Optimization Of A Grinding And Classification Circuit Of A Magnetite Ore Processing Plant Through Computer Simulation
By J. A. Delgadillo
Computer simulation and mineral modeling was applied to the optimization of a grinding circuit in a plant processing 256 t/h magnetite. These tools were used to develop a grinding and classification c
Jan 1, 2008
-
The Life Cycle of Water Used in Flotation: a Review Mining, Metallurgy and Exploration
By Shaoxian Song, Ling Xia, Hongqiang Li, Yubiao Li, Yunliang Zhao, Shaobing Xie
Since human daily demands for fresh water have been increased significantly, the supply of fresh water for the mining industry, especially froth flotation, should be considerably reduced. In addition,
-
Are Long TBM Tunnels Faster by TBM?
By Nick Barton
A recent analysis of 145 TBM tunnels of more than 1000km total length has helped to quantify the time dependence of utilization (U). In fact U = Tm, where T is time in hours and m is a negative gradie
Jan 1, 2001
-
Design And Construction Of Norad Expansion Project "Excavation Phase"
By Gerald G. Griswold, Allan G. Provost
INTRODUCTION The Norad Expansion Project was located 10 miles southwest of Colorado Springs, Colorado, within Cheyenne Mountain. The expansion areas to be excavated would be adjacent to the existin
Jan 1, 1979
-
Drive Options For Belt and Apron Feeders
By Laszlo Toth
A feeder is used to control the gravity flow of bulk solids from storage areas, like a bin or a stockpile. For this type of application, it is important to select a proper drive that can fulfill all
Jan 1, 2003
-
Looking for Mr. Good Contract
By Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb
Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac
Jan 1, 2005
-
Exploratory Fea & Conceptual Design Findings Of Large Diameter Segmentally Lined Shaft
By D. Kruse
Top down constructed large diameter (up to 90 m [300 ft]) shaft design and constructability issues present an interesting suite of challenges and opportunities highlighted in this paper. The study cov
Jan 1, 2011
-
Residence Time Distribution In Single Big Industrial Flotation Cells
By J. Yianatos
The collection zone residence time distribution (RTD) of mechanical self-aerated flotation cells was characterized for liquid and solid per size class (-45 mm, +45-150 mm and +150 mm). It was found th
Jan 1, 2008
-
Ice-Cemented Backfill For Underground Support In Arctic Mines
By V. Izaxon
Current practice in mining frozen, underground placers is to support the mine openings by leaving remnant pillars, which are kept frozen to maintain their stability. These pillars may be partially ext
Jan 1, 2004
-
South Interceptor Tunnel Construction Using a Lovat EPBM
By Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales
This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja
Jan 1, 2003
-
Pit Slope Design Challenges In Residual Soils And Weathered Rock: Background And A Case Study
By J. Geyer, B. T. Burton, H. W. Newcomen
For open pits developed in tropical climates the upper portions of the pit walls are often located in residual soils and weathered rock. Due to the presence of relict structures, and the relatively l
Jan 1, 2000
-
Longwall-Induced Ground Movement at a Shale Gas Well Site Located in a District Barrier Pillar—FLAC3D Modeling Results and Interpretation
This paper evaluates the effect of longwall mining on a cluster of unconventional shale gas wells located in a district barrier pillar between a current longwall panel and the future panel north of th
Jan 7, 2020
-
Modern Caverns In Gotham?Geotechnical And Design Challenges For Large Rock Caverns In Manhattan
By Timothy P. Smirnoff
Sustaining the region?s mobility needs, achieving projected economic growth, and maintain Midtown Manhattan as a center of regional, national and global importance has led to continued investment in c
-
Fine Coal Cleaning Using A Centrifugal Fluidized Bed Separator
By Mutombo Nombe, Avimanyu Das, Rick Honaker
Enhanced gravity separators (EGS) provide a more efficient separation than froth flotation when cleaning coal in the 150 x 25 µm particle size range. To improve the performance of an EGS unit, air bub
Jan 1, 2005
-
Niagara Tunnel Project
By Doug Harding
The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.
Jan 1, 2007
-
The Status Of Gold And Silver Leaching Operations In The United States
By Michael G. Pojar, Peter G. Chamberlain
Solution mining, primarily by heap leaching, has emerged as an important method for mining gold and silver in the United States. Heap leaching offers many economic and environmental advantages over co
Jan 1, 1981
-
Recovery Of Expanded Polystyrene From Coated Patterns Rejected From Lost Foam Casting (7e824799-4a95-4f4f-bb75-096af0709dc7)
By J. Drelich, J. Pletka
Lost foam casting patterns are foamed polystyrene shapes glued together into the shape of the part to be cast and are coated with a refractory material consisting of a mineral mixture and binders. Pr
Jan 1, 2001
-
Planning for the Drumanard Highway Tunnels, Kentucky
By Lawrence Williamson, Randall J. Essex, David P. Field
As part of a $2.2 Billion bridge project that will link Indiana and Kentucky, an interchange project northeast of Louisville will require the mining of a 6-lane tunnel system about 2,000 ft long in or
Jan 1, 2005
-
Large Diameter Tunnel Boring Machine Development
By Martin Herrenknecht
The world?s growing population and rapidly proceeding urbanization are boosting an enormous demand for new and high-capacity infrastructures to secure the mobility of goods and people. Densely popula
Jan 1, 2010
-
Enhancement of a Process Flowsheet for Recovering and Concentrating Critical Materials from Bituminous Coal Sources Mining, Metallurgy and Exploration
By A. Noble, R. Q. Honaker, J. Werner
Recovery of rare earth elements (REE) from coal-related resources has recently received significant interest due to supply concerns and their key roles in critical industries and defense-related techn