Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Time Delay of the Temperature Measurements in High Temperature Furnace
By M. A. Marois
This paper proposes an improved temporal stability condition for the implementation of an inverse heat transfer method for predicting the time-varying bank thickness of the phase change protective ban
Jan 1, 2011
-
Iron Behavior in the Hydrocoppertm Process
By L. Haavanlammi
Iron is a significant component of all copper concentrates leached in the HydroCopperTM process. The metals in the concentrate are leached in a chloride solution by oxidation with cupric ions. Copper
Jan 1, 2006
-
Strategies for Patenting “Green” Technologies
By V. Vekris
A diverse patent portfolio and an effective intellectual property strategy are vital in today’s small business world. Not only does a diverse patent portfolio enable a company to secure a monopoly wit
Jan 1, 2019
-
Collaboration Between NGOs and the Mining Industry In the Third World
By Tony Breuer
Can international development NGOs and the mining industry find common ground and work together in the Third World? The Canadian Hunger Foundation/PARTNERS in Rural Development (CHF-PARTNERS) has, ove
May 1, 2001
-
Evolution and Progress in Underground Research Laboratories, Development Facilities, and Multi-Disciplinary Studies
By John A. Hudson, Xia-Ting Feng, Joseph S. Y. Wang
Evolution over decades and progress over last five years have been made in many topics of interests to rock mechanics, geosciences, physics, and multi-disciplinary interactions in underground research
Jan 1, 2015
-
P.T. Freeport Indonesia's Sag Plant: Flowsheet, Start-Up & Training Issues
By Rick Coleman, Chelvan (Chevy) Veloo
"P.T. Freeport Indonesia's lrian Jaya Operation has been producing copper concentrate continuously since 1972. Numerous ore discoveries and five mill expansion programs have seen the initial milling r
Jan 1, 1996
-
Mining Methods and Costs at the Sherritt Gordon Mine
By Eldon L. Brown
Location and History The Sherritt Gordon property is located in northwestern Manitoba, about 100 miles north of The Pas and 40 miles northeast of Flin Flon. It is connected with the Manitoba Northern
Jan 1, 1933
-
Evolving Equipment Health, a Rio Tinto Case Study
By Daniel D. M. Adams
Over the last 100 years industry in general has been trying to advance the ability to maintain systems through management processes. Mining has looked to utilize onboard data systems in our mobile min
May 1, 2011
-
Thermal analysis and microstructural evaluation of intermetallic compounds formed during pre- and post-eutectic reactions in 319 aluminum alloy
By S. G. Shabestari
Thermal analysis is a tool that is generally employed to predict the structure of the alloy before the actual casting is carried out. By cooling a sample of the molten alloy and recording the temperat
Jan 1, 2004
-
Main Controlling Factors of the Mining-Induced Deformation and Failure of Surface Borehole and their Time-Space Effect
By Jianzhong Liu
Based on the characteristics of overburden rock strata movement, surface ground subsidence and casing deformation and failure, a tension-shear combination failure model of surface borehole was set up.
Aug 1, 2013
-
Investigation of an active noise control system to reduce the noise emitted by an industrial stack
By Martin Bouchard, Bruno Paillard, Jean-Claude Dubé, André L’Espérance
"A precise analysis of the noise emitted by an aluminum plant has shown that one of the main sources of noise is the noise emitted by an exhaust stack 40 m high and 1.8 m diametre, emitting a pure ton
Jan 1, 1997
-
Bringing fuel cell technology to market ? Bridging the gap from technical success in the laboratory to product success in the marketplace
By A. Varma
Successful technology commercialization occurs when a company is focused on creating shareholder value by providing a reliable product at a price point attractive to the market, while at the same time
Jan 1, 2005
-
CAMIRO -Metallurgical Processing Division
By A. H. Winckers
"CAMIRO, The Canadian Mining Industry Research Organization, formerly known as MITEC, is a collaborative research organization of Canadian Mining Companies. It is comprised of Exploration, Metallurgic
Jan 1, 1998
-
Tower Mill
By G. Griffiths
"P. WitteWitteck DevelopmentThe implications of using a tower mill for fine grainding in the ore processing of tailings are significant. What can those of us who are in a research and development situ
Jan 1, 1984
-
A Numerical Study of the Effects of Face Support Pressure And Soil Material Properties on Face Deformation and Lining Stresses In EPB Shield Tunneling - A Case Study of Mashhad Metro Line 2
By Saba Gharedash
In this study the results of a series of numerical simulations which are conducted for one of the tunnels of the Mashhad metro line 2 project are presented to evaluate the role of tunnel face support
Aug 1, 2013
-
Ball Charge Dynamics and Liner Wear Simulation
By Peter Raziszewski
"A ball charge dynamics model is presented. Simulation results are compared with observed data showing good correlation. Based on the charge dynamics models, a liner wear model is presented along with
Jan 1, 1997
-
Pelletizing and agglomeration
By D. Maddocks
"IntroductionThe greater part of the iron ore industry in Canada is located along the Labrador-Quebec border on a geological formation known as the Labrador trough. The Labrador trough is a 700 · mile
Jan 1, 1989
-
Iron Castings
By J. E. Rehder
IN A DISCUSSION of use of any material of ?construction in the mining industry, two points of view must 'be kept in mind - that of the producer or manufacturer of mining and metallurgical equipme
Jan 1, 1956
-
Kinetics of the CESL Gold Process
By E. Asselin, P. Sauve, H. Salomon-de-Friedberg
"Residues from the CESL Copper process were leached using the CESL Gold process. The kinetics of reaction were confirmed to be fast with over 50% of the gold consistently extracted within 2 minutes of
Jan 1, 2012
-
Pilot plant study on improved electrostatic precipitation of copper converter dust
By L. Lamothe, C. H. The
"Pilot precipitator tests were conducted at Noranda's Horne Smelter in late 1978 to evaluate methods of improving converter dust collection efficiency. A bout 35 Nms/min. of converter off-gas wer
Jan 1, 1985