Overview of Low-Rank Coal Drying – Preprint 97-61By W. G. Willson, D. E. Walsh, B. Irwin
Low-rank coal (LRC) drying processes are generally categorized by operating temperature, drying environment and type of feed (either sized or ground coal). Within these broad categories, drying proce
Feb 24, 1997
-
Reverse Column Flotation Of Iron OreBy T. C. Eisele
The use of column flotation was considered for the ?reverse flotation? of iron ore, where the gangue (quartz) was recovered in the froth product. This use of the froth for carrying the gangue mineral
Jan 1, 2007
-
Comparison Of Arched And Flat Seal Designs Using Finite Element AnalysisThe failure of a seal in an underground coal mine can have devastating consequences. Traditionally seals have been constructed as flat walls. Large hydraulic dams, on the other hand, are constructed
Jan 1, 2007
-
Marcona Pyrrhotite Flotation From Magnetite - IntroductionBy William A. Cline
The iron mine and beneficiation facilities of Marcona Mining Company are located on the coast of south central Peru. The facilities include an open pit mine, crushing, concentrator containing grinding
Jan 1, 1974
-
Metallurgy Analytics: Transforming Plant Data into Actionable InsightsBy Osvaldo Bascur, Barun Gorain, Jaco Steyn
"The last few decades have seen some remarkable advancement in information technology, but recently various digital technologies have resulted in several synergies to deliver innovation in diverse app
Jan 9, 2018
-
Industrial Mineral Sustainability OpportunityBy F. G. Heivilin
There will be 3 billion people moving into cities by 2050. Permitting is both the biggest obstacle and the biggest opportunity for mining. The problem is not if we have the right minerals, but how we
Feb 27, 2013
-
Load Sharing Methods Of Backstops In Conveyor Drive SystemsBy K Timtner
As shown in former publications there are problems in load sharing of backstops in multiple drives of conveyors. Therefore, detailed calculation methods and design recommendations are required. In thi
Jan 1, 1998
-
Development Of New Geophysical Technique For Mineral Exploration And Mineral Discrimination Based On Electromagnetic MethodsBy Michael S. Zhdanov
One of the major problems of mineral exploration is the ability to reliably distinguish between uneconomic mineral deposits and economic mineralization. While the mining industry uses many geophysical
Jan 1, 2005
-
An Innovation In Machine TunnelingBy J. Donovan Jacobs
Many improvements in the art of underground excavation have appeared during the past two decades. These improvements have been both in methods and in machinery and have resulted in more economical con
Jan 1, 1974
-
Engineering Work Leading To A Rock Tunnel PlanBy Forrest C. Neil, Clint J. Keifer
The pollution of our water supply, Lake Michigan, is a continuing threat so long as our overflows from combined sewers exist. The problems have become even more acute during recent years, due to the i
Jan 1, 1997
-
Getting The Engineer?s Estimate RightBy Tom Martin
Mega projects present unique challenges with regard to estimating costs. With such projects, which may span decades, these challenges often begin as soon as a project is conceived. The importance of h
-
Benefits of a Good Quality Assurance Program to an Electric UtilityBy W. J. Mahoney
A good quality assurance program at a coal mine or power plant is accurate, timely and consistent. The quality analysis is accurate due to a complete sampling of the coal stream loaded into the unit t
Jan 1, 1994
-
Regrind Mills: Scaleup Or ScrewupAs ore deposits become finer grained the requirements for regrinding before cleaning or leaching have increased substantially. Despite this increasing need, there is no standard test to predict grind
Jan 1, 2011
-
Rehabilitation of a Brick-Lined AqueductBy Taehong Kim, Carl Pannuti, Nikolas Sokol, Walter Herrick
BACKGROUND This paper discusses work performed as part the rehabilitation of the gravity flow section of the New Croton Aqueduct (NCA) during an approximately two year period between 2004 and 2006
Jan 1, 2007
-
Minerals Planning Policies in EuropeBy S. Solar, G. Tiess, K. Nielsen, H. Wagner
The paper summarises the results of a recent study of minerals planning policies of the Member States of the EU. The study has shown that contrary to the public opinion the production of industrial mi
Jan 1, 2005
-
Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, CaliforniaBy Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow
The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo
Jan 1, 2007
-
Analysis of CIM's study of best practices for the estimation of lithium brinesBy Ihor Kunasz
The high lithium demand forecasted for some high tech applications and batteries for electric and hybrid-electric vehicles, in particular, has sparked increased exploration for lithium, particularly f
Oct 1, 2013
-
More than 1,800 exhibitors in 12 halls will be at MINExpo International 2016By William Gleason
"It is the largest mining exhibition in the world that attracts thousands of attendees from around the world to Las Vegas, NV once every four years. Despite the recent struggles in the mining industry
Sep 1, 2016
-
A Multi-Criteria Decision Support System For Open Pit Mine Planning Under Geological And Market Uncertainties - Preprint 09-008By S. A. Abdel Sabour
Conventional methods for selecting a production plan for an open pit mine is based on the assumption that ore grades throughout mine life as well as market variables are known with certainty. Another
Jan 1, 2009
-
Construction of Deep Shafts and Ground Improvement for the West Side CSO Tunnel Project, Portland, OregonBy Yves St-Amour, Vince Luongo
This paper will discuss one of the largest construction projects the City of Portland has undertaken. This phase of the Willamette River Combined Sewer Overflow (CSO)project consists of approximately
Jan 1, 2005