Size And Loading Rate Effects Observed In Plate Load Tests On A FillBy Kazuyuki Matsuzawa
A series of plate loading tests were carried out on a loam ground in order to investigate the influences of the plate size and the loading rate on the observed load-settlement relations. Two circular
Jan 1, 2006
-
Life Extension of 132 kV Lattice Tower FoundationsBy Allan Herse
"The years following World War II were nation building years in Australia. Soldiers returned from the European and Asian theatres of war sparking a major infrastructure construction boom. Dams and hig
Jan 1, 2017
-
ISM MICROPILE WORLD CUP 2017 WINNER - Life Extension of 132 kV Lattice Tower FoundationsBy Allan Herse
"The years following World War II were nation building years in Australia. Soldiers returned from the European and Asian theatres of war sparking a major infrastructure construction boom. Dams and hig
Jan 1, 2017
-
Analysis Of Driving Stress Measured In The RC Long PileBy Yu Zhenquan
At the construction site of Bao Shan Iron &. Steel Mill in Shanghai, lots of RC driven piles with length of 50 to 60m were applied. The most unfavourable distribution of stress along the pile shaft wa
Jan 1, 1991
-
5 Pile Testing - Pile TestingBy George Goble
I hope that after the long evening and all the exercise that some of you took you won't be completely exhausted to listen to a little bit about pile testing. The topic that 1 have been given is
Jan 1, 1994
-
Bell Bottom Cast-In-Place Piling By Reverse Circulation Drill ? SynopsisBy T. Soejima
In recent years, there has been a tendency in the field of foundation piling works to utilize piles of greater bearing capacity in order to meet increasing height and weight of modern building as a me
Jan 1, 2010
-
Foundations Of The 'Kö-Galerie' In Düsseldorf Using Top/Down Building TechnologiesBy P. Arz
With a total of five basement levels, ground floor and a further six levels above grade, construction of the Kö-Galerie building, on the Königsallee, in the centre of Düsseldorf, was completed with al
Jan 1, 1989
-
Predication Of Heave For Deep Excavation With Irregular Plane ShapeBy Zhang Jiaju
For the highrise buildings with deep foundstion of irregular plane shape, an appropriate calculate model to the heave of foundation soil after excavation is proposed and studied using analytic method
Jan 1, 1991
-
6000 Ton Osterberg Load Test Reduces Foundation Costs For Delaware River TramwayBy Aly M. Mohammad
The Delaware River Tramway will link civic and retail developments in Philadelphia, Pennsylvania and Camden, New Jersey. Twin 300-foot towers will anchor the cables at either side of the river. Four h
Jan 1, 2002
-
Diaphragm Walls for Seepage Control and Remediation: Three Case HistoriesBy Fabio Santillán, Mario Mauro, Raffaella Granata
"This paper presents the utilization of slurry walls methods for the recent remediation of three high hazard active dams in the United States. Tuttle Creek Dam, located in Manhattan, KS, required seis
Jan 1, 2016
-
A Novel Approach to Incorporate Shear-Moment Coupling Effects in Foundation Stiffness for Caisson Piles for Izmit Bay Bridge in TurkeyBy Arash Khosravifar, Amalia Giannakou
"Nonlinear foundation springs for bridge caisson foundations show significant coupling between the shear force and bending moment. Implementing foundation stiffness matrix with coupling effects (off-d
Jan 1, 2017
-
Rehabilitation of U.S. 70 Bridge over Lake HamiltonBy Ryan P. Sullivan, G. Alan Klevens, Jian Huang
"BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91
Jan 1, 2007
-
Rehabilitation of U.S. 70 Bridge over Lake Hamilton (de2c0766-552c-4812-a9ab-394a9bebc445)By Ryan P. Sullivan, G. Alan Klevens, Jian Huang
"BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91
Jan 1, 2007
-
Installation Of Three Up To 120M Deep Diaphragm Wall Shafts, With Diameters Between 8M And 35M At Woodsmith Mine In North Yorkshire (England)By Gustav Jahner, Michael Baltrusch, Norbert Hoffmann
Near the port city of Whitby in the north-east of England, Anglo American (AA) is setting up the deepest mine in the UK, which will have a depth of 1,500m. The purpose of the project is to extract and
Sep 1, 2022
-
Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure SitesBy John P. Davis
The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s
Jan 1, 2006
-
Foundation Reuse: Overcoming ResistanceBy Sara Anderson, Rachel Nicholls, Tim Chapman, Janice Windle
"In city center sites around the world, and in particular in London, foundation reuse is becoming increasingly widespread as the ground is filled with detritus from previous developments. This paper s
Jan 1, 2005
-
Capacity Of Slender Steel PilesBy J. Wennerstrand
Slender steel piles have found an increased use in Sweden in resent years. These piles are often driven throw soft normally consolidated clay to refusal in till or at the rock surface. In contrast to
Jan 1, 1989
-
Winter Marine Construction In Northern Alberta - Construction Of Baffle Walls Sundance Cooling Pond Expansion Sundance Generating Plant Wabamun, Alberta, Canada ? IntroductionBy Robert R. Morrison
Alberta Piling Contractors very rarely are required to perform major marine construction in the prairies, so it became as a big surprise to AGRA Foundations Limited to be invited by Transalta Utilitie
Jan 1, 1997
-
The Deep Cut-Off at the Walter F. George Dam"TREVIICOS CorporationINTRODUCTIONThe Walter F. George lock and dam was constructed on the Chattahoochee River between 1955 and 1963 with the double function of improving navigation and generating pow
Jan 1, 2014
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered SandstoneBy Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006