Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Study on a Method for Determining the Proper Cover Soil Depth for Cement Ground Improvement in Cold Region
By Masahiko Yamaki, Takahiro Yamanashi, Hijiri Hashimoto, Hirochika Hayashi
"In this study, the authors used heat conduction analysis with the aim of quantitatively evaluating whether treating improved ground with cover soil is an effective measure for maintaining strength de
Jan 1, 2015
-
Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo Dam
By Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro
"San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million
Jan 1, 2015
-
Single Pile Settlement Prediction And Analysis For Driven Piles
By David R. Beadman
The Fleming method is widely used for the analysis and prediction of single pile behaviour under maintained loading. The method does not distinguish between bored and driven piles. Driven piling avoid
Jan 1, 2006
-
Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver Formation
By Ken Andromalos
Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili
Jan 1, 2007
-
Case Study: Load Transfer Analysis on an Instrumented Augercast Pile Using EDC Strain Gauges and Geokon Rebar Strainmeters
By Sastry Putcha, Santosh Mummaneni, Swamy Avasarala, Vamshi Vemula
"This paper presents the results from a case study on the comparison of two strain acquisition instrumentation technologies, Geokon rebar strainmeters and Embedded Data Collectors (EDC) for the DC Wat
Jan 1, 1900
-
The Test on Effect of Polyanionic Cellulose on Process of Filtrate Loss of Low Solid-Phase Drilling Fluid (cdc8479e-b761-4427-8d26-4088be3d5ab5)
By Ping Yang, Tian-bin Li, Min-hui Wu
"The process of filtrate loss of low solid-phase drilling fluid at different content of polyanionic cellulose is investigated by the standard filtration test. The test results showed that when time of
Jan 1, 2017
-
Deep Soil Mixing Design and Construction for Surface Fault Rupture Mitigation
By James R. Gingery, Byron Foster, Bret Lingwall
While microzonation and setbacks are the typical mitigation for structures exposed to surface fault rupture hazards, lifelines and lifeline facilities are not easily relocated to avoid faulting. In th
Sep 8, 2021
-
Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current Practice
By Jim Slatter, Ben Collingwood
"It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali
Jan 1, 1900
-
Getting Paid In Hard Times - I. Formation Of The Contract
By Dennis J. Riley
A. This outline addresses what a sub-contractor, or a subsub-contractor should do to get paid in the event the general contractor or building owner files for bankruptcy. B. Negotiating payment ter
Jan 1, 1991
-
Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley Site
By Gyimah Kasali
Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)
Jan 1, 2002
-
Rehabilitation Of Existing Foundation Piles Of Marine Structures In New York City Harbor, USA
By P. B. Kelleher
Most of the piers and other pile-supported marine structures in the New York City Harbor area were constructed prior to the widespread use of currently available pile protective systems. As a result,
Jan 1, 1989
-
Execution And Evaluation Of High Capacity Caisson Load Tests In Glacial Deposits
By Franklin M. Grynkewicz
As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped "residuals" tanks. Contract documents called for these struc
Jan 1, 1992
-
Piled Rafts: Are We Modelling Them Correctly?
By Jonathan J. Dewsbury
It is argued that approximate computer based methods are only suited to modelling conventional piled rafts, for pile enhanced rafts where the interactions will be non linear three dimensional finite e
Jan 1, 2010
-
Long-Term Performance Of Wind Turbine Foundations Through Numerical Modeling
By Spencer Ness, Yazen Khasawneh, William Tjaden, Mohammad Nassim
The evaluation of long-term performance of the wind turbine structures is essential in lowering the Levelized Cost of Electricity (LCOE) from wind sources. The required maintenance of the wind turbine
Oct 1, 2022
-
Case History On Pipe Pile Installation - Presented At An Associated Pile & Fitting Corp. GEO-Pile Conference San Francisco, CA
By Jerry F. Parola
In current practice, pile foundation design is based on a general under-standing of pile-soil interaction during installation and superstructure-pile-soil interaction after construction. The pile desi
Jan 1, 1986
-
World Financial Center Foundations, New York
By G. Tamaro
The World Financial Center is situated on a 60,000 square meter site at Battery Park City at the southern tip of Manhattan Island. The foundations for the buildings and the related infrastructure pose
Jan 1, 1989
-
Discussion On Base Grouted Piles
By V. M. Troughton
Further pile load testing has been carried out at Canary Wharf to compare the performance of base grouted and ungrouted bored piles founded in the Thanet Sand. The testing regime included three prelim
Jan 1, 1991
-
Maturation of Risk Concepts in the Management of Infrastructure - Lessons from the US Army Corps of Engineers
By Eric C. Halpin
"1. Introduction and Backgrounda. In its fundamental form, risk is simply the likelihood of an adverse impact. Expanding on this theme, the Corps of Engineers has broadly defined risk associated with
Jan 1, 2014
-
Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design Parameters
By Martin D. Larisch
The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.
Nov 1, 2022
-
Removal of the Former San Francisco-Oakland Bay Bridge Foundation Caisson E3 by Mechanical Means and Explosives
By Michael Gebman, Jack Gerwick
"With the opening of the new San Francisco-Oakland Bay Bridge East Span, the former bridge and its caisson foundations are being demolished. Caisson foundations are in the path of a future shipping ch
Jan 1, 2016