Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Minimising the Total Cost of Horizontal Development with Burn Cut Blast Rounds

    The total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise

    Jan 1, 1998

  • AUSIMM
    Concentration of Gold from Carbon-contaminated Residue Dumps in the Kalgoorlie Area

    By OÆNeil G. R

    The gold adsorption capacity of ash-char and ion exchange resin Zerolit F.F. (I.P.) was evaluated by obtaining Freundlich isotherms in the presence of selected variables. It was found that the pres

    Jan 1, 1979

  • AUSIMM
    The Direct Filling of 1100 Orebody Stopes from Surface at Isa Mine

    In early-1989, subsidence due to voids at the top of previously filled stopes and stopes awaiting filling,began to threaten the 15 level fill conveyor horizon. This together with the need to maintain

    Jan 1, 1992

  • AUSIMM
    Ten conditions that will change the work of managers in Mining 4.0

    By J Johansson, J Lööw

    There are many reports about how the new technology will affect our work, sometimes they are utopian but often dystopian. Most of the visions describe the industrial work, while the work of the manage

    Sep 1, 2024

  • AUSIMM
    Thermoelectric Power Measurements of Particulate Chalcopyrite Samples from the Mt Isa Mine

    By Kobayashi M

    Particulate chalcopyrite samples (78 ~ 98 mole per cent chalcopyrite, screen size fraction from 710 to 250 µm) were prepared by crushing and sieving lump ore samples from 12 locations in the Mt I

    Jan 1, 1990

  • AUSIMM
    Microstructural Changes During the Reduction of Wustite (0fae6247-cbaa-4434-8050-a887fa11bf4e)

    By Hayes P. C, Matthew S. P

    The product morphologies formed on the reduction of dense wustite crystals are classified into three types, A) porous iron, B) porous wustite covered with dense iron, and C) dense wustite covered with

    Jan 1, 1985

  • AUSIMM
    Secondary Grinding Circuit Optimisation for the Copper Concentrator of Mount Isa Mines

    By M Magee, D Way

    The Mount Isa Copper Concentrator was commissioned in 1973. In 1991, two autogenous grinding mills were installed replacing two stages of crushing, one stage of rod milling and one stage of primary ba

    Jan 1, 2004

  • AUSIMM
    The Extraction of Nickel from Laterites by High Temperature Reactions with Glycerol

    A recently discovered high temperature (22G-2800°C) reaction between glycerol and the oxides and hydrous oxides of iron produces a green, well-crystalline complex glycerato-iron, whereas hydrous

    Jan 1, 1971

  • AUSIMM
    Improving Low-Grade Ore Recovery with the use of Efficient Blasting Techniques

    Drilling and blasting operations have historically been viewed as a necessary 'evil' part of mining, whose costs should be minimised by whatever means possible. In the past, when operation

    Jan 1, 1998

  • AUSIMM
    Computer Simulation Studies on the Mechanisms of Toxic Element Incorporation in Jarosite

    By A M. L Smith, W E. Dubbin, K A. Hudson-Edwards

    Jarosites (KFe3(SO4)2(OH)6) are examples of minerals that are highly effective scavengers of toxic elements, and are abundant in acid rock drainage systems, acid sulfate soils, metallurgical wastes an

    Jan 1, 2008

  • AUSIMM
    Use of Computerised Management Systems for the Blair Athol Coal mine Project

    As Project Managers for the Blair Athol Coal Mine Project, CMPS selected a number of computer systems to assist in project control. The areas where computers were used were: 1) Planning & Schedulin

    Jan 1, 1983

  • AUSIMM
    Collector-Extender Flotation in the Processsing of Coarse Fractions of Potash Ores

    By Dai Q

    The mechanism of flotation of potash ores with long chain primary amines has been assessed. Since at high electrolyte concentration in saturated brine the electrical double layers of the interacting

    Jan 1, 1993

  • AUSIMM
    Recent Grinding Practice in the Copper Concentrator of Mount Isa Mines Limited

    By M Gao, V Lawson, W Valery

    Changes in metal prices and mine output over recent years have required the Copper Concentrator of Mount Isa Mines to operate at annual tonnage rates varying from 4.0 million to 6.5 million tonnes. Se

    Jan 1, 2000

  • AUSIMM
    What Gives a Shoreline Heavy Mineral Potential on the Swan Coastal Plain?

    By Deverux M

    Heavy mineral deposits accumulate on shorelines with interrupted sediment input. Beach deposits, which form on shallowly dipping coastal plains, are most favourable. However, shallow shelves seawa

    Jan 1, 1986

  • AUSIMM
    Some Problems in Deep Open Cut Mining and their Solution by Goldsworthy Mining Limited

    The iron ore mining operations carried out by Goldsworthy Mining Limited at Golds- worthy, Shay Gap and Sunrise Hill, in the Pilbara region of the North-West of Western Australia, are unusual insofa

    Jan 1, 1979

  • AUSIMM
    Planning, Design and Construction of a Small Multi-use Tunnel in an Urban Environment

    The planning, design and construction of a service tunnel, under a major arterial road between two hospitals are described. The multiple uses of the tunnel combine to provide a favourable cost-benef

    Jan 1, 1981

  • AUSIMM
    Adoption of an Integrated Mine Water Management Approach Provides Environmental, Social and Economic Benefits

    By R Vleggaar

    In addressing a short-term operational need for the relocation of a tailings storage facility reclaim pond, a mine has achieved a host of water management objectives. Through effective planning and ad

    Jan 1, 2006

  • AUSIMM
    Drill Blast Optimisation

    Scientific drilling and blasting techniques are currently being presented to the mining industry as an aid in the overall optimisation process. The degree of success in the development of these techn

    Jan 1, 1990

  • AUSIMM
    Collection and Application of Geological Data for Design of Underground Openings at Mount Isa

    By Blair JR

    The tunnel alignments investigated for the Gosford Regional Sewerage Scheme are located in the Terrigal Formation and are covered for most of their length by a thick blanket of soil and weathered

    Jan 1, 1976

  • AUSIMM
    Assessment of Appicability of Strength Criteria for Rock and Rock Mass to Coal Pillars

    By Hossaini SMF

    The applicability of four empirical strength criteria for rock masses, namely, Hoek and Brown, Bieniawski - Yudhbir et al., Ramamurthy - Arora and Johnston - Sheorey et al. has been tested against th

    Jan 1, 1992