Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Influence of Blasthole Delay Times on Fragmentation as well as Characteristics of and Blast Damage behind a Remaining Bench Face through Model-scale Blasting

    By P Moser, P Schimek, F Ouchterlony

    This paper summarises the findings of 27 model-scale bench blasts in magnetic mortar, which were conducted from 2011 to 2014 at the blasting site of the Montanuniversitaet Leoben.The aim of the study

    Aug 24, 2015

  • AUSIMM
    Rio Tinto Floating Module

    By N Vagias, R Shaw, M Coghill, W Easman

    Rio Tinto Technology and the Rio Tinto Foundation for a Sustainable Minerals Industry have funded the development of a practical floating module that can reduce water losses through evaporation from w

    Jan 1, 2006

  • AUSIMM
    Operational Geotechnical Engineering at the Ok Tedi Mine, Papua New Guinea

    By Cortes JP

    In a dynamic environment such as the Star Mountains of Papua New Guinea Geotechnical Engineering for the Ok Tedi Project must be described as both interesting and challenging. To be effective a rea

    Jan 1, 1997

  • AUSIMM
    The Export of Australian Mining Technology

    Australian mining practice operates at the forefront of technology. In recent times Australian designers, contractors and operators have shown many examples of technical "entrepreneurship" in solvin

    Jan 1, 1988

  • AUSIMM
    The Impact of Explosive Performance on Quarry Fragmentation

    By Cox N

    Fragmentation control is perhaps the most critical aspect of quarrying operations, potentially impacting on the costs of all down stream processes, and sometimes even on the economic viability of an

    Jan 1, 1995

  • AUSIMM
    Can æNovelÆ Ecosystems Offer Suitable Rehabilitation Alternatives for Post-Mined Landscapes?

    By P Audet, D R. Mulligan, D Doley

    This analysis attempts to reconcile existing ecological theories, rehabilitation planning goals and implementation constraints in the form of a rehabilitation paradigm that considers potential and pra

    Jul 10, 2012

  • AUSIMM
    CIL Gold Leaching and Adsorption with a Deficiency in Free Cyanide

    By Derham DW, Newcombe LA

    The operations of the Mount Morgan gold tailings retreatment plant were significantly improved in 1984 by the desliming of the CIP plant feed, which reduced cyanide consumption and increased percen

    Jan 1, 1993

  • AUSIMM
    Roasting for antimony removal from Greenbushes materials-plant developments

    By Floyd JM, Richardson P

    The extension of theoretical and laboratory studies of the roasting of tantalite and cassiterite concentrates from Greenbushes Tin Limited to pilot and semi- commercial plant developments is detaile

    Jan 1, 1986

  • AUSIMM
    Leveraging Accuracy and Precision ù Multi-Phase Mass Balancing and Reconciliation as a Tool for Quality Data Management

    By M Dunglison, P M. Cameron

    Simultaneous mass-balancing of a mineral processing flow sheet results in adjustments to each data point that reflects the accuracy and precision across the full set of data. In this way, all the good

    Jan 1, 2005

  • AUSIMM
    Practical Considerations in Longwall Support Behaviour and Ground Response

    This paper examines the interplay between longwall support design/geometry features, operational controls and geological features on ground response. Experience from several investigations is used to

    Jan 1, 2005

  • AUSIMM
    Dynamic Simulators for Training Personnel in the Control of Grinding/Flotation System

    By Herbst JA

    During the last decade, it has been established that conventional mineral-processing control strategies based on classical control theory result in significant increases in plant throughput and operat

    Jan 1, 1985

  • AUSIMM
    Pillar Extraction Methods

    By Ross J. F

    A pillar 'is a block of coal left in the first working of a coal seam for the purpose of supporting the superincumbent strata in such a manner that the winning out roadways will be safe to traver

    Jan 1, 1947

  • AUSIMM
    The Contribution of Cemented Backfill to Heat Loads in Mines

    By A Hewitt

    Portland cement is the chief binding ingredient in mine backfill. In the presence of water, the chemical compounds within portland cement hydrate causing hardening and strength gain. During hydration,

    Jan 1, 2005

  • AUSIMM
    A Review of the Kapit Orebody, Lihir Island Group, Papua New Guinea

    By J R. Robinson

    Prior to mine development, exploration drilling within the Luise Caldera on Niolam Island encountered gold mineralisation to the northwest of the main Minifie and Lienetz orebodies. This mineralisatio

    Jan 1, 2004

  • AUSIMM
    The Comparable Sales (Real Estate) Method of Valuation

    The ""comparable sales"" method of valuation attributes value to an asset by reference to actual sales of comparable assets or to the market capitalisation of companies with comparable assets. This

    Jan 1, 1994

  • AUSIMM
    The Effect of Titanium on Reduction Degradation of Iron Ore Agglomerates

    By K Kinnunen

    A strong correlation between the reduction degradation index (RDI) of production sinter and the titanium content of the sinter mix was identified at the Ruukki sintering plant between 2000 and 2004. T

    Jan 1, 2007

  • AUSIMM
    Strategic Research Support for the Mining Industry - the Role of the Australian Centre for Minesite Rehabilitation Research (b450b651-6dab-452c-b859-38bc85772524)

    The Australian Centre for Minesite Rehabilitation Research (ACMRR) was established through a mining industry initiative to meet the need of industry, governments and the community for sustainable sys

    Jan 1, 1995

  • AUSIMM
    Drill Blast Versus Reverse Circulation Grade Control Sampling ù A Case Study From the Mt Muro Gold Silver Mine, Central Kalimantan, Indonesia

    Mt Muro was a gold and silver mine in Central Kalimantan on the Island of Borneo, Indonesia. Aurora Gold through its Indonesian subsidiary Indo Muro Kencana owned the project. Processing commenced in

    Jan 1, 2003

  • AUSIMM
    A Modern Approach to Methane Drainage Control and Utilisation

    By Moffatt G

    Approval to operate Longwall No. 7 at Appin Colliery in 1979 was granted pursuant not only to the usual statutory provisions, but also that an adequate means of drainage of methane gas be incorpora

    Jan 1, 1982

  • AUSIMM
    Appraisal of the Jameson Flotation Cell for Recovery of Cyanide Soluble Copper

    By Harbort G. J

    Jameson cell pilot plant trials were conducted in a number of areas in the Red Dome gold/copper flotation plant during 1991. The aim of testwork was to reduce the amount of cyanide soluble copper re

    Jan 1, 1992