Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pressure Oxidation Process Development: Beware Of Laboratory Testing Results!By J. Gathje
Normal process development for pressure preoxidation treatment of refractory gold ores starts with laboratory batch autoclave tests, followed by operation of a continuous autoclave pilot plant for con
Jan 1, 1995
-
Molybdenum Roaster OptimizationBy J. Andres, M. Cross
"Freeport-McMoRan’s Sierrita operations has two natural gas-fired molybdenum roasters for converting molybdenum disulfide into molybdenum trioxide. When these roasters were compared to other similar u
Jan 1, 2015
-
Centrifugal Pump Maintenance (Slurry Applications)By D. C. Edwards
In an age where customer service and quality drive today's industry and business, no service or product is exempt from these demands. Industry and business are streamlining everything from people
Jan 1, 1996
-
A Holistic Assessment Of Slope Stability Analysis In Mining Applications - Introduction - Preprint 09-046By K. Sample
Slope stability analysis plays an integral role in the design of various mining applications including waste dumps, heap leach piles, solution ponds, and tailings dams. Generally, limit equilibrium an
Jan 1, 2009
-
Increasing the Specific Surface Area of Dolomite by Stirred Ball MillingBy Eric Forssberg, Ming-wei Gao
Four parameters of the Drais stirred ball mitt, i.e., bead load, bead size, flow rate and top feed size have been studied regarding their influence on the specific surface area. A factorially designed
Jan 1, 1992
-
Biologically Assisted Control of Selenium in Process Waste WatersBy D. M. Larsen, K. R. Gardner, P. B. Altringer
The Bureau of Mines, U.S. Department of the Interior, is conducting batch and small- scale continuous laboratory studies on the biologically assisted removal of selenium from process waste waters. Mix
Jan 1, 1989
-
Concentration of silicon carbide with a density separation processBy W. L. Dalmijn, J. M. Versteegen
During the production of silicon carbide, a byproduct is generated that contains a mixture of crystalline and amorphous silicon carbide. Utilizing the difference in density, shape, and surface propert
Jan 1, 1991
-
Strategies For Permitting Mines With Delayed Environmental ImpactsBy J. H. Kempton, D. Atkins
Predictions of delayed environmental impacts from mining—degradation that won’t begin for hundreds of years, but will then continue for thousands—present new permitting challenges. Examples include ev
Jan 1, 2000
-
Real-Time Process Control Using Object Oriented Expert SystemsBy Lynn B. Hales, Randy A. Yncbausti, Rick Smith
Object oriented programming has been developed to model the way we think about the world. It allows higher levels of abstraction, generalization and classification than many other programming techniqu
Jan 1, 1992
-
In-Situ Electromagnetic Probing Of Coal SeamsBy Sidney A. Suhler
The persistent requirement for methods and equipment capable of detecting hazardous anomalies in advance of underground mining has led to the development by the U.S. Bureau of Mines of a directional r
Jan 1, 1983
-
Concentration of Silicon Carbide with a Density Separation ProcessBy Johan M. Versteegen
During the production of silicon carbide a by-product is generated, which contains a mixture of crystalline and amorphous silicon carbide. Utilizing the difference in density, shape and surface proper
Jan 1, 1988
-
Copper Recovery From Mill Tailings By CyanidationBy John F. Clarkson
White Pine Copper Company built and operated, from August, 1962 through May, 1963, a pilot plant to recover copper using a cyanide percolation leach of the sand fraction (+400 mesh) of the mill tailin
Jan 1, 1975
-
Liberation Modeling And Parameter Estimation For Multicomponent Mineral Systems (6ec02ec5-1642-4640-b362-58afc468cb85)By R. K. Mehta
A review of the literature reveals that methods for simulating the coupled behavior of size reduction and liberation are limited to binary mineral systems containing one composite particle class. The
Jan 1, 1989
-
The Development Of The Fosfago Phosphate Rock Concentrator, BrazilBy M. F. Dibble
The Fosfago phosphate rock concentrator is located in the state of Goias, Brazil, 300 km south of Brasilia. The ore is from an enriched carbonatite, which was discovered in 1971 during exploration for
Jan 1, 1980
-
The Validity Of Computer-Aided Mine Ventilation System DesignBy A. K. Sinha
Modern mine ventilation systems have grown rapidly in recent years both in tern of its complexities as well as its value for human health and safety. Although computer models are now available to help
Jan 1, 1985
-
Emergence of Differential Social License: A Case of Impact and Benefit Agreements in Nunavut, CanadaBy Peter Moser, Michael Hitch, Michael Tost, Susanne Feiel
"Impact and Benefit Agreements (IBAs) are intended to be a negotiated agreement between an industrial proponent and a community, local or regional citizens’ organization. Although the elements have gr
Jan 1, 2017
-
Process Advances at Lac Minerals Ltd. Est Malartic DivisionBy George Hope, Jacques McMullen
Recent process advances at Lac Minerals Est Malartic Division are discussed. The Est Malartic mill treats massive sulphide, copper/gold ore from the Bousquet 2 mine, to produce a gravity gold product,
Jan 1, 1993
-
Coal Preparation Plant Facilities Old Ben Mine No. 21 Sesser, Franklin County, IllinoisBy J. W. MacDonald
PROPERTY AND PRODUCTION: Around 100 Million Tons of Recoverable Coal are available from the approximate 10,000 acres allocated to the mine. Over 1300 acres of surface land holdings extend well beyond
Jan 1, 1961
-
Examples Of Current Surface Mining Research: Operational And PotentialBy Martin B. Treuhaft
Expectations for coal in the early to mid-1970's prompted the government and industry to pursue research and development programs to increase underground and surface mining coal productivity and
Jan 1, 1983
-
How To Move Inland Coal By Water -Including A Nine Mile Single Flight ConveyorBy Robert W. Greene
Next month, American Commercial Barge Line Company will begin moving coal from mines on the old Camp Breckinridge property in Western Kentucky to TVA's new 2600 MW steam plant at Cumberland City,
Jan 1, 1971