Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Turbo Pulp Lifter (TPL™) - An Efficient Discharger to Improve SAG Mill Performance

    By Sanjeeva Latchireddi

    "Deteriorating ore grade and high demand of metals has tremendously influenced the unit capacity of SAG mills. Pebble circuits have been added to the existing SAG circuits to increase their unit capac

    Jan 1, 2007

  • CIM
    Andritz Metals Spray-Roast Acid Regeneration Pilot Plant

    By S. K. Mitterecker, T. Hofbauer, F. Baerhold

    "Acid regeneration is a very important process step in each acid leach circuit. It is required to recover dissolved metals and HCl from spent leaching acid. Andritz Metals presents its recently commis

    Jan 1, 2016

  • CIM
    Brunswick Mine SAG Mill Liner Design and Wear

    By Chris Larsen, Ian Orford, Marilene Renaud, Mike Cooper, Lud Strah

    "An AG/SAG mill was commissioned at the Brunswick Mine concentrator in October 1998. This paper discusses the original liner design for the bi-directional AG/SAG mill, observed liner wear, subsequent

    Jan 1, 2003

  • CIM
    The geology and economic potential of the Athabasca Basin in Alberta

    By John Wilson

    "The unconformity beneath 75 per cent or over 6000 km2 of the Athabasca Basin in Alberta lies within economically exploitable depths. The basement beneath this unconformity consists of an extension of

    Jan 1, 1987

  • CIM
    Application of a kinematically admissible velocity field to the analysis of the arching phenomena in backfills

    By F. P. Hassani, H. B. Poorooshasb

    "A kinematically admissible velocity field is applied to study the arching phenomenon in a cohesionless granular backfill placed between two rough vertical inflexible walls. The study is different fro

    Jan 1, 1989

  • CIM
    Engineers Canada Partnerships

    By Stephanie Price

    Engineering Associations ?Regulatory authority ?License individuals and firms ?Discipline licensed members ?Enforce against improper acts ?Programs for EIT?s, competence, etc

    Oct 1, 2010

  • CIM
    The Use of Computational Fluid Dynamics and Discrete Element Modeling to Understand the Effect of Cell Size and Inflow Rate on Flotation Bank Retention Time Distribution and Mechanism Performance

    By Richard Peaker, Jens Lichter, Alexander V. Potapov

    "The recent combination of Computational Fluid Dynamics (CFD) and Discrete Element Modeling (DEM) can provide considerable insight into the performance of flotation cells. One area of interest from a

    Jan 1, 2007

  • CIM
    Sill pillar recovery at the Louvicourt mine

    By D. Fleury

    "This paper describes the challenges of mining a sill pillar under various types of paste backfill quality. From 1994 to 2002, Louvicourt mine produced approximately 12,600,000 t grading 3.5% Cu, 1.5%

    Jan 1, 2005

  • CIM
    Hydrogen Cracking and Fracture of Galvanized Transmission Tower Bolts

    By J. C. Thornley

    Service failures of seemingly conventional galvanized bolts, in normal operation, on transmission towers in New Brunswick have been found to be the result of hydrogen cracking. In both these cases, si

    Jan 1, 1979

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • CIM
    Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine

    By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby

    "Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe

    Jan 1, 2017

  • CIM
    Construction of prime coking coal washeries in India

    By Bali. D. D., S. Chattopadhyay

    "The planning and construction of prime coking coal beneficiation plants in the nationalized mines in India are reviewed. Flow schemes, construction practice, materials consumption, and costs are deta

    Jan 1, 1986

  • CIM
    Milling Circuit Control and Optimisation: The Millstar with IES

    By J. R. Hart, V. C. Smith, V. P. Babarovich-Hansen, J. H. Schubert

    "An introduction and case study of Mintek's latest generation of Milling Circuit controller, the MillStarTM with IES (Interpreting Expert System) is presented. This paper also describes as a case stud

    Jan 1, 2000

  • CIM
    CMIC-NSERC Footprints Project: A Roadmap for Large Project Development and Implementation

    By Alan Galley

    CMIC Mandate CIM Annual Meeting, Toronto, May 6, 2013 To increase mining research, innovation and commercialization efforts in order to strengthen Canada?s pre-eminent role as a global leader in min

    May 1, 2013

  • CIM
    Z1600 Jameson Cell Test Rig – From Rental to Revenue

    By A. Taylor, M. Blanchette, J. Doucet

    "A Z1600 Jameson Cell Test Rig was rented for test work at Vale’s Clarabelle Mill operation. This paper discusses the evolution of renting the unit for test purposes to owning the unit and operating i

    Jan 1, 2012

  • CIM
    The Evolution of Falcon Continuous Concentrators at Tantalum Mining Corporation of Canada

    By Claude Deveau

    "With ever decreasing feed grades, finer mineralogy and increased demand for product, it became obvious that a major step in equipment performance was required to reduce operating costs and increase p

    Jan 1, 2000

  • CIM
    Application of On-Line Visualization To Flotation Systems

    By Jacob Masliyah, Zhiang Zhou, Dharamdat Christendat, Tshitende Kasongo, Kevin Hyland, Zhenghe Xu, Ted Kizior, Douglas Cox

    "A novel on-line visualization system, previously developed at Syncrude Canada Ltd., has been modified to characterize rising bubbles, particles and particle-bubble aggregates in a flotation process.

    Jan 1, 2000

  • CIM
    Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, Zimbabwe

    By Peter Makuvise, Alain M. Bantshi

    "The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w

    Jan 1, 2017

  • CIM
    NYE Concentrator Expansion

    By D. Turk, P. Lefebvre, J. Sargent, K. Major

    "Stillwater Mining Company recovers platinum and palladium from their Nye Montana operations. Mining first commenced at Nye in 1987 at a milling rate of 455 t/d (500 stpd). The plant was expanded in 1

    Jan 1, 2000

  • CIM
    The Performance of Mesh, Shotcrete and Membranes for Surface Ground Support

    By E. C. Morton

    The Western Australian School of Mines (WASM) has developed a facility for the static testing of large scale ground support elements. The samples are loaded using a mechanical screw feed jack. Instrum

    May 1, 2009