Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Preliminary Geotechnical Assessment for Re-Opening the Blackwater Mine
By J Taylor, L Richards, M McKenzie
When a collapse in its services shaft caused rapid gas build up and its premature closure in. 1951, the Blackwater Mine at Wiauta was in full production with significant ore reserves yet to be mined.
Jan 1, 1996
-
Magnesia from Magnesite by Calcination/Carbon Dioxide Leaching
By Everson P. T, Moyle F. J
Magnesite-rich and dolomite-rich ores from the Savage River region of Tasmania are being considered as potential feed material for a commercial process for production of magnesia.Two selected samples
Jan 1, 1981
-
Trommel panel development for iron ore applications
By R Wilson, R Williams, B Freeburn
McLanahan RSS14x50 scrubber screens have individually processed over 50 Mt of Pilbara iron ore. The first stage of separation in these plants with abrasive, high specific gravity, large lumps is an ex
Jul 24, 2017
-
The Washing of Calcine to Remove Soluble Salts at Great Boulder Gold Mines Limited (add9b255-f732-4157-b8bc-50ff50a1fd29)
At Great Boulder Gold Mines Ltd. a number of attempts were made to remove water soluble copper and iron salts from calcined pyritic concentrates but variou~ problems arose and the methods were abandon
Jan 1, 1964
-
Australian Earth Sciences Information System
By Tellis D. A
An outline is given of the general position of earthsciences information in Australia, the background to development of the Australian Earth Sciences Information System (AESIS) and the role of the Aus
Jan 1, 1977
-
Research of 200 m3 Self-Suction Flotation Machine
Research of 200 m3 Self-Suction Flotation Machine
Sep 13, 2010
-
Undercutting to Surface Breakthrough – Cadia East Panel Cave (Stage 1)
By B Mobilio, M Secheny, J Rachocki, G B. Sharrock, A Jäger, J L. Lett, I Brunton, G W. Capes
Establishment of the Cadia East Panel Cave Stage One (PC1S1) commenced with the firing of the first bell in early 2011. Production began with the completion of the undercut in May 2014. PC1S1 used a p
May 9, 2016
-
Preliminary Study on the Improvement of Afforestation Techniques Applied to Aggregate Mines in Japan
Development of aggregate resources for use in structural concrete has been encouraged in Japan to support infrastructure improvement and national land conservation. Natural aggregate is a valuable res
Dec 6, 2010
-
The North Strathfield Rail Underpass – Driven Tunnel Design and Construction
By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares
The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,
Sep 17, 2014
-
A Geological Model for Gold Mineralisation at Reefton, New Zealand
By G J. Corbett, P Magner, M McKenzie
Structures formed during ductile deformation have been reactivated during the later brittle mineralisation process. Two generations of folding are classified as: early recumbent megascopic FI folds an
Jan 1, 1997
-
The Use of Novel Approaches to Separate Heavy Minerals from AlbertaÆs Oil Sands
By J Coward, S Bulatovic
There are currently two operators producing oil from the surface-mineable portions of AlbertaÆs oil sands (Syncrude Canada Ltd and Suncor Inc) and two other companies are proposing to enter the indust
Jan 1, 2001
-
Increased Rolling Mill Capacity at Kwinana and Newcastle
The large increase in secondary industries in this country, during the war and post war periods, has caused a shortage of capacity for the production of merchant bar.To overcome this shortage, an expa
Jan 1, 1957
-
Geology of the Eastern Creek Volcanics in the Mount Isa District
The Precambrian Eastern Creek Volcanics comprises spilitic basalts with interbedded sediments and tuffs which were extruded and deposited during Middle Proterozoic time. The rocks have undergone low-g
Jan 1, 1968
-
Procuring Control and Intelligent Traffic Systems for Major New Build Projects – Avoiding Pitfalls and Maximising Value
By G M. Taylor
The application of high technology to monitor and control fire life safety, critical functionality in tunnels and underground spaces generally has progressed at an ever accelerating rate over the past
Sep 17, 2014
-
Beyond Rock Mass Characterisation – the Impact of Geology on Block Cave Mining
By A Webster, T Murphy
Block cave mining, in its broadest sense, has transitioned from an orebody/rock mass determined method of extraction, to a low-cost and high production mining method that may be applied to any large o
May 9, 2016
-
Mineral Sands in Australia - An Update
Australia is the world's leading producer and exporter of mineral sands. Despite increased production from some other countries in recent years, Australia maintained its No.1 position in 1988
Jan 1, 1989
-
The Dwight-Lloyd Blast Roasting Section for Sintering Lead Ores at The Broken Hill Associated Smelters Proprietary Limited, Port Pirie, South Australia
This Department handles all ores prior to blast-furnacing, the object of the operations being to mix the lead-bearing material with fiuxes, eliminate sulphur from the mixture, and produce a homogeneou
Jan 1, 1937
-
Coalmine ventilation – examining the past, looking to the future
By J M. Galvin
History attests to the catastrophic consequences that fire, explosion and contaminated, noxious andirrespirable atmospheres can have for workplace health and safety in underground coal mining. It also
Oct 12, 2022
-
Optimal goaf hole spacing in high production gassy Australian longwall mines – operational experiences
By B Belle
In a predrained gassy coalmine, ventilation control plays a secondary role to the longwall (LW) goaf drainage systems to safely manage panel return gas levels. Typically, the LW specific gas emission
Aug 28, 2017
-
Biosorption of Cr(VI), Pb(II) and Zn(II) from Aqueous Solutions by Immobilised Phanerochaete chrysosporium Biomass in a Fixed-Bed Column
Biosorption of Cr(VI), Pb(II) and Zn(II) from Aqueous Solutions by Immobilised Phanerochaete chrysosporium Biomass in a Fixed-Bed Column The continuous-flow adsorption of Cr(VI), Pb(II) and Zn(II) fr
Sep 13, 2010