Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Preparing High Sulfur Coal For EPA Compliance

    By Atmesh K. Sinha

    The demand for thermal coal both nationally and internationally is projected to increase rapidly. The marketability of high ETU thermal coal produced in the USA is, however, limited by its high sulfur

    Jan 1, 1983

  • SME
    Effect of air velocity on conveyor belt fire suppression systems - SME Transactions 2010

    By H. Verakis, M. A. Hockenberry, A. C. Smith, J. H. Rowland III

    Four different types of fire suppression systems were evaluated in large-scale fire experiments to study the effect of air velocity on their effectiveness in extinguishing conveyor belt fires. The fou

    Jan 1, 2010

  • SME
    Comparison of Fire Suppression Techniques on Lithium‑Ion Battery Pack Fires - Mining, Metallurgy & Exploration (2023)

    By Liming Yuan, Wei Tang, RICHARD THOMAS, JOHN SOLES

    Lithium-ion battery pack fires pose great hazards to the safety and health of miners. A detailed experimental study has been conducted at the National Institute for Occupational Safety and Health (NIO

    May 4, 2023

  • SME
    An Examination of Mining Companies’ Online Health and Safety Policies: Implications for Improving Organizational Performance

    By D. R. Willmer, E. J. Haas

    "DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the views of the National Institute for Occupational Safety and Health. Reference to sp

    Jan 1, 2018

  • SME
    The Effect of Chemical and Physical Coal Properties on Handling Behavior

    By Barbara J. Arnold

    A coal's size distribution, clay content and moisture content can affect its handling behavior, but the combined effects of these properties and the effects of other properties are not known. Res

    Jan 1, 1990

  • SME
    Concentrator Expansion at Freeport Indonesia’s Grasberg Operations

    By Rick Coleman

    PT Freeport Indonesia’s (PTFI) latest expansion has increased total mill throughput to 125kt/d (137,700 stpd). The most recent expansion included the installation of a semiautogenous mill (SAG) desig

    Jan 1, 1996

  • SME
    Numerical Impact Assessment of Axially Loaded Piles and Their Seismic Effects on an Existing Bored Subway Tunnel - NAT2024

    By Keivan PakIman, Maziar Pasdarpour

    Transportation tunnels are highly sensitive to ground movements and are required to be stable and secure for safe operation. In urban areas, the interaction between tunnels and adjacent piles, which a

    Jun 23, 2024

  • SME
    Rehabilitation Of A Failed Haul Road In An Asbestos Open Pit

    By W. D. Bullock

    The King-Beaver mine of Asbestos Corporation Limited operates an open pit in the city of Thetford Mines, Quebec. The approximate loca-tion of the open pit is at Latitude 46° 02' North and Longitu

    Jan 1, 1980

  • SME
    Removal of Fine Particulates and Metal Ions from Process Discharge Waste Water Using Ac Electro-Coagulation Technique

    By J. G. Groppo, J. G. Justice, B. K. Parekh

    Removal of particulates and/or metal ions from mineral/coal processing waste water is a necessity from the environmental point of view. This paper describes application of a novel AC- electrocoagulati

    Jan 1, 1992

  • SME
    Empirical Approach Based Estimation of Charge Factor and Dimensional Parameters in Underground Blasting "Mining, Metallurgy & Exploration (2021)"

    By VIVEK KUMAR HIMANSHU, M. P. Roy, P. K. Singh, A. K. Mishra, RAVI SHANKAR

    Blasting with the aim to reduce oversize boulders in underground has many hurdles due to limited accessibilities and poor site conditions. Optimized drilling and blasting parameters can help to achiev

    Jan 4, 2020

  • SME
    Construction Of Pacific Gas And Electric Company's Kerckhoff-2 Underground Hydro-Electric Project 1980-1983

    By Earl M. Woodward

    INTRODUCTION Kerckhoff-2 is a 140 MW underground hydro-electric project designed and owned by Pacific Gas and Electric Company and constructed between May, 1980 and May, 1983 by Auburn Constructors

    Jan 1, 1983

  • SME
    New dimension to account for sample error and volume support in resource estimation - SME Transactions 2011

    By C. V. Deutsch, J. B. Boisvert, J. L. Deutsch

    Data used to build geostatistical models come from a wide variety of sources with potentially differing sample errors and volume supports. Typically all available sample measurements are pooled togeth

    Jan 1, 2011

  • SME
    Preventing Coal Waste Impoundment Breakthroughs into Underground Mines: How well are we doing?

    By J. F. Mack, P. R. Michael, J. M. Shapaka, S. J. Self, M. W. Richmond

    "On October 11, 2000, an estimated 306 million gallons of water and coal waste slurry drained from an impoundment in Martin County, eastern Kentucky into an adjacent underground mine. Approximately 23

    Jan 1, 2015

  • SME
    Rio Piedras Project Completion: San Juan, Puerto Rico

    By Brian Fulcher, Matthew Bartlett, Jarrett E. Carlson

    This paper discusses the challenges to complete the construction of two large underground Metro stations and connecting tunnels in the Tren Urbano system. The completion work includes the installation

    Jan 1, 2003

  • SME
    Regulatory Aspects Of Subsidence Under Surface Mining Control And Reclamation Act

    By Dermot M. Winters, Brent T. Wahlquist, C. Y. Chen

    The enactment of the Surface Mining Control and Reclamation Act (SMCRA) in August 1977 addressed subsidence resulting from underground mines, in addition to creating the requirements for reclamation o

    Jan 1, 1986

  • SME
    Stability Design And Evaluation For Mine Entry System Based On Reliability Theory (2a7c3c76-8a46-41a6-8658-40029708549a)

    By V. Z. Sun

    One of the major concerns of ground control in a coal mine is safety against failure of one of three components (i.e. roof, pillar, or floor) of the mine entry. In order to better design and evaluate

    Jan 1, 1997

  • SME
    Detecting Diesel Particulate Matter Using Real Time Monitoring Under the Influence of an Exhaust Fan System

    By Y. H. Alghamdi, A. D. S. Gillies

    "INTRODUCTION Background Diesel Particulate Matter (DPM) has been a critical issue during the last decade in underground mines. This problem is threatening the health of mine workers, as well as the m

    Jan 1, 2016

  • SME
    Combustion Characteristics of Coal Blends

    By S. Bhattacharaya, S. Aich, B. K. Nandi

    "At present scenario, there has been an increasing demand in the usage of blend coal in power sector; regardless of how, specific knowledge on burning and ignition characteristics and their interactiv

    Jan 1, 2017

  • SME
    Individual Mineral Behavior In A Closed Grinding Circuit

    By J. A. Finch

    A closed grinding circuit, typified by a ball mill-cyclone combination, is often required to treat a feed comprised of a variety of minerals of differing properties. Usually, the individual behaviour

    Jan 1, 1977

  • SME
    Investigation Of Groundwater Characteristics Using Dual Tube Reverse Circulation Drilling

    By G. R. Doubek

    Dual Tube Reverse Circulation (DTRC) drilling has been extensively used for collecting groundwater information for the dewatering program at Amax Gold Inc. Sleeper Mine. This paper presents a discuss

    Jan 1, 1992