Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record

    By A Reschke

    The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin

    Mar 8, 2011

  • AUSIMM
    The Benefits of using Photogrammetry in the Geological Interpretation of the Cosmos Nickel Mine

    By K Rees

    In the ideal world of an underground mining engineer, all narrow vein orebodies would be perfectly straight and continuous, thus would be a dream to mine. However, this is usually not the case. Narrow

    Mar 26, 2012

  • AUSIMM
    System Optimisation of Design and Scheduling of Open Mining Operations

    The paper presents the development of an integrated computer aided design and planning of open cast mining, with the use of object-oriented modelling and geoinformation technologies, on the example of

    Dec 6, 2010

  • AUSIMM
    Mining Legislation and Policies in Victoria with Special Reference to Exploration Licences

    The mining industry views with the utmost concern, legislative or administrative action that inherently reduces the scope for exploration activity. Is there any basis for this concern in relation t

    Jan 1, 1982

  • AUSIMM
    Land Reclamation at Waihi

    One of the most significant problems experienced in land reclamation work has been the tendency of earthmovers to over-compact the subsoils and topsoils. The need for extensive subsoil drainage, becau

    Jan 1, 1991

  • AUSIMM
    Ensuring Professional Engineering Capability - Queensland Professional Engineers Act 2002

    The provision of professional engineering services in Queensland is regulated through the Professional Engineers Act 2002. The Act requires that anyone providing professional engineering services must

    May 1, 2010

  • AUSIMM
    Challenges and limitations in development of large thermodynamic databases for multiple molten phases using the Modified Quasichemical Formalism

    By E Jak, M Shevchenko, E Nekhoroshev, D Shishin

    In the field of pyrometallurgy, the presence of multiple molten phases with distinct chemical compositions, such as slags, mattes, speiss liquids, metals and molten salts, is a well-known phenomenon.

    Aug 21, 2024

  • AUSIMM
    Arsenic pathways in copper mining – sustainability issues and potential solutions

    By D Bradshaw, E Forbes, M Edraki, M Tayebi-Khorami, E Manlapig

    There is an increasing trend in the extraction and development of copper resources from complex deposits. These deposits pose mineral processing challenges, as they often contain low grade disseminate

    Jul 25, 2018

  • AUSIMM
    Corrosion behaviour of ferrite and aluminate refractories in cryolitealuminium melts

    By M A. Rhamdhani, R Z. Mukhlis

    Removing the ledge formation in the Hall-Heroult cell during the electrolysis process may significantly reduce the energy requirement of the aluminium production process. In the absence of the ledge,

    Aug 21, 2024

  • AUSIMM
    Presentation of Certificate of Honorary Membership to Sir Ian McLennan, K.C.M.G., K.B.E.

    By W. M. LONIE

    Address by the President of the Institute (Mr W M Lonie) in making the presentation of the Certificate of Honorary Membership to Sir Ian McLellan, K.C.G.M, K.B.E. Address by Sir Ian McLellan after acc

    Jan 1, 1979

  • AUSIMM
    "Predicting Cu Species Classification Using Geochemistry at the Productora Cu-Au-Mo Deposit, Chile"

    By R Berry, A Escolme

    "Predictive geometallurgical models are being developed for the Productora Cu-Au-Mo deposit based on geochemistry to reflect variability in Cu species based on Cu sequential leach data (ie oxide, tran

    Jun 15, 2016

  • AUSIMM
    New Bio-Adsorber with Activated Carbon and Nano Tube Carbon for Separation of Nickel and Cadmium

    New Bio-Adsorber with Activated Carbon and Nano Tube Carbon for Separation of Nickel and Cadmium

    Sep 13, 2010

  • AUSIMM
    Vivien Mine modelling back analysis to forecast ground conditions and ground support

    By J Player, P Mikula, G Sweby

    A numerical modelling back-analysis exercise was carried out at a WA gold mine at which early signs of seismicity (rock noise, scatts from active faces) were becoming apparent as depth of mining incre

    Nov 29, 2022

  • AUSIMM
    Magnetic Conditioning at the Hellyer Tailings Retreatment Plant

    By B Lumsden

    During periods of high metal prices and strong metal demand tailings retreatment can be economic. Most tailings retreatment operations are technically challenging, low margin operations, because the e

    Jan 1, 2009

  • AUSIMM
    Contract Versus Owner Mining ù An Update on Australasian Open Pit Mining Practice

    With the advent of the resources boom in the late 1960s most of the larger scale resources projects in Australasia were commissioned on an æowner miningÆ basis, where the mine owners owned and operate

    Jan 1, 2002

  • AUSIMM
    Latest Technologies in Optical Measurements for Geotechnical Instrumentation

    Optical sensors have emerged during the telecom boom in the late 1900s, due to the availability to low-cost telecom-grade optical components. It's only after the telecom industry's fall in 2

    Nov 25, 2010

  • AUSIMM
    Predicting Lump and Fines Finished Product Grades and Lump Percentage from Head Grade

    By K Jupp, T J. Howard

    Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three locations, separated by many kilometres. The ore is stockpiled

    Jan 1, 2009

  • AUSIMM
    In situ Stress Measurement Using Acoustic Emission from Cored Rock

    By G Baird, M Seto

    Reliable evaluation of in situ stress is an important phase in the analysis and design of underground excavations, particularly for evaluating the stability of underground structures to prevent failur

    Jan 1, 2002

  • AUSIMM
    New Perspectives on the Busang Gold Fraud

    The gold salting fraud at Busang on the island of Kalimantan, Indonesia was exposed in early 1997 and resulted from the independent drilling, sampling and assaying of PT Freeport Indonesia which repor

    Jan 1, 2002

  • AUSIMM
    Strength and Stiffness Parameters for Tunnels in Weak Sedimentary Rocks – A Case Study of the East Coast Bays Formation in Auckland, New Zealand

    By W Newns

    This paper describes laboratory and in situ tests and determines a set of parameters for stiffness and strength properties for a weak sedimentary rock mass, the East Coast Bays Formation of Auckland.

    Mar 8, 2011