Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Fording River Mine-an overview

    By P. J. Urso

    "This paper discusses the mining problems encountered at the Fording River coal mine to date, and how they have been solved. All of the production now comes from surface mining, but underground hydrau

    Jan 1, 1980

  • CIM
    Copper smelting to the year 2000

    By W. G. Davenport

    Methods of extracting copper are evaluated in terms of innovations during the 1970's, and predictions to the end of this century are made. It is concluded that between one and two new smelters an

    Jan 1, 1980

  • CIM
    Iron Deposits of the Labrador Trough

    By H. E. (Buzz) Neal

    "Abstract - The Labrador Trough contains world-class iron deposits which have been mined since 1954. The direct shipping of Knob Lake ores were mined at Schefferville from 1954 to 1982. Concentrate pr

    Jan 1, 2000

  • CIM
    The French Mine, Hedley, B. C.

    By John Lamb

    "The French Mine (formerly the Oregon) is 4 miles by road south of the Nickel Plate Mine. It lies on the steep eastern slope of the Similkameen River valley at elevation 4,000 feet, between Cahill and

    Jan 1, 1949

  • CIM
    Backfill practices at the Williams mine

    By D. Bronkhorst, J. Rheault

    "Backfill practices at the Williams mine have evolved significantly since underground mining began in 1986. The use of conveyors as a means of transporting fill material to stopes has been discontinue

    Jan 1, 1994

  • CIM
    Prospecting in the Quebec Gold-Belt

    By K. W. Fritzsche

    The prosperity of any nation depends, to a large extent, on its natural resources such as oil, coal, 'metal, timber, waterpower, and fertile soil. Each one of these resources forms the basis of a

    Jan 1, 1925

  • CIM
    Choosing the best fire-suppresant system

    By Lorne Roberts

    "This paper describes: how Falconbridge's fire protection system meets the needs of the Lockerby Mine; why the system was chosen over other alternatives; how it is unique, but can be applied to a

    Jan 1, 1982

  • CIM
    Conversion of Dome Mine No.8 shaft timber guides to steel guides and refits of shaft hardware and skips

    By W. G. Spencer, E. Sulis, P. M. Tiley

    "Dome Mine's No.8 shaft is located about 1 km northeast of Dome's No.3 shaft and mill complex in South Porcupine, Ontario.No.8 shaft was brought into production in 1984 to hoist ore and wast

    Jan 1, 1993

  • CIM
    Gold mineralization in the Atikokan area

    By B. R. Schneiders

    "Atikokan is 200 km west of Thunder Bay and earned its mining fame from the discovery of the Steep Rock Iron Range in the late 1930s. Gold, however, was discovered in the Atikokan and Mine Centre area

    Jan 1, 1983

  • CIM
    The Future of Gold in Electronics

    By Timothy W. Ellis

    Gold-based materials have been a mainstay of the electronics and semiconductor industry since the physics was just a laboratory curiosity. Gold is the workhorse material in wire bond, flip chip and of

    Oct 1, 2003

  • CIM
    Structure of the Chibougamau Area, Quebec

    By R. Bruce Graham

    "For the purpose of this paper, the Chibougamau area is taken as lying between lats. 49°20’ and 50°10’ N;-longs. 73°45’ and 75°30’ W. It comprises an area of some 4,000 square miles and is centred 300

    Jan 1, 1949

  • CIM
    Development of the Genesee power project

    By David C. Mulder

    As a result of the dramatic growth of Edmonton, Alberta during the past decade and the rapidly increasing price of natural gas, Edmonton Power has received provincial government approval to construct

    Jan 1, 1981

  • CIM
    Electrical Safety in the Mining Sector

    By Nelson Lawrence

    An Electrical Risk Management/Inspection Program has been designed specifically for the mining sector in order to provide electrical code expertise and systemic gaps in electrical systems. Goals inclu

    May 1, 2006

  • CIM
    Geology of the Gem Molybdenum Deposit

    By M. J. Young, C. A. Aird

    "The Gem molybdenum prospect is situated at the head-waters of Clear creek, between the Fraser river and Harrison lake, about 30 miles north of• Harrison Hot Springs, B.C. Clear creek follows a deeply

    Jan 1, 1969

  • CIM
    Integration and Analysis of Airborne Geophysics and Remote Sensing Data of Sar Cheshmeh Area, Using Directed Principal Component Analysis

    By M. Honarmand, Z. Moezifar, H. Ranjbar

    Abstract - The Sar Cheshmeh area covers an area of 640 km2, and is located in the southern part of the Iranian Volcanic-Sedimentary Belt. ETM+ images have been used for alteration mapping. The Crosta

    Jan 1, 2002

  • CIM
    The Australian coal industry future developments

    By Trevor McGiddy

    "Australia's prosperity relies significantly on income generated from exports of resources and agricultural products. In 1989-1990, coal was Australia's most valuable export commodity, contr

    Jan 1, 1992

  • CIM
    The Railway's Part In Coal Mining

    By D. W. McDonald

    Coal mining and railway transportation are so closely en-twined and so dependent one upon the other that the failure of one would mean the total collapse of the other. With this indisputable fact in m

    Jan 1, 1924

  • CIM
    The Swedish Methods of Electrical Prospecting

    By Hans Lundberg

    During the last few years, geophysical methods have been introduced to aid mining geologists and mining engineers in locating mineral deposits. These methods have been developed as the result of inves

    Jan 1, 1926

  • CIM
    The Renard Diamondiferous Kimberlitic Bodies, Quebec

    By Tyson C. Birkett

    Initial indicator mineral sampling covering 425,000 square km of northern Quebec and subsequent follow-up of positive results convinced the Ashton ? SOQUEM joint venture to acquire mineral rights to 3

    May 1, 2003

  • CIM
    The Responsibilities of a Mill Superintendent

    By G. J. Hawkes

    "We all know that every man who works for us should have a thorough knowledge and understanding of his responsibilities. But how about ourselves? Du we have a thorough knowledge and understanding of o

    Jan 1, 1965