Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pogo Mine Control System: A Hybrid of DCS and PLCThe Pogo Mine, near Delta Junction, Alaska is a new 2500 STPD gold operation. The control system of the mine and milling operations are a hybrid of DCS (Distributed Control System) control and PLC (Pr
Jan 1, 2008
-
Grouting and Segmental Linings—Proceed with CautionBy Thomas Gregor, Brian Garrod
As the popularity of precast concrete segmental linings for tunnels is growing in North America, some problems related to grouting of, and near, these linings are starting to appear. The installat
Jan 1, 2005
-
Development Of Continuous Rapid Curing (CORAC) Process For Cold Bonded PelletsBy K. Yatsunami
NKK has developed a new cold bonded pellet process. The features of this process are; 1) it is a continuous process with 10 hours curing. 2) Products can be used as materials for various metallurgical
Jan 1, 1984
-
Mining and Sustainable Development at Red DogBy D. H. Horswill
The Red Dog Mine is the world’s largest zinc mine. It is located 145 km (90 miles) north of the Arctic Circle in northwest Alaska on lands owned by the Inupiat Eskimo organization called the Northwest
Jan 1, 2000
-
Ore Size, A Major Factor Affecting The In-Situ Uranium Acid Leaching - IntroductionBy Harry Wolf
The chemistry of the element uranium enables industry to employ either an acid or alkaline carbonate leach solution for most uranium ores. Either method my be used for conventional, in-situ, or heap l
Jan 1, 1981
-
Exploration Procedure ,And Controls Of Mineralization In The Oatman Mining District, Oatman, ArizonaBy C. G. Clifton
The Oatman District produced approximately 2.2 x 10 6 ounces of gold and 0.8 x 10 ounces of silver between 1897 and 1942. A total of 3.8 x 10 tons of ore averaging 0.58 O/T gold and 0.17 O/T silver wa
Jan 1, 1980
-
Damage To Residential Structures From Surface Mine BlastingBy David E. Siskind
The Bureau of Mines has studied the problem of cracking in residential structure walls from vibrations produced by blasting in surface mines. Direct observations were made of blasting damage consistin
Jan 1, 1980
-
Geotechnical And Structural Design Challenges Of The Fremont Central PARK Subway For The Bart WARM Springs ExtensionBy Mitchell L. Fong
The Bay Area Rapid Transit (BART) District will be extending BART service south along an 8.7-km (5.4-mile) -long corridor in the city of Fremont, California as part of the Warm Springs Extension (WSX)
-
Problems In The Magnetic Roasting Of Marginal Iron OresBy G. Bitsianes
An experimental procedure was developed for studying magnetic roasting on a accurately-controlled laboratory scale. The loss-in-weight method was used and the course of reduction could be followed und
Jan 1, 1960
-
Slope Steepening Investigations for the Valley Pit at the Teck Highland Valley Copper Mine Using Presplit BlastingBy Nick Rose, Mathieu Veillette, Matthew King
"The Teck Highland Valley copper (THVC) mine is located approximately 55 km (34 miles) southwest of Kamloops and approximately 20 km (12 miles) west of Logan Lake, BC, Canada (Fig. 1). Mining at THVC
Apr 1, 2019
-
Simulation And Economic Evaluation Of Coal Combustion Residue Transportation And Handling SystemsBy H. Sevim
Three transportation and handling alternatives for delivering dry coal combustion residues from power plants to underground coal mines were evaluated technically and economically. The objective was to
Jan 1, 1996
-
Application of Mining Width‑Constrained Open Pit Mine Production Scheduling Problem to the Medium‑Term Planning of Radomiro Tomic Mine: A Case Study - Mining, Metallurgy & Exploration (2024)By Juan L. Yarmuch, Gonzalo Sepulveda
This article presents a novel approach to address the mining width-constrained open pit mine production scheduling problem in the context of medium-term planning. A mathematical formulation is propose
Mar 28, 2024
-
Subsidence Impacts On Infrastructure And Drainage: Reestablishing A Stable Channel Using Geomorphic Design PrinciplesBy G. Krogman, C. Walla, B. Wood
The Gebo Mining District (District) is located in the Bighorn Basin of Wyoming. Commercial underground coal mining began in 1906 with the arrival of the railroad in Thermopolis, which is located appro
Jan 1, 2006
-
Computerized Open Pit Mine Models -The State Of The ArtBy Young C. Kim
Introduction and Objective of This Paper Computerized open pit mine models* are more and more used today for feasi¬bility studies as well as for long range mine planning. In fact, using these model
Jan 1, 1977
-
Fundamental Aspects of Fine Coal FiltrationBy J. A. Mejia
The combination of high-resolution X-ray microtomography (HRXMT) image analysis and Lattice-Boltzmann Method (LBM) simulations has demonstrated the ability to describe real multiphase flow problems in
Feb 23, 2014
-
On the Management of Gangue Minerals in the Flotation of PlatinumGroup Minerals Mining, Metallurgy and ExplorationBy Kirsten Corin, Belinda McFadzean, Cyril O’Connor, Jenny Wiese
The Bushveld Complex of South Africa contains almost 90% of the world’s reserves of platinum group minerals (PGMs). In the flotation of PGMs, there are significant challenges arising from the need to
-
Mt. Baker Ridge Tunnel: Construction Of A Large Diameter Soft Ground Tunnel By The Stacked Drift MethodBy John F. MacDonald
This paper describes the driving of a 400 m long by 25 m diameter highway tunnel through sensitive, overconsolidated silts and clays. The design concept requires the construction of the permanent supp
Jan 1, 1985
-
Installation Of A Supervisory Control System At A Gold Pressure Oxidation Plant (edba5c85-6442-4bfd-bdfb-2b55fb328e40)By M. Spangler
FirstMiss Gold installed a supervisory control system based on Pavilion Technology's Process Insights neural network software and Oil System's PI data historian. The primary goal of the syst
Jan 1, 1995
-
The Recovery Of Hematite And Chromite Fines And Ultrafines By Wet Magnetic Methods (e9d4edea-7542-4ba5-a636-1deab2fb583f)By Y. Wang
Wet magnetic separation methods for recovering hematite and chromite fines and ultrafines are investigated in this paper. These methods include wet high intensity and high gradient magnetic separation
Jan 1, 1993
-
Machinery And Equipment Design As Dictated By Energy ConservationBy G. Kris Kapoor
Each new period of public concern, whether rooted in things political, social, economical, or technological, brings with it new words or phrases which highlight that new interest. With people's a
Jan 1, 1975