Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Optimization of Geochemical Exploration for Gold using Glacial Till

    By M. B. McClenaghan, O. P. Lavin, Ian Nichol

    "Abstract-Exploration in most areas of Canada has to contend with problems posed by glacial overburden. In many areas exploration for gold has been based on the sampling of tills, frequently by deep o

    Jan 1, 1992

  • CIM
    Thermal Decomposition and V a pour Pressure Measurements on Arsenopyrite and an Arsenical Ore•

    By B. A. Strathdee

    An arsenical ore containing both pyrite and arsenopyrite was heated to a temperature at which decomposition and distillation took place. The condensate consisted of metallic arsenic and arsenic disulp

    Jan 1, 1961

  • CIM
    The Canadian Precambrian Shield

    By J. E. Gill

    "The name 'Canadian Shield' is used for a vast area; largely in northeastern; Canada; underlain by Precambrian rocks. The part in Canada has an area; of about 1; 790; 000 square miles. Extensions in G

    Jan 1, 1954

  • CIM
    Acidic Effluents, Their Production and Characteristics

    By C. C. Walden, A. Bruynesteyn

    "Chemical and biological aspects of the formation of acidic effluents from sulfide waste materials are discussed. Test procedures to determine the acid producing potential of waste materials, as well

    Jan 1, 1980

  • CIM
    A Novel Model for Risk Assessment of Adjacent Buildings in Tunnelling Environments

    By Limao Zhang

    This paper presents a novel model to assess the risk of adjacent buildings in tunnelling environments based on Extended Cloud Model (ECM). ECM is an organic integration of Extension Theory (ET) and Cl

    Aug 1, 2013

  • CIM
    When Health & Security Mean Savings at the Laronde Refinery

    By J. Fournier, D. Fortin, F. Robichaud

    Since milling began in 1988, the Laronde mill has been expanded several times, the most recent, increasing the milling rate from 5 000 to 7 000 mtpd. Laronde uses SAG/ball mill grinding followed by co

    Jan 1, 2005

  • CIM
    Till Geochemistry in Areas of Thick Drift and its Application to Gold Exploration, Matheson Area, Northeastern Ontario

    By M. B. McClenaghan

    "Abstract- The Ontario Geological Survey completed a regional till sampling project between 1984 and 1988 in the Black River Matheson (BRiM) area of northeastern Ontario. The project was designed to a

    Jan 1, 1994

  • CIM
    Integrated Experimental and Thermodynamic Modelling Study of the Multicomponent “Cu2O”-FeO-Fe2O3-CaO-SiO2-PbO-ZnO-Al2O3 System

    By V. Prostakova, M. Shevchenko

    The copper smelting gas / slag / matte / metal / solids system with the Cu-Fe-Ca-Si-O-S major elements has been a long-term focus of the present overall research program using integrated experimental

    Jan 1, 2019

  • CIM
    The Sizing and Operation of Crushing and Screening Plants

    By R. E. Jones

    "Crusher sizing and application in mining operations is the selection of a crusher or a series of crushers to reduce run of mine ore to a size suitable for either autogenous or conventional grinding.

    Jan 1, 1974

  • CIM
    Properties of International Nickel Company of Canada

    By Arthur B. Yates

    "The nickel deposits of Sudbury, discovered in .1885, have probably commanded as much attention as any single group of orebodies in the world. They have been the major source of the world's nickel sup

    Jan 1, 1954

  • CIM
    And where are we going? Comminution, flotation and gravity separations

    By J. A. Finch

    In this paper, the author offers a personal view of what the next 30 years holds for mineral processing. Restating that mineral processing will remain a vibrant industry in raw material production, gr

    Jan 1, 1998

  • CIM
    Mining Community Sustainability and well-being in British Columbia, Canada

    By Janis A. Shandro

    The mining sector is a major economic driver for Canadian, and British Columbian communities. In parallel strong commitments have been made by industry to the well-being and sustainability of associat

    May 1, 2011

  • CIM
    Retrofit of Agrium’s Special Standard Surge Bin Improves Reliability, Safety, and Life Cycle Cost

    By T. Holmes, S. Davison

    "A surge bin at Agrium’s Vanscoy potash operations has been plagued with flow, wear, and corrosion issues since being built in 1967. The culprits? The bin’s carbon-steel construction, geometry, and th

    Jan 1, 2018

  • CIM
    Effects of the Type of Water on the Selective Flotation of Pyrochlore from Niobec

    By E. Esponosa-Gomez, J. A. Finch, A. R. Laplante

    "Water quality plays an important role in oxide flotation. The effects on selective flotation of fine (1-16 um) pyrochlore of two types of water used at the Niobec concentrator, potable and plant recy

    Jan 1, 1986

  • CIM
    Industrial Minerals and Rocks in British Columbia

    By J. M. Cummings

    CONSIPERABLE information on the industrial or non-metallic mineral resources of British Columbia has been published. For a general resume of the subject, reference may be made to a paper presented by

    Jan 1, 1938

  • CIM
    Recovery of thermal coal from waste dumps near Stellarton, Nova Scotia

    By L. C. Bird, N. T. L. Landgren, M. W. Mikhail

    "Through funds made available in 1972 by the Nova Scotia Department of Mines and Energy (DME) and the federal Department of Regional Economic Expansion, a program was initiated to recover saleable coa

    Jan 1, 1981

  • CIM
    Continuation Methods for the Simulation of Rock Fracture with Cohesive Elements

    By M. L. F. Paullo, S. Cristian Mejia, D. Roehl

    "Rock fracture simulation most often presents non-linear behaviour due to loss of material integrity and strain concentration in the fracture zone. These strains generate local instabilities that prop

    Jan 1, 2015

  • CIM
    Jolu Gold Mine Low Cost Gold Recovery Configuration

    By J. Kazakoff

    "The success of gold recovery at the Jolu gold mill depends on many variables. The most important ones are the people, the ore body, plant design parameters, equipment selection and cost control. This

    Jan 1, 1990

  • CIM
    Some Major Structures of the Canadian Shield

    By J. Tuzo Wilson

    Abstract A division of part of the Canadian Shield into provinces believed to represent former mountain belts is attempted, special emphasis- being laid upon radioactive age determinations, the rel

    Jan 1, 1949

  • CIM
    New Development in Liner Design for Large Autogenous Mills

    By T. Möller

    Grinding mills are the heart of the mineral processing plant, and are production-critical machines which are required to achieve high availability. Liner wear life and a liner design that promotes eas

    Jan 1, 2012