Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Use of an on-Line Analysis System in the Flin Flon Concentrator

    By H. A. Dakin

    "An introduction to the metallurgical requirements of the Flin Flon concentrator reveals the magnitude of ore blending which is required in its operation of three flotation circuits. The resulting var

    Jan 1, 1974

  • CIM
    Coarse Lead Flotation Practice at Polaris

    By R. Simkus, J. K. Gowans

    Polaris Operations, a Cominco Ltd. lead-zinc mine, is located on Little Cornwallis Island, Northwest Territories, at Latitude 75°23' N and Longitude 96°75' w. When the Polaris Mine went into operation

    Jan 1, 1984

  • CIM
    The Benefits of Collaborative, Leveraged Industry-University Research Case Study of a McGill-CAMIRO Project

    By J. E. Nesset, L. S. Urbanoski, J. R. Goode

    "The benefits and advantages of pre-competitive, collaborative industry/university research are not always well appreciated. This paper presents the case study of a current collaborative project betwe

    Jan 1, 2001

  • CIM
    Titanium Powder Production by Reducing Titanium Tetrachloride with Magnesium Metal in a Molten Salt

    By G. Minhas, M. Pule, Y. Laffitte, M. c. McGurn, T. Tzanetakis, Peacey. J., R. Susilo

    Titanium (Ti) metal production from titanium tetrachloride (TiCl4) using magnesium (Mg) as a reducing agent is the well-known Kroll process. A chloride route is used to avoid oxidation of the titanium

    Jan 1, 2015

  • CIM
    Strategies for Mining in the Vicinity of the Creighton Fault at Vale?s Copper Cliff Mine

    By Mehdi Razavi

    Scope of the Study The possibility and risk associated with mining two stopes at the same time The influence of Creighton Fault on the stability and dilution The effect of irregular shape of stope

    Oct 1, 2010

  • CIM
    Post-War Problems of the Young Engineer

    By Geo. E. Cole

    A GREAT deal of time and energy is now being devoted to the study of post-war reconstruction and rehabilitation, in spite of the fact that as yet we have not won the war in which we are presently enga

    Jan 1, 1943

  • CIM
    Water Utilization by Oil Sands Mines in Alberta

    By Leslie F. Sawatsky

    Raw water import requirements for oils sands mines depends mainly on factors such as ore processing rate, ore material characteristics, tailings processing technology, tailings storage systems, proces

    May 1, 2004

  • CIM
    Hope Bay Project: Canada?s Premier Undeveloped Greenstone Gold Belt Nunavut Territory, Canada

    By Stephen P. Quin

    One of the most prospective undeveloped greenstone belts in Canada, the Hope Bay greenstone belt extends over 80km in a north-south direction and is between 7 and 20km wide. The belt lies on the arcti

    May 1, 2003

  • CIM
    The Ecstall Story: The Railroad and Traffic Department

    By David G. Baskin

    "THIS DEPARTMENT is unique in that it operates in the production stream and also provides an essential service. Its operating function consists of scheduling an ore train to haul 10,000 tons per day o

    Jan 1, 1974

  • CIM
    Operation of the Creighton Mill

    By The Mill Staff

    "IntroductionCOMMENCEMENT of operations at the new No. 7 shaft and 10,000-ton mill at Creighton mine was a major step in the programme of conversion to all-underground mining by the International Nick

    Jan 1, 1952

  • CIM
    The Respirable Dust Concentration Information Transmission Method Based on Led Light Equipment

    By C. R. Tang

    The respirable dust real-time monitoring equipment export information is complex, and electromagnetic wave wireless transmission is affected largely under mine conditions. The respirable dust concentr

    Aug 1, 2013

  • CIM
    Factors Affecting Overall Effectiveness of Teleoperated Loading and Haulage Equipment in Underground Metal Mines (2f68619f-48ff-478c-8ed0-965317a4b56f)

    By Jacek Paraszczak

    Application of teleoperated and automated mobile equipment in underground metal mines represents a promising avenue to overcome some of the challenges facing the industry. This paper addresses the iss

    Oct 1, 2009

  • CIM
    Conga: The World?s First 42 Foot Diameter 28 Mw Gearless SAG Mill

    By T. Orser

    In 2010 Newmont made the decision to purchase a 42 foot (ft) Semi-Autogenous Grinding (SAG) mill from Metso and a 28 Mega-Watt (MW) Gearless Mill Drive (GMD) from ABB for the Conga Project in Peru. Th

    Jan 1, 2012

  • CIM
    The Griffith Mine Energy Reduction Program

    By J. Frostiak

    "This paper describes some energy reduction measures Implemented at the Griffith Mine. Before proceeding, I will give you a brief overview of the operation.The Griffith Mine is an iron ore mining, con

    Jan 1, 1983

  • CIM
    The Behaviour of Gold in Hemlo Mines Ltd. Grinding Circuit (aa6f7398-0561-40ff-b0b4-243c3a8474e3)

    By S. Banisi, J. Marois, A. R. Laplante

    "This paper compares the behaviour of gold and ore in the grinding circuit of Hemlo Gold Ltd. Particular attention is given to grinding kinetics, classification behaviour, and liberation. For grinding

    Jan 1, 1991

  • CIM
    Geophysical methods applied to gold exploration saskatchewan case histories

    By Rodney R. Koch

    The phys ica l properties of gold should faci li tate its detection. However, the average concentration of gold in the ea rth's cru st precl udes the ability of geophys ical methods to detect the meta

    Jan 1, 1986

  • CIM
    Influence of Artificial Cooling and Pressure Application on the Metallurgical Quality in the LPPM Casting of Aluminium A356

    By F. Chiesa

    Forty aluminium A356 castings were poured on a Low Pressure Permanent Mould industrial machine, 500x700mm in platen size. The 152mm wide casting comprised three steps, 25mm, 13mm, 6mm in thickness and

    Jan 1, 2007

  • CIM
    Failures of Front-Wheel Spindles of Large Haulage Trucks at Open-Pit Mines in B.C.

    By R. T. Saxon

    Prior to November 1975 there were several failures of front -wheel spindles on large haulage truck s in B.C., attributed to fatigue cracks. Since that time, a non-destructive test program has succeede

    Jan 1, 1977

  • CIM
    Stability Assessment of Rock Slopes: Towards an Inverse-Reliability-Based Methodology

    By Xiang Li, Xibing Li

    It is paramount that the stability of rock slopes be correctly accounted for under diverse operating and environmental conditions. Owing to different sources of uncertainty entailed in such stability

    Jan 1, 2015

  • CIM
    The Nanuq Diamond Project, Rae Domain, Western Churchill Province, Nunavut

    By Jennifer Pell

    Dunsmuir Ventures? Nanuq diamond project is located approximately 250 km northeast of Baker Lake and 170 km north of Chesterfield Inlet. It occurs at the intersection of the Wager Bay shear zone with

    May 1, 2004