Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Geomechanic Monitoring And Distributed Information Systems

    By G. I. Gritsko

    In this paper we consider the elements of a distributed information geomechanic monitoring system which is used in computerized mine planning and mining operations control. The automated system is a t

    Jan 1, 1996

  • SME-ICGCM
    Analysis of Small-Scale Thrust Faults and Their Effect on Coal Mining in Southern West Virginia

    By Thomas Z. Jones

    Deep mining within the Sewell Coal member of the New River Formation in southern West Virginia has exposed several small-scale thrust faults and related features. The faults were en- countered in West

    Jan 1, 1986

  • SME-ICGCM
    Clay Veins: Their Physical Characteristics. Prediction, and Support

    By Frank E. Chase

    Clay veins, also referred to as clay elastic dikes, have been responsible for numerous underground injuries and fatalities. These hazardous structures are also responsible for increased production cos

    Jan 1, 1984

  • SME-ICGCM
    Coal Pillar Design When Considered as an Overburden Reinforcement Rather Than Suspension Problem

    By Guy Reed, Russell Frith

    "Current coal pillar design is the epitome of suspension design. A defined weight of potentially unstable overburden material is estimated, and the dimensions of the pillars left behind are based on h

    Jan 1, 2017

  • SME-ICGCM
    High Horizontal Stress Effects On Longwall Gate Entry Stability

    By Yajie Wang

    High horizontal stress and its adverse effects on longwall gate entries have been witnessed in many US coal mines for the past years. It can cause cutter roofs and leads to roof falls either in the he

    Jan 1, 1996

  • SME-ICGCM
    Practical Aspects Of Mobile Roof Support Usage

    By F. E. Chase

    Mobile roof supports are shield-type support units mounted on crawler tracks. Mobile roof support (MRS) units are used during retreat mining, and they eliminate the setting of roadway, turn, and cross

    Jan 1, 1996

  • SME-ICGCM
    Innovative Secondary Support Technologies For Western Mines

    By Thomas M. Barczak

    With the development of the shield support, the primary requirement for successful ground control in longwall mining is to provide stable gate road and bleeder entries. Wood cribbing has been the domi

    Jan 1, 1996

  • SME-ICGCM
    Dynamic rock anchors

    By James J. Scott

    Dynamic rock anchors are interior fixtures developed by the author which promise to be a revolutionary development in the field of ground control. The fixtures are designed to be placed in the ground

    Jan 1, 1989

  • SME-ICGCM
    Considerations for Effective Ground Support in Evaporites

    By C. A. Vining, J. R. Nopola

    "Evaporites, such as salt and potash, pose unique problems to ground-support designs not encountered in other rock types. Evaporites are subject to continual creep and no amount of ground support can

    Jan 1, 2018

  • SME-ICGCM
    Fortrac® Geogrids For Mine Roof Control

    By Ray Brandon

    The recent introduction of polymer geogrids for ground control purposes in underground mines allows mine operators more flexibility in choosing improved products for several applications. This is evid

    Jan 1, 1996

  • SME-ICGCM
    A Hydrogeomechanical Study Of Overburden Aquifer Response To Longwall Mining

    By G. J. Hasenfus

    This paper presents the results of an extensive hydrological and geomechanical monitoring program which Gas conducted at a longwall coal mine in W. Va. The field program included monitoring of groundw

    Jan 1, 1988

  • SME-ICGCM
    Mining Through In-panel Entries and Full-face Recovery Room Without

    By John Smyth

    Mining through in panel entries and the full face recovery method has been successfully practiced at U.S. Stwl, Mine 50. Suppat of the cut-through entries and recovery room is critical. Traditionally,

    Jan 1, 1998

  • SME-ICGCM
    Effect of Roof Convergence on Stability of Underground Mine Seal Subjected to Explosion loading - Numerical Approach

    By Rajagopala Reddy Kallu

    After the Sago and Darby No. 1 mine incidents, the new regulatory standards for the design of mine seals in underground coal mines of the United States require the mine seals to withstand higher explo

    Jan 1, 2007

  • SME-ICGCM
    A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West Virginia

    By R. B. Alke

    Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o

    Jan 1, 1984

  • SME-ICGCM
    Characteristics of Coal Bursts in the North Fork Valley of the Gunnison River Valley, Colorado

    By Christopher Mark

    A coal burst is defined as the sudden, violent ejection of coal or rock into a mine opening. Coal mines in the North Fork Valley (NFV) of Colorado?s Gunnison River have a long history of coal bursts i

    Jan 1, 2012

  • SME-ICGCM
    Coal Mine Burst Prevention Controls

    By Anthony Iannacchione

    Coal mine bursts have represented a major hazard for U.S. mining operations for more than 90 years. During this time, many prevention controls have been developed and tested. This paper reviews 11 p

    Jan 1, 2008

  • SME-ICGCM
    Coal Bumps And Odd Dynamic Phenomena - A Numerical Investigation (70cea8ce-38a7-4c88-a596-77cf801d31b0)

    By Jeffrey K. Whyatt

    The Crandall Canyon accident investigation included an interesting and unexplained observation by rescuers that the ?barrier rib had shifted northward as a unit, as much as 10 feet.? This is not the

    Jan 1, 2009

  • SME-ICGCM
    Three-Seam Interaction: A Case Study

    By N. P. Kripakov

    Results of a complex three-seam interaction analysis in a western U.S. coal mine are presented. The physical situation simulated by the models represents the development of a set of entries underneath

    Jan 1, 1996

  • SME-ICGCM
    The Unpredictable Life Cycle of a Coal Pillar (b2bcadc5-82a3-454e-be3a-6b79e9867244)

    By Stephen Tadolini

    A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar

    Jan 1, 2007

  • SME-ICGCM
    Application of Neuro?Fuzzy Technique in Mine Support System for Ground Control

    By Sudhir Kumar Kashyap

    In underground activities ground control is a challenging problem. It affects safety, production, and efficiency. As per statistics of accident data, ?fall of roof/sides? is one of the major causes of

    Jan 1, 2012