Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Breakeven Extraction Factors For The Merensky Reef Using Stope Width And Market Price SimulationBy M. G. Wimberger
The Merensky Reef zone, as developed on Impala Platinum?s Rustenburg Operations, displays a gradational mineralized zone, with grades decreasing from the Merensky Pegmatoid Unit into the footwall and
Jan 1, 2004
-
Optimizing LHD Utilization ? SynopsisBy D. Mkhwanazi
The purpose of the project was to optimize load haul dump (LHD) machinery use as they were spending too much time doing what they should not be doing. During the investigation, the author found that t
Jan 1, 2011
-
Applications of seismic hazard assessment methods in minesBy G. van Aswegen
Large structures in mines (faults, dykes, pillars, abutments) fail when the load exceeds the strength. If the loading system stiffness (LSS, also referred to as the ‘local mine stiffness’) is lower th
Jan 1, 2003
-
Utilization of environmental impact simulations in crushing plant operation, P. Papadopoulou, G. Asbjörnsson, E. Hulthén, and C.M. EvertssonBy G. Asbjörnsson, E. Hulthén, P. Papadopoulou, C. M. Evertsson
Crushing plant managers need to assess, manage, and communicate the environmental impact induced by their crushing plant operations as a step towards the sustainable development of the company. Howeve
Jan 1, 2020
-
Foreword (134b8950-7dbc-4a9d-ad1c-39bdc8a1a198)Pyrometallurgy has played a very important role in southern Africa for at least four centuries. It continues to do so, and recent years have seen many exciting developments in pyrometallurgical techn
Jan 1, 2006
-
A Twin-Cathode Dc Arc Smelting Test At Mintek To Demonstrate The Feasibility Of Smelting FeNi From Calcine Prepared From Siliceous Laterite Ores From Kazakhstan For Oriel Resources PlcBy H. Lagendijk, I. J. Reinecke
Mintek was contracted by Oriel Resources plc in 2004 to conduct a preliminary assessment study on smelting ferronickel from the large but relatively low grade Shevchenko nickel ore deposit in Kazakhst
Jan 1, 2007
-
Fully automated coal quality control using digital twin material tracking and statistical model predictive control for yield optimization during production of semi soft coking- and power station coalBy B. J. Coetzee, P. W. Sonnendecker
The quality control of a two-stage coal washing process involves several complex components that need to be modelled accurately, to enable autonomous control of the process. The first objective is to
Aug 2, 2022
-
Where is Your Advertisement?Where is Your Advertisement
-
1D Numerical Simulation of Velocity Amplification of P-Waves Travelling Through Fractured Rock Near a Free SurfaceBy G. Swan, E. Nordlund, P. Zhang
"SynopsisThe most widely used support design damage criterion for rockburst-prone mines is based upon kinetic energy, which is proportional to the square of the ejection velocity and is commonly expre
Jan 1, 2015
-
Silicomanganese alloy from rich manganese slag produced from Egyptian low-grade manganese oreBy H. El-Faramawy, A. Ahmed, M. Eissa, M. El-Fawakhry, T. Mattar, S. N. Ghali, E. M. Kotb
As a result of the depletion of high-grade manganese reserves, it has become necessary to consider the exploitation of low-grade manganese ores. The main problem of low-grade manganese ore is the low
Jan 2, 2022
-
Reduction Kinetics Of Manganese Oxide From HC FeMn SlagsBy M. Tangstad, D. Lu, G. Tranell, S. Gaal, J. Safarian
The kinetics of MnO reduction from high carbon ferromanganese slag was investigated using a sessile drop technique at 1600 ºC. The effects of reductant type, ambient atmosphere and slag composition on
Jan 1, 2007
-
Microstructure And Corrosion Properties Of Al(Ni/Tib2) Intermetallic Matrix Composite Coatings - SynopsisBy A. P. I. Popoola
Laser coatings are used for a wide variety of applications. TiB2/Ni intermetallic matrix composite coatings were fabricated on Al-substrate by a high power Rofin Sinar Nd: YAG solid-state laser. The c
Jan 1, 2011
-
The Balancing Act Of Size Vs. Cost Vs. PracticalityBy Org de Wet
This paper summarises the strategy for selection between a two module coal plant incorporating large, but less equipment, and a three module coal plant with more but smaller equipment. The two options
Jan 1, 2006
-
SPOTLIGHT on equipment alternatives in underground miningBy J. A. Cruise
From 27th to 29th September, The South African Institute of Mining and Metallurgy held a Colloquium on Equipment Alternatives in Underground Mining in Johannesburg. The Colloquium, which was highly su
Jan 1, 1988
-
Mining induced stress estimation for pillar extraction at shallow coverBy A. K. Singh, R. Singh, P. K. Mandal
On the basis of in situ study of pillar loading at different sites, an attempt is made in this paper to visualize the development of mining induced stress under varying geo-mining conditions. Field st
Jan 1, 2003
-
An Investigation On Underground Transport Roads And Influence On Safety And Productivity At Khutala Colliery ? SynopsisBy L. Lehasa
The purpose of the project was to investigate the challenges faced by Khutala Colliery pertaining to underground road construction and maintenance. Furthermore the influence of these challenges on pro
Jan 1, 2012
-
Developing Green Energy Projects in Southern Africa?A Mining Investment ApproachBy M. Seeger
The demographics and the growing numbers of people provide a strong signal that the demand for electrical power in Southern Africa will grow considerably over the foreseeable future. Without a steady
Jan 1, 2010
-
Spotlight On PyrometallurgyBy C. W. P. Finn
On 14th April, 1980, 76 delegates from industry, universities, and research laboratories gathered at the University of the Witwatersrand to attend the Pyrometallurgy Vacation School. Professor H. B. B
Jan 1, 1980
-
Rock Support In Southern African Hard Rock Mines.By Dennis Van Heerden
Southern Africa has a long history of underground hard rock mining dating back to the late 1800?s. The rock support of underground excavations has significantly changed during this period, due to impr
Jan 1, 2007
-
Applicability of the risk ranking methodology designed for water reservoirs to tailings storage facilitiesBy N. Nišić, A. Cvjetić, V. Jovanović, D. Knežević, D. Nišić
The risks associated with operating water reservoirs and tailings storage facilities (TSFs) are different because of their different purposes, methods of construction and operation, and characteristic
Nov 30, 2022