Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Tracer Study of Discharge Segregation from a Paul Wurth Hopper

    By Jones JJ

    A laboratory study of size segregation is described using a model of a Paul Wurth hopper industrailly employed for blast furnace charg- ing purposes. Experimental charge materials used in the study

    Jan 1, 1984

  • AUSIMM
    Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based Simulators

    By P Wood, S Leveritt

    This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy

    Sep 18, 2012

  • AUSIMM
    The Potential for Automation and Process Control in Coal Preparation

    Several coal preparation plants are presently "automated" to the extent of automatic sequencing and interlocking via digital means, together with closed loop control on various level and density circu

    Jan 1, 1985

  • AUSIMM
    Contaminated Water Management for the Golden Cross Mine

    By M J. Kindley

    The Golden Cross Gold Mine Project is now fully operational and into its second year of operation. Because of its location in the sensitive Coromandel Peninsula

    Jan 1, 1993

  • AUSIMM
    Geotechnical Management at the AGL Loy Yang Mine

    By S Cyphers, J Missen, B Jansen

    The AGL Loy Yang Mine is one of the largest and most significant coalmines in Australia. Commencing in 1982, this mine produces 30–35 Mt/a to supply more than 50 per cent of Victoria’s electrical powe

    Nov 5, 2014

  • AUSIMM
    The Bottle Creek Au/Ag Deposit Ore Resource Calculation Procedures

    By Moeller T

    The Bottle Creek mine, when opened next month, will consist of three open cuts, Emu, VB and Boags, feeding ore to a central mill. The open cuts cover a strike length of 4.5 kilometres which forms pa

    Jan 1, 1987

  • AUSIMM
    The use of the Main Ramp as a Mine Exhaust at the Kencana Mine, Indonesia

    By D J. Brake

    Faced with the need to improve workplace conditions in both its development and production headings in its existing K1 orebody, as well as its new K Link and K2 orebodies, the Kencana mine in Indonesi

    Mar 21, 2011

  • AUSIMM
    Recent Technology in the Tank House at Tamano Smelter

    By Oda Y, Hashiuchi M

    In the smelting section, flexible fuels such as coal or coke are used in place of heavy fuel oil in order to utilize energy sources more efficiently. Heat recovered from the off gas of the furnace

    Jan 1, 1987

  • AUSIMM
    Non Statute Mineral Ownership Determination in New Zealand

    Mineral ownership determination is not always straight forward as in many cases the relevant details are not recorded on the latest Land Transfer title held in the local Land Registry Office. To deter

    Jan 1, 1998

  • AUSIMM
    Blast Design Using Measurement While Drilling Parameters

    By M Higgins

    Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio

    Jan 1, 2001

  • AUSIMM
    Outlook for Oil Demand in the Pacific Basin Region (9b865cd3-308f-4c90-b186-680dbd93823b)

    Large GDP increases in the Pacific Rim countries have been accompanied by similarly large increases in demand for oil products. In the case of residual fuels, this demand has been tempered by the subs

    Jan 1, 1990

  • AUSIMM
    Applicability of Categorical Simulation Methods for Assessment of Mine Plan Risk

    By A Jewbali, R Perry, R Inglis, L Allen

    "The use of conditional simulation to characterise mine plan uncertainty is increasing for the assessment of risk in mining projects. While the development of grade uncertainty profiles is relatively

    Nov 24, 2014

  • AUSIMM
    Maori Expectations for Consultation

    James Barnes is Managing Director of James Barnes & Associated Ltd which is a company that has invested ten years of development to provide developers with a transparent, user friendly consultatio

    Jan 1, 2000

  • AUSIMM
    The Effect of Process Variables on Electrowinningt Cadmium and Silver

    By Watson K, Pollard D. M

    The electrolytic recovery of metals from solution requires an understanding of the characteristics of the particular system employed, and the current efficiency and morphology of the deposit are in

    Jan 1, 1989

  • AUSIMM
    The Mineral Potential of Northland

    The Northland region of New Zealand has a complex geological history which has long been the subject of considerable controversy. Small mineral deposits have been discovered in the past, and some have

    Jan 1, 1987

  • AUSIMM
    Characterising the Blasting Properties of Iron Ore

    By A Scott, I Onederra

    Most iron ores occur in mine benches as complex mixtures of lithologies and ore types. This significantly complicates their characterisation for both blast design and fragmentation modelling. A great

    Jul 13, 2015

  • AUSIMM
    The Argentine Pyroclastic Loes

    By Pati±o A

    The Argentine pyroclastic loess arevulcanogenic deposits, which have their sources in the circumnpacific rim. The object of this work is to realize a de-tailed mineralogical characterization of this s

    Jan 1, 1990

  • AUSIMM
    Developing technologies for a complex orebody

    By G Anderson, V Lawson, P Voigt

    Glencore operates zinc concentrators at both Mount Isa and McArthur River. Both orebodies have a history of complexity and required the development of new technologies to maximise the value from thes

    Nov 21, 2018

  • AUSIMM
    The Tectonics, Geology and Gold-copper Metallogeny of New Guinea

    By S L. Garwin

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Since the Eocene, New Guinea tectonics have been driven largely by the south-westerly-direc

    Mar 18, 2015

  • AUSIMM
    New risk assessment method for coal mine excavated slopes

    By I Canbulat, J Oh, A Mcquillan, D Payne

    This paper presents a new risk assessment tool for coal mine excavated slopes. This new empirical-statistical Slope Stability Assessment Methodology (SSAM) is intended for use by geotechnical engineer

    Nov 30, 2018