Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Predicting the Effects of Ground Movements Associated with Soft Ground Tunnel Construction in Urban Areas ù A Procedure for Engineering Evaluation

    By J P. Hsi

    Recent increase in the development of underground space in urban areas in Australia has included soft ground tunnel construction. The ground movements associated with soft ground tunnel construction m

    Jan 1, 1999

  • AUSIMM
    High-resolution Characterisation of Gold Mineralisation at Plutonic Gold Mine, Western Australia – Evidence for the Late-stage Deposition of High-grade Gold

    By R M. Hough, G Duclaux, M A. Pearce, M F. Gazley

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Microcharacterisation, such as that described in this paper, provides understanding of a mi

    Mar 18, 2015

  • AUSIMM
    Long-Term Monitoring of Water Infiltration Through Covers at White Æs Waste Rock Dump at the Rum Jungle Mine Site Using Lysimeters

    By A I. M Ritchie, G P. Timms

    Monitoring of water infiltration into WhiteÆs waste rock dump at the Rum Jungle mine site in the Northern Territory, Australia, started in 1983, and has since produced a unique and long-running data s

    Jan 1, 2003

  • AUSIMM
    PACMANUS: An Active Seafloor Hydrothermal Field on Siliceous Volcanic Rocks in the Eastern Manus Basin, Papua New Guinea (3c389328-8706-4f53-9d31-55f40fac9ab9)

    By Parr JM, Scott SD, Herzig PM, Gemmell JB

    PACMANUS is an actively-forming seafloor analogue of volcanic-hosted massive sulfide orebodies, situated on the crest of an andesite-dacite-rhyodacite ridge overlying rifted older arc crust in a back

    Jan 1, 1995

  • AUSIMM
    Acid Drainage From Derelict Coal Mines in an Urban û Rural Environment of New South Wales ù Holding a Tiger by the Tail

    The New South Wales Department of Mineral Resources has, since 1974, administered the Derelict Mines Rehabilitation Program (DMRP) to reduce the environmental impacts of abandoned and orphan mine site

    Jan 1, 2003

  • AUSIMM
    Development of an Empirical Geochemical Model (OkARD) to Predict Acid Rock Drainage Risks From Mine Derived Sediments, Ok Tedi Copper and Gold Mine, Papua New Guinea

    By K Voigt, B Bolton, C Rumble

    The Ok Tedi copper and gold mine is owned and operated by Ok Tedi Mining Limited (OTML) and is located in the Star Mountains of the Western Province of Papua New Guinea. Waste materials (both sulfidic

    Jan 1, 2003

  • AUSIMM
    The Waihi Epithermal Gold-Silver Quartz Vein System, New Zealand: a High-Throughput Geothermal System of Late Miocene Age (194719d8-ed32-49b1-a277-cf211be8fca3)

    By Blattner P

    The Late Miocene gold-silver bearing epithermal system at Waihi has some close similarities in its paleo-thermal and -geochemical structure with modern, volcanic-hosted geothermal systems such as Oha

    Jan 1, 1995

  • AUSIMM
    Using Sedimentary Pyrite Chemistry to Inform Regional Exploration for Sediment-hosted Gold Deposits – A Gold Fertility Case Study from the Selwyn Basin Area, Yukon

    By P J. Sack, L V Danyushevsky

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Regional-scale exploration for sediment-hosted gold deposits is hampered by the challenge o

    Mar 18, 2015

  • AUSIMM
    Fundamental Studies for Detecting Fire Source of Spontaneous Combustion Using the Self-Potential Method ù In Situ Measurement in a Combusting Coal Waste Pile

    By K Uchino, M Inoue

    Self-potential anomalies are generated by fluid pressure gradient, by temperature gradient or by chemical gradient. On the basis of this principle, a new technique is proposed to locate the fire sourc

    Jan 1, 2005

  • AUSIMM
    Integrated Approach to Assessing Mine-Related Impacts on the Sustainable Management of Water Resources ù Case Study: Three Mile Creek, Collinsville (Northern Bowen Basin, Queensland)

    By D L. Richardson, B Tiedt, C D. Morgan

    Following residentsÆ concerns that the ongoing operations of Collinsville Coal (CCP) mine may be resulting in the release of contaminants, including products of acid mine drainage (AMD), into downstre

    Jan 1, 2003

  • AUSIMM
    Design of Sample Plants ù Getting it Right First Time

    The basic rule for correct design of a sample plant is that all parts of the material being sampled must have an equal probability of being collected and becoming part of the final sample for analysis

    Jan 1, 2005

  • AUSIMM
    Using Value at Risk for Integrated Project Risk Evaluation

    By W Stange

    Assessing the risks in a mining project is a key aspect of project evaluation. This is an exacting and demanding task because of the complexity due to the need to deal with uncertainty over long time

    Jan 1, 2009

  • AUSIMM
    Economics of Pollution Control

    In those days no one worried - there were plenty of other things to do. But in'these days it is different. Everyone worries- and. because there is so much worry, emotion has entered the picture

    Jan 1, 1971

  • AUSIMM
    Elrington Colliery

    By Hindmarsh G

    The colliery is owned by the BHP Collieries Proprietary Ltd., the principal shareholders being the Broken Hill Pty. Company Ltd. and Hebburn Limited.It is situated due west of Newcastle and 6 south-ea

    Jan 1, 1935

  • AUSIMM
    Fragmentation Prediction in Bench Blasting

    By Wang S

    Fragmentation is the basic concern in rock blasting and serves as the main measure of blasting effectiveness. A good estimation of fragment size distribution before blasting is very useful and helpf

    Jan 1, 1990

  • AUSIMM
    Tunnel Groundwater Inflow Measurement

    By R Witt, M Lowing

    Tanking of tunnels is now often specified when inflows exceed as little as 1 L/s/km with a unit distance of 100 m. To demonstrate inflows over a 100 m segment of a tunnel are less than 0.1 L/s with a

    Jan 1, 2008

  • AUSIMM
    Prospects for Single Pass Bolting (SPB) in Underground Hardrock Mining

    By Dorricott M. G

    Rock bolt installation is generally carried out in two steps. First the hole is drilled and the drill steel is extracted, then the bolt is inserted into the hole and tightened or grouted. With single

    Jan 1, 1992

  • AUSIMM
    Reorganization of Bulli Colliery with Special Reference to Haulage Problems

    The following is a brief summary of the Bulli Colliery and its method of operation when Australian Iron and Steel Ltd. took control.Bulli Colliery is situated about a mile west of the village of Bulli

    Jan 1, 1947

  • AUSIMM
    Air Pollution - Risdon Works of Electrolytic Zinc Company of Aust. Ltd.

    The metallurgical works of the Electrolytic Zinc Company is situated on the Derwent Estuary, approximately five miles north of the city of Hobart and near a relatively dense housing area. Zinc conce

    Jan 1, 1971

  • AUSIMM
    Modelling Rock Behaviour in Rock Cutting

    By Boland J

    Prediction of rock cuttability by various excavation machines such as tunnel boring machines, road headers, rippers, picks, roller disc cutters, excavators, etc is of major concern to both civil an

    Jan 1, 1995