Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Cobalt CampBy Robert Thomson
"The Cobalt camp is by far the most productive camp of the Temiskaming silver-cobalt area. The date of discovery, 1903, is an important one in the history of Canadian mining; from then on prospecting
Jan 1, 1949
-
Quantitative modelling of the segregation of magmatic sulphides: an exploration guideBy P. C. Lightfoot, J. M. Duke, A. J. Naldrett
"The segregation of magmatic sulphides from mafic and ultramafic silicate magmas, in many circumstances, leaves the magma with a lower-than-normal Ni/MgO ratio, which is characteristic of both lavas e
Jan 1, 1984
-
Fault diagnosis in metallurgical process systems with support vector machinesFault detection and identification are major challenges in process engineering and manufacturing and the key component of abnormal event management systems. Timely detection, diagnosis and rectificati
Jan 1, 2005
-
Hydrometallurgical Process for Treating Copper Concentrates at Sumitomo Metal MiningBy S. Asano
Hydrometallurgical processes for treating copper sulfide concentrates have attracted considerable attention over thirty years and many processes have been developed. However there have been still prob
Jan 1, 2007
-
Scale Model Study of Time Domain Electromagnetic Response of Tabular ConductorsBy A. Becker, C. Gauvreau, L. S. Collett
"A scale model was designed to simulate the airborne Barringer INPUT time domain electromagnetic system. The amplitude of the response to a vertical conductive dyke varies considerably with the conduc
Jan 1, 1972
-
Energy Benchmarking of Slurry Pump Systems using the New Concept of Benchmark Energy Factor (BEF)By Constantin Pitis, Paul Slatter, Behnam Pirouz, Laura Contasti, Markus Zeller, Sadegh Javadi
"The centrifugal slurry pumps feeding cyclones are critical components used in the grinding process. It is well known that for this type of pumps the performance degradation is very intense. To minimi
Jan 1, 2017
-
Development of a Stable Social Unit at the Black Angel MineBy P. J. Noakes
Remote and isolated, located in a frigid, hostile environment, the Black Angel mine in Greenland had to create a warm social environment which would help attract and retain a stable work force of mine
Jan 1, 1978
-
The Need for a Mine Erosion and Sedimentation Control Plan Guidance Document for Exploration, Construction, Operation and ClosureBy J. Clark
Erosion control during the mining cycle can be more effectively planned using Erosion and Sedimentation Control Plans (ESCPs). This raises the issue of who should develop an Erosion and Sedimentation
Aug 1, 2013
-
Using Real Time Elemental Analysis of Conveyed Ore Flows to Improve Copper ProcessingReal time analysis of ore quality between the mine and mill provides major benefits to copper mining and processing operations. Prompt gamma neutron activation analysis (PGNAA) is a proven technique t
Jan 1, 2019
-
Pyrite’s Crucial Role in Cobre Las Cruces Atmospheric Leaching ProcessBy Jorge Blanco, Joaquin Gotor, Enrique Delgado, Carlos Frias
Since 2009 Cobre las Cruces (CLC) has successfully operated a sustainable mining business near Seville, Spain, applying the most advanced hydrometallurgical technologies to process secondary copper su
Jan 1, 2016
-
The mineralogy of gold and its significance in metal extractionBy Claudia Gasparrini
"Factors affecting the extraction of gold are of a mineralogical nature. Knowledge of the mineralogy of the ore or metallurgical product to be treated, if appropriately combined with the metallurgical
Jan 1, 1983
-
Dewatering of planned Key Lake open pits in northern SaskatchewanBy Werner Unland, Nick Holl
"The paper presents the engineering design and experience gained so far with a dewatering system for an open-pit uranium mine planned at Key Lake in Northern Saskatchewan.The results of hydrogeologica
Jan 1, 1980
-
The Gulf of St. Lawrence Carboniferous Basin; The largest coalfield of eastern CanadaBy Peter A. Hacquebard
"Two continuous coal zones occurring in a 2500f t (762 m) thick section of the Upper Carboniferous Pictou Group (Westphalian C and D) have been encountered in five offshore wells drilled f or oil and
Jan 1, 1986
-
A New Paipote Process of Continuous Fire Refining of CopperBy G. Riveros
A new, continuous fire refining process for copper has been developed and tested at the 5 tph pilot scale. During oxidation, the blister copper flows through a packed bed of crushed refractory bricks
Jan 1, 2007
-
Using the discrete-element method to investigate ball milling power draw, load behaviour, and impact energy profileBy M. B. Kime
"Discrete-element method (DEM) modelling is a powerful tool for studying particulate systems within the mineral processing industry. DEM simulations were conducted to investigate the power draw, load
Jan 1, 2017
-
Virtual Modeling in Tube Hydroforming Process of Complex Aluminium PartsBy Mihaita Matei
An adaptive approach to control the deformation in tube hydroforming process is presented. This requires: the use of an existing non-linear FE software (ABAQUS) that incorporates a user material model
Jan 1, 2011
-
A New Era in Pressure HydrometallurgyBy Fathi Habashi
A new era in pressure hydrometallurgy is marked when the roasting - leaching - electrowinning process in the zinc industry was replaced by direct pressure leaching of zinc concentrate. Since then, the
Jan 1, 2014
-
Hyperspectral Remote Sensing Characterization of Mine Materials for Process ControlBy Isabel F. Barton, Matthew J. Gabriel, Mark D. Barton
Process control, mine-to-mill optimization, and other mining operations depend on having robust, comprehensive mineralogical and chemical characterization. However, current characterization methods re
Jan 1, 2019
-
Poisson Impedance as a Rock Physics Attribute for Developing Geomechanics Earth Models: Case Study from Southwest IranBy SeyedBijan Mahbaz
Development of Geomechanical Earth Models (GEM) is a prerequisite to reservoir management, involving issues such as stress path analysis, prediction of induced seismicity and sanding initiation, and c
Jun 1, 2012
-
Overview of overburden removal at Syncrude Canada Ltd.By Y. P. Malhotra, JE. C. Carter
"Syncrude's overburden removal requirement ranges from 20 million to 30 million bank cubic metres per year to meet tarsand demands for the production of 129,000 barrels of synthetic crude oil per
Jan 1, 1983