Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Special Aspects of Circuits Design with the use of HPGR Technology Based on Pilot Testing Data and Industrial Operating Experience

    By A. Y. Senchenko, Y. V. Kulikov

    "In recent decades HPGR technology has proven itself in comminution circuits of mining plants. High technical and economic performance, lower specific energy consumption and reliability of HPGR equipm

    Jan 1, 2016

  • CIM
    A Simulation Model For Underground Roadway Development Processes

    By Ernest Baafi

    A simulation model RoadSIM using the ARENA modelling system has been developed to evaluate roadway development options for a given development panel configuration. The RoadSIM simulation system has pr

    Oct 1, 2009

  • CIM
    Effect of Process Water and Leach Temperature on the Leaching Behaviour of New Caledonian Nickel Laterite Ores

    By M. Laframboise, M. Buarzaiga

    High-pressure acid leaching (HPAL) of nickel laterites has received considerable attention in recent years. High paymetals extraction, good selectivity, and advances in pressure hydrometallurgical tec

    Jan 1, 2004

  • CIM
    Pillar Extraction at the Sullivan Mine

    By P. T. Bloomer

    Introduction Mining of the orebody of the Sullivan mine, which is owned and operated by the Consolidated Mining & Smelting Company of Canada, Limited, has reached a point where pillar extraction is

    Jan 1, 1948

  • CIM
    Longwall mining and potash

    By G. Herget

    "A brief visit to European longwall mining operations in potash showed that retreating longwall mining provides a very attractive alternative to room-and pillar mining, especially in areas with bad ro

    Jan 1, 1986

  • CIM
    A Unique Gold Casting Alloy for Dental Applications.

    By Paul J. Cascone

    This paper will discuss the science behind the development of a unique gold alloy for dental prosthetic applications. The alloy (GOLDTECH BIO2000) contains 99.7% gold providing unquestioned biocompati

    Oct 1, 2003

  • CIM
    Zinc Electrowinning - Operating Data

    By M. Moats, J. A. Gonzalez

    A review of operating practices in zinc electrowinning plants is presented in this paper. Surveys were sent to several zinc electrowinning plants and data provided by some of these plants was compiled

    Jan 1, 2008

  • CIM
    Mining Gold Ore at Pioneer

    By Allan P. Fawley

    ONE hundred miles from Vancouver, at an elevation of 4,000 feet, is the Pioneer mine. It is situated on Cadwallader creek, a tributary of Bridge river, and is reached by travelling from Vancouver to S

    Jan 1, 1937

  • CIM
    Portraying Geological Structure of Canadian Coalfields

    By B. R. MacKay

    Introduction Of all Canada's mineral resources, its coal deposits have probably received the most continued attention by the Geological Survey since its inception ninety years ago. A casual revi

    Jan 1, 1932

  • CIM
    The Mount Fronsac North Volcanogenic Massive Sulfide Deposit: A Recent Discovery in the Bathurst Mining Camp, New Brunswick

    By G. Graves, J. A. Walker

    "Abstract - The Mount Fronsac North volcanogenic massive sulfide deposit is the most recently discovered massive sulfide body in the Bathurst Mining Camp. The deposit occurs within a sequence of inter

    Jan 1, 2006

  • CIM
    Open Pit Production Planning using Controlled Pushbacks and Aggregates

    Open pit production planning is a procedure consisting of multiple stages. Although all the planning stages rely on the geostatistical block models, long- to short-term plans each require their approp

    Aug 1, 2013

  • CIM
    Shortcomings of Environmental Assurance in Mining and the use of Insurance as a Complement

    By Richard Poulin

    Rehabilitation of mined out areas is often enforced by environmental bonding. It is usually assumed that this process provides financial assurance that rehabilitation will be carried out as agreed at

    May 1, 2004

  • CIM
    Control of Iron in the Hudson Bay Zinc Pressure Leach Plant

    By S. Shairp

    The first commercial application of the Dynatec two-stage zinc pressure leach process commenced operation at the metallurgical complex of Hudson Bay Mining and Smelting Co., Limited in Flin Flon, Mani

    Jan 1, 2006

  • CIM
    An Examination of the Failure Mechanisms in Modeled Cemented Paste Backfill

    By R. L. Veenstra

    This paper explores the connection between the stresses observed and the failure mechanisms present in the modelled cemented paste backfill. In order to look at this connection, the authors have used

    Aug 1, 2013

  • CIM
    Online X-ray fluorescence analysis of potash materials at various stages of processing

    By A. Sokolov, E. Hasikova, V. Gostilo, V. Titov

    Introducing online X-ray fluorescence (XRF) analyzers in the mining and processing industries can lower costs and improve the representativeness and speed of analysis. The applicability of the CON-XTM

    Jan 1, 2014

  • CIM
    Geology of the Bachelor Lake Gold Mine, Desmaraisville, Abitibi-East, Quebec

    By Y. Buro

    The Bachelor Lake gold deposit occupies an ESE-trending, SW-dipping, silicified shear zone with hematitic alteration. It transects NE-trending, steeply dipping Archean volcanic formations and the O'Br

    Jan 1, 1984

  • CIM
    The Copper Mountain Mine of Gaspe Copper Mines, Limited

    By J. C. White

    This paper, after a brief introduction giving the history and geology of the area, deals with mining operations at the Copper Mountain mine of Gaspe Copper Mines, Limited. It discusses development ope

    Jan 1, 1969

  • CIM
    Dynamic Bubble Nucleation in Flotation

    By P. Cleyle, J. H. Masliyah, R. S. Chow, Z. H. Xu, Z. A. Zhou

    Bubble nucleation in water under dynamic conditions was investigated using an autoclave at an air saturation pressure of 7 atm. Agitation during air saturation of water was found to be crucial in enha

    Jan 1, 2009

  • CIM
    Strip Pit Mining in Coalspur Area, Alberta

    By W. C. Whittaker

    Introduction When one thinks of a coal stripping deposit, the picture that usually comes to mind is that of a more or less flat seam from two to twenty feet in thickness overlain by ten to fifty feet

    Jan 1, 1935

  • CIM
    The Elemental Distribution and Precipitation Kinetics of Chromium Dispersoids in Al-Mg-Si Alloys

    By J. Fellowes, Z. Liang, J. Robson, M. Kenyon

    "Dispersoids play a significant role in the recrystallization and texture development for wrought Al-Mg-Si (6xxx series) alloys by inhibiting grain boundary motion. It is therefore important to unders

    Jan 1, 2018