net Present Value by a Third at an Operating Sublevel Cave Mine Using Draw Strategy Optimisation

    By A D. Campbell, G R. Power

    The objective of the draw strategy in a caving mine is to maximise economic return by minimising waste dilution3 and maximising ore recovery4. The draw strategy must also include suitable controls for

    May 9, 2016

  • SME
    8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months

    By Antonio Raschillà

    On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p

  • AUSIMM
    Indicator and Quartz Reefs

    During the past Two years in reef gold mining, "indicators" have received great attention at the hands at the Victorian gold seekers. Many years ago, what was caned the" indicator lode,

  • AUSIMM
    The Improved Detection of Geochemical Soil Anomalies by Multiple Regression Analysis of Biochemical Data

    Multiple regression analysis was used to predict elemental concentrations of copper and nickel in soils from consideration of the concentration of these elements in vegetation in an ultrabasic complex

    Jan 1, 1972

  • AUSIMM
    East-Dipping Strike Faults on The Boulder Belt, Kalgoorlie

    (Published by courtesy of the Great Boulder Pty. Gold Mines, Limited)1. INTRODUCTIONThe faults described in the following paper are of a somewhat unusual character, and have presented a serious proble

    Jan 1, 1941

  • AUSIMM
    Cuprous Hydrometallurgy. Part V. Leaching of Copper-Lead Matte with Copper(II) Sulphate in Aqueous Acetonitrile

    By Parker A. J, Giles D. E

    Solutions of copper(II) sulphate in acidified aqueous acetonitrile leach copper from copper-lead matte derived from the drossing of lead with sulphur to produce solutions of copper(I) sulphate. The re

    Jan 1, 1979

  • AIME
    Part III – March 1969 - Papers- Diffusion of Impurities in Irradiated Silicon

    By W. G. Oldham

    By monitoring the capacitance of abrupt p-n junctions it is possible to follow the motion of substitu-tional impurities. A p-n junction is formed by growth of silicon from an Al-Si alloy on an n-type

    Jan 1, 1970

  • AUSIMM
    Mount Morgan Limited Gold Clean-up Practice at Oxide Mill

    At the present time this plant is treating by direct cyanidation 1,000 tons of ore from Open Cut mining and dumps, and 1,200 tons of current flotation tailing obtained from the Sulphide Mill, per day.

    Jan 1, 1939

  • SAIMM
    Electrochemical Studies Of The Interaction Of Ethyl Xanthate With Pd-Bi-Te

    By J. A. Venter, M. K. G. Vermaak

    There are practical indications that flotation recovery of palladium bismuth tellurides is poor. This work tested whether this can be caused by a lack of interaction of the collector with the tellurid

    Jan 1, 2004

  • CIM
    Modelling and Design of Undercarrage Components of Large-Scale Earthmoving equipment in Tarsand Operations Part I?Dozer Applications

    OBJECTIVES ??REDUCE OPERATING COSTS ??INCREASE LIFE COMPONENTS ??EXTEND LIFE of THE DOZER ??REDUCE MAINTENANCE COST ??REDUCE DOWNTIME ??IMPROVE DURABILITY & RELIABILITY ??IMPROVE BOLD JOINTS

    May 1, 2004

  • CIM
    Enhancing Blast Efficiency and Fragmentation Through PSD Analysis and first comminution stage Optimization

    By N. F. Faria, F. Monteiro, B. O. Taiwo, A. Palangio, D. Fonseca, J. Manuel

    This paper explores the interpretation and application of Particle Size Distribution (PSD) curves in optimizing blast design and enhancing downstream operations. The study looks at important factors l

    May 4, 2025