Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of the Use of Roaster (SO2) Gas in the Treatment Plant at Gold Mines of Kalgoorlie Limited

    By Penrose E. K

    With the exception of occasional periods, when up to 80% of oxidized ore was treated, the G.M.K. plant treated all sulphide ore until October, 1939. The treatment was, briefly, as follows:The ore was

    Jan 1, 1942

  • AUSIMM
    Synergistic Collaboration of Humans and Automated Systems – Innovative Steps Towards Fully Autonomous and Continuous Mining Systems

    By E Widzyk-Capehart, P Vallejos, R Asenjo, J Ruiz-del-Solar

    Throughout the minerals industry, it is evident that a new wave of technological innovation is needed as the mining sector looks for ways to achieve higher security and safety as well as higher produc

    Nov 4, 2015

  • AUSIMM
    The Use of Geotechnical Instrumentation to Optimise an Engineered Mine Design at Beaconsfield Gold Mine, Tasmania

    By P B. Hills, R J. Walton

    Geotechnical instrumentation has been implemented as a key step for monitoring and optimising an engineered mine design for managing seismicity at the Beaconsfield Gold Mine. Measurements of displacem

    Jan 1, 2008

  • AUSIMM
    Reducing Social Risk and Impact by Engaging Local Communities

    In todayÆs evolving and globalised world, mining companies are being pressured to move beyond compliance towards long-term sustainability and sustainable development. Companies are expected to æengage

    Jan 1, 2007

  • AUSIMM
    Road Haulage of Ore by Peko Mines N.L.

    With the proving of a mineable orebody at Orlando in May 1961, Peko Mines N.L. was faced with the decision of whether to mill the ore on site or to haul it 25 miles to central facilities at Peko. Orla

    Jan 1, 1966

  • AUSIMM
    Dynamic Pit and Waste Dump Schedule Optimisation at Tropicana Gold Mine

    By S Graskoski, S Craig, C Myburgh

    Too often in mine planning, maximising revenue-generating material takes precedence over minimising costs. The ability to target both revenue and cost optimisation enables mine plans to fulfil corpora

    Sep 26, 2013

  • AUSIMM
    Dynamic drop testing of Sandvik’s D47 and D39 MDX bolts at the Swerim’s testing facility

    By B Darlington, L Sandberg, O Vallati

    The D47 and D39 Mechanical Dynamic Extra bolts (D47 MDX and D39 MDX) have been developed in response to the ever-increasing demand from the mining industry for rock bolts with high dynamic capacity. T

    Nov 29, 2022

  • AUSIMM
    Metallurgical Progress in the Australian Commonwealth

    By Met M. E

    In choosing the subject for my address to you this evening I was actuated by the knowledge that in the past Australian metallurgical problems have been solved by the introduction of extremely interest

    Jan 1, 1936

  • AUSIMM
    New Mining Technologies

    The GPS and information technology industries are now applying considerable development effort to what is being termed machine control and machine information systems, in particular focusing on the in

    Jan 1, 1999

  • AUSIMM
    Consolidation of Some Victorian Brown Coals

    An experimental study of the soil mechanics of brown coal showed that brown coal consolidates in the same manner as does a clay and that the theory of consolidation for soils may be applied to brown c

    Jan 1, 1963

  • AUSIMM
    Needed New Technologies for the Development of Earth Resources: Energy, Water, Wastes, Mining

    Our ultimate resources come from the Sun and the Earth System. At this time we face a world crisis in energy, water and soil resources. Global pollution problems are increasing in almost all nations.

    Jan 1, 1995

  • AUSIMM
    Settling Pond Design and Performance - The Malvern Hills Coal Mine Experience

    By J F. Seale

    The design of the settling pond for the Malvern Hills opencast coal project was based on a primary requirement to control runoff and sediment generated from the immediate 6 ha mine catchment, which in

    Jan 1, 2004

  • AUSIMM
    Laboratory Electrical Resistivity Measurements of Rocks

    Laboratory electrical resistivity measurements of rocks are reviewed. Inductive and galvanic methods are discussed together with the ten important experimental factors which should be considered in an

    Jan 1, 1969

  • AUSIMM
    Application of Mine Records to Reduce Project Risk During the Evaluation of Historical Goldfields

    By W B. Edgar, I M. Platten, C A. J Towsey, B W. Cuffley

    The evaluation of historical goldfields has been common over the past 15 years, reflecting changing economic conditions, improvements in knowledge and technology and lack of greenfield sites. Many gol

    Jan 1, 2009

  • AUSIMM
    Discovery, Geology and Structural Setting of the Nyidinghu Iron Ore Deposit, Hamersley Province, Western Australia

    By D Kepert, M Absalom, N Nitschke, C Fowers

    The discovery of the Nyidinghu Iron Ore Deposit totalling 2.46 Bt of resource continues FortescueÆs highly successful exploration record of discovering multi-billion tonne deposits under cover with li

    Aug 12, 2013

  • AUSIMM
    Hypersaline-Induced Reduction in Cyanide Ecotoxicity at Gold Operations, thereby Obviating Detoxification Plants

    By G B. Smith, D Hillier, T Gibbons, D B. Donato, M D. Adams, S Davies, R S. Schulz

    Responsible management of cyanide solutions and tailings on gold processing plants worldwide is an important aspect to these operations and is regulated via guidelines provided by the International Cy

    Sep 26, 2013

  • AUSIMM
    Leaching of a Refractory Gold Ore Sample from the Central Zone, Clarence Stream Property, New Brunswick, Canada

    By J Pric, M Fulton, C Xia

    A cyanidation study was conducted on a mild refractory gold ore sample from the Central zone of Clarence Stream Property, owned by Freewest Resources Canada, to develop a leaching strategy to extract

    Jan 1, 2007

  • AUSIMM
    Oxygen Isotope Zonation at the Golden Cross Low-Sulfidation Epithermal Gold Deposit, New Zealand

    By M P. Simpson

    Forty one whole rock samples from the Gold Cross low-sulfidation epithermal Au-Ag deposit have d18O values that range from 4.4 to 9.3 per mil, with an average value of 7.0 per mil. Unaltered and weakl

    Jan 1, 2001

  • AUSIMM
    Opening the Doorway to Self Management in the Mining Industry - The Reduced Site Surveillance Programme

    When the HSE Act was introduced in New Zealand in April 1993, one of the prime aims of the Government was to signal to the industry. The Government's recognition of the employer as the key person

    Jan 1, 1997

  • AUSIMM
    The New Updraught Sinter Plant at Mount Isa Mines Limited

    As part or a programme to raise lead smelter capacity from 65.000 to 140.000 tons bullion per annum. one new 1000 sq. ft. updraught area sintering machine replaced eight small downdraught machines.The

    Jan 1, 1968