Search Documents

  • AIME
    Modern Geophysical Methods in Prospecting

    By Hans Lundberg

    N OT so long ago, the discovery of an orebody took place only by accident. At the present time mineral deposits, even though concealed, may be revealed by their physical or geophysical characteristics

    Jan 1, 1925

  • NIOSH
    OFR-69-80 Process For Recovering Chromium And Other Metals From Superalloy Scrap

    By J. J. de Barbadillo

    This report describes a process for recovering chromium and other metals from superalloy scrap. Part I contains the results of laboratory scale experiments which were conducted to test a complex f

    Jan 1, 1980

  • NIOSH
    RI 8959 - Bulkheads and Drains for High Sandfill Stopes

    By R. L. Soderberg

    Large open stopes mined by vertical crater retreat or sublevel s are sometimes backfilled with uncemented sand to support the stope walls and alleviate rock bursts. The failure of bulkheads in two dif

    Jan 1, 1985

  • SME
    Recent Developments In The Allowances For Percentage Depletion

    By Frank H. Madison

    The percentage depletion deduction on Federal Income Tax Returns under the provisions of the 1939 Internal Revenue Code and of Sections 611 to Section 615, inclusive, of the revenue act of 1954, have

    Jan 1, 1958

  • NIOSH
    RI 3757 Technical & Economic Study of Packaged Fuel

    By Parry. V. F.

    "SUMMARY This report reviews the status of the packaged-for industry as of 1941. A field study was made of 35 representative plants to obtain technics and economic data on different types of processes

    Jun 1, 1944

  • SME
    An Evaluation Of The Strength Of Slender Pillars

    Pillars with width to height ratios of less than 1.0 are frequently created in underground hard rock mines. The strength of slender pillars can be estimated using empirically developed equations. Ho

    Jan 1, 2006

  • DFI
    Vibration Environmental Effect Of Construction Operations - Synopsis

    By Mark R. Svinkin

    Construction vibrations may be harmful to adjacent and remote structures, sensitive instruments and people. Construction vibration sources have a wide range of energy, displacement, velocity and accel

    Jan 1, 2000

  • CIM
    Plant Expansions and CIL Optimization at Iamgold's Rosebel Operation in Suriname

    By J. Grignon, C. Fleming

    It is possible to reproduce the performance of an operating CIP or CIL plant in the laboratory, in small scale batch kinetic tests, coupled with mathematical models that translate kinetic data into pr

    Jan 1, 2011

  • AIME
    Plenty of Oil for National Defense

    By JOHN R. SUMAN

    OVERWHELMING proof of the importance of oil in a modern national economy is afforded by the present European War. Treat¬ies and national boundaries have been cynically violated to secure greater supp

    Jan 1, 1941

  • SAIMM
    Grade Control Blending And Selectivity For Optimal Process Performance At The Skorpion Zinc Mine, Namibia

    By G B. Gnoinski

    The Skorpion Zinc Mine and Refinery is situated approximately 25 km north of Rosh Pinah, south-western Namibia. The supergene zinc oxide deposit at Skorpion is hosted in a volcano-sedimentary success

    Jan 1, 2007

  • SAIMM
    Fundamentals of freeze lining behaviour in ilmenite smelting

    Changes in reductant and energy inputs which are required to adjust the slag composition in anilmenite smelter to a higher or lower FeO content are calculated. The calculated changes are based on the

    Jan 1, 2003

  • SME
    The Green Mining Technique in Chinese Collieries

    By Minggao Qian, Jialin Xu, Wenqi Lai, Weibin Zhu

    This article advances an innovative concept explaining the connotation and technical system of "green" mining. The important theoretical foundations of "green" mining are the distribution and developm

    Jan 1, 2005

  • NIOSH
    RI 3299 Anhydrous Sodium Sulphate From Saline Deposits Or Brines By A Four-Stage Process

    By J. E. Conley

    Available statistics show that the demands of the American chemical industry for sodium sulphate have been increasing slightly in recent years. The supply from domestic sources, particularly In the fo

    Jan 1, 1936

  • SAIMM
    An investigation of mechanisms involved in backfill-rock mass behaviour in narrow vein mining - Synopsis

    By F. P. Hassani

    Today, mine backfilling has become an integral part of mining operations, both from a local and overall ground control point of view, and as regards mining techniques and environmental considerations.

    Jan 1, 2008

  • CIM
    Development of Processing Alternatives for Frankfield East Deposit Using Selective Arsenopyrite-Pyrite Flotation

    By R. Jackman, D. Koningen, G. Wilcox

    "Gowest Gold Ltd. is in the process of developing the Frankfield East gold deposit located along the largely undeveloped Pipestone fault northeast of Timmins, Ontario. In addition to resource developm

    Jan 1, 2012

  • SAIMM
    Small-Scale Recovery Of Noble Metals From Jewellery Wastes

    By J. H. Potgieter

    This paper describes an investigation to separate and selectively recover silver, gold and platinum from jewellery and laboratory wastes, and produce technical grade material suitable for training pur

    Jan 1, 2004

  • AUSIMM
    Research on Reduction-Magnetic Separation of Bayan Obo Ore

    Research on Reduction-Magnetic Separation of Bayan Obo Ore

    Sep 13, 2010

  • NIOSH
    IC 8745 Underground Mine Communications (In Four Parts) 4. Section-To-Place Communications (aa3134a4-8847-4c1e-a98e-b8bf7ce2479a)

    This Bureau of Hines report on underground mine communications addresses methods and equipment to meet the communication requirements of working sections and places of coal and metal-nonmetal mines. A

    Jan 1, 1977

  • SAIMM
    Development Of A Model Predictive Controller For A Milling Circuit

    Milling circuits are known to be difficult to control. In order to address these difficulties, it was decided to develop and test a model predictive controller (MPC) for a milling circuit. A milling s

    Jan 1, 2000

  • AUSIMM
    The Arrium IsaMill from Design through Commissioning and Optimisation

    By G Anderson, M Mativenga, C Stanton, M Larson

    Arrium’s magnetite concentrator has recently completed a modification program to improve the process that has been in operation in Whyalla, South Australia for the previous seven years. The magnetite

    Sep 7, 2015