Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Blast Optimization using Air Decking with Gasbags – An Open Pit Gold Mine Case Study.

    By Angelina Anani, Seffit Aderuyi, Sylvester Avane, Joseph Wilson-Sey, Amatus Niminye

    The Edikan mine in Ayamfuri, Ghana, faces economic challenges and community resistance due to its proximity to residential areas, particularly concerning blasting operations. Controlled blasting trial

    Jan 21, 2025

  • ISEE
    Blast design optimization system to improve mining downstream operations by adapting the explosive energy to the rock mass based on drill monitoring data

    By P. Couceiro, J. Navarro

    A new methodology to perform selective blast designs by adapting the explosive energy, hole by hole (or in the hole), to the rock properties as a combination of their strength properties through the X

    Jan 1, 2024

  • ISEE
    Flyrock Elimination Program Part 3: 3D Bench Photogrammetry

    By Brian Sandhuas, Robert McClure

    All flyrock incidents have the potential to result in injuries or fatalities that can result in loss of company reputation, license to operate with clients, and bear the exposure to high cost liabilit

    Jan 1, 2012

  • ISEE
    Fragmentation Improvement Through the Application of Explosive Charge in the Stemming for the Reduction of Oversize in High Hardness Rock

    By Gustavo Huerta Valer, Jorge Cárdenas Miranda, Johan Salas Flores

    One of the challenges of mining is the optimization of the blasting process, which has an important impact downstream in the processing of crushed ore in the plant, that is why mining companies ensure

    Feb 6, 2023

  • ISEE
    Drill and Blast Digitalization

    By Ricardo Dr. Chavez, Mathieu Lachamp, Rob Dr. Farnfield

    Pueblo Viejo is an open pit gold mine in the Dominican Republic which is always looking forward to implement the newest technology in the industry to improve all processes. Focusing on one of the pill

    Jan 1, 2019

  • ISEE
    Vibration Data Analysis to Optimize the Blast Design and Improve Shovel Productivity

    By Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira

    The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a

  • ISEE
    Transforming Underground Blasting Operations into Primary Crushing Operations

    By Christopher Jon Preston, Troy Williams, Daniel Roy

    There has been significant progress made with narrow vein gold mines in which a second option for crushing has begun to attract attention. To ensure the profitability of a mine that has based its econ

    Jan 1, 2019

  • ISEE
    Flyrock Range & Fragment Size Prediction

    By Cameron McKenzie

    Flyrock is a complex issue involving interaction between the charging crew, the blast design, and the local geology, and once conditions on the shot meet certain criteria, the probability of a flyrock

    Jan 1, 2009

  • ISEE
    Safeguarding Historic Underground World War II Structures from Surface Quarry Blasting – a Case Study

    By Shazad Hosein, William J. Birch, Robert Farnfield, David Jameson, Catherine E. Johnson

    The current and consented quarry workings at a slate quarry in North Wales {UK} intersect old long abandoned underground slate mine workings. The old underground slate mine contains the remains of Wor

    Jan 21, 2025

  • ISEE
    Effect of Blasting Vibrations from Deck Blasts on Pit Wall Stability (Blasting and Fragmentation Vol. 11, No. 1, 2017)

    By B Mohanty, A Siamaki, K Esmaeili

    Large scale open pit mining and quarrying operations dictate safe and reliable pit wall stability. The current approach of employing the particle velocity-scaled charge distance approach to estimate a

    Jan 1, 2017

  • ISEE
    Some Aspects of Design and Evaluation of Perimeter Control Blasting in Fractured and Weathered Rock

    By Andrew F. McKown

    Overbreak and damage to rock walls at the perimeter of rock excavation can lead to safety problems due to rock falls and additional costs due to a] extra mucking, b] extra concrete or shotcrete to bac

    Jan 1, 1984

  • ISEE
    Vibration Data Analysis to Optimize the Blast Design and Improve Shovel Productivity

    By Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira

    The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a

    Feb 1, 2020

  • ISEE
    Epic Blast of 275 US Ton (250 tonnes) Sets Benchmark in Opencast Mining Arena in Environmental Sensitive Area With Desired Fragmentation and Muck Profile.

    By Tapas Kumar Mukherjee, Sujit Kumar, Sanjay Kumar Singh

    This paper dwells on the epic blast conducted at Tata Steel’s captive coal mine in India and the insights drawn from it. Optimal blast design parameters had to be ascertained for operating benches (6.

    Jan 1, 2019

  • ISEE
    Ground Vibration Attenuation Rate due to Blasting in South Florida

    By W. Sharkey Bowers

    This study was undertaken in order to determine a conservative estimate of the attenuation rate of vibrations through the shallow limestone in South Florida due to quarry blasting.

    Feb 1, 2020

  • ISEE
    Modeling of rock fragments trajectories ejected from blasting based on high-speed video analysis

    By Jaime Herrero, Santiago Gómez, Pablo Segarra, José Ángel Sanchidrián

    This paper presents a mathematical model for the study of the 2D movement of blast bench faces based on the high-speed video analysis of three blasts at El Aljibe quarry (Spain) recorded at 2,000 fram

    Jan 26, 2026

  • ISEE
    Using Artificial Intelligence and 3D Imaging to Provide Real-time Particle Size Analysis on Haul Trucks

    By Saeed Karimifard, Saman Nouranian, Shahram Tafazoli, Bahram Sameti, Frank Chu, Caitlin McKinnon, Tetiana Konstantynivska, Glen Turner

    Continuing blast optimization is the cornerstone of any mine-to-mill approach, and particle size analysis is a key metric for meeting blast targets to reduce overall energy consumption and operating c

  • ISEE
    New Methodology for Calculating Dynamic Pressure

    By Jorge Cárdenas, José Luis Hurtado

    The critical distance determination test through direct recording for the mine in Phase 03 was carried out in January 2024, and in it the vibration and pressure models were obtained for the Sedimentar

    Jan 21, 2025

  • ISEE
    Intrinsic Benefits of Presplitting - Relieving Gas Penetration in Addition to Lowering Blast Vibrations to Highwalls

    By J. P. Remi Proulx, Areli Rodriguez, Ruilin Yang

    Historically, presplitting has been considered effective in reducing the impact of blast vibrations on highwalls. However, it remains a debated topic: how significantly can it protect highwalls, and i

    Jan 21, 2025

  • ISEE
    Reducing Blast Vibration Amplitudes Close-In to Structures of Sub-Standard Construction

    By Enrique Munaretti, Cathy Aimone-Martin, Vitor Rosenhaim, Jair Koppe

    Production blasts at one of Copelmi’s coal mine operations will be carried out 100 m (330 ft) from a neighborhood located in the town of Butiá, southern Brazil. Mine management is concerned about the

    Jan 1, 2013

  • ISEE
    Optimizing Drill and Blast Parameters for Enhanced Fragmentation and Cost Efficiency in Open Pit Mines.

    By Shadrack Nuamah, Erik Westman, Bright Afum, Jesse Addy

    Rock fragmentation is the most critical aspect of hard rock production blasting due to its significant impact on drilling and blasting costs and the economics of subsequent loading, hauling, and crush

    Jan 21, 2025