Search Documents

  • SME
    Evaluating Underground Mining Hazards By Fuzzy FMEA

    By S. K. Oraee

    Managers always look for systems with minimum hazards. The hazards create problems for performance of projects. The largest and most important hazards of working underground mine can be related to he

    Jan 1, 2011

  • NIOSH
    IC 8472 Changing Investment Patterns Of The U.S. Petroleum Industry, 1950-68

    By Harry R. Johnson

    Domestic expenditures by the U.S. petroleum industry have exhibited distinctive shifts in emphasis over the past 20 years. From the end of World War II to 1955, expenditures for all phases of the indu

    Jan 1, 1970

  • SME
    Critical Minerals Management on the Federal Seabed - SME Annual Meeting 2026

    By Paul O. Knorr

    The Bureau of Ocean Energy Management (BOEM), a bureau within the U.S. Department of the Interior, has responsibility over both energy and non-energy mineral development on the United States Outer Con

    Feb 22, 2026

  • NIOSH
    Impact Of Fan Type For Reducing Respirable Dust At An Underground Limestone Crushing Facility

    By R. H. Grau

    Researchers from the National Institute for Occupational Safety and Health have demonstrated that mine-wide ventilation in large-opening stone mines can be improved by using low-pressure, high-volume

  • AUSIMM
    Social responsibility solutions provided by WebGen™ wireless initiation system in open cut mines

    By L Muñoz, L Steffen, W Vilas Boas, G Gontijo, R Macedo, C Braga, d D Machado, G Stevenson

    Mines operating close to communities face growing challenges, especially with their drilling and blasting activities. Proper management of environmental and community impacts is critical to provide su

    Sep 1, 2024

  • SME
    De Beers, Sandvik Team Up On Underground Automation

    De Beers? Finsch diamond mine began operation in the 1960s as a surface project using the latest technology available. During the 1990s, the operation, located about 160 km (100 miles) west of Kimber

    Jan 1, 2008

  • CIM
    The Road to Production-Line Mining II -Into the Seventies

    By E. Zucker

    In this paper, as in the 1960 CIM paper of the same name, s1gmf1cant new developments in electrical-mechanical mining equipment are briefly described. These include static thyristor-supplied D.C. driv

    Jan 1, 1969

  • AUSIMM
    Why combine reverse circulation and diamond drilling in Mineral Resource estimation at Purnama?

    By A N. Kasnanto, D A. Sims, J Pocoe, B Pulungan

    In this case study we compare the sampling quality of diamond drilling (DD) and reverse circulation (RC) drilling at the high sulfidation Purnama gold–silver (Au-Ag) deposit located in northern Sumatr

    Sep 20, 2017

  • AUSIMM
    Delivering a healthy atmosphere underground in a cost-conscious environment

    By D Reid, J Black

    The adverse health impacts from diesel particulate matter (DPM) exposure are a well-known global concern. The building evidence has triggered underground mining operations to review existing atmospher

    Aug 28, 2017

  • CIM
    Predictive Control and Real Time Optimization in the Minerals Industry

    By Quin Dennis

    Process Optimization ?What is it really? It is NOT ?a larger fan to increase draft through a process ?a larger pump on a wet circuit ?a wider conveyor belt for solid materials ?a larger feed el

    Nov 1, 2011

  • SME
    A Summary Of Respirable Coal Mine Crystalline Silica Dust Research Accomplished Through The Miner Act Under The Niosh Office Of Mine Safety And Health Research - SME Annual Meeting 2022

    By W. R. Reed, G. W. Luxbacher

    As directed by the MINER act of 2006, the NIOSH Office of Mine Health & Safety Research (OMSHR) has annually awarded contracts to enhance mine safety and health. OMSHR has a history of research that f

    Mar 2, 2022

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • NIOSH
    RI 9515 - Aspects of Genetic Algorithm-Designed Fuzzy Logic Controllers

    By C. L. Karr

    U.S. Bureau of Mines (USBM) research has shown that fuzzy logic and genetic algorithms (GA's) have great potential for industrial process control. A technique has been developed by the USBM in wh

    Jan 1, 2010

  • SME
    Earth Pressure Balanced Shield Machine To Cope With Boulders

    By Shigeru Nishitake

    The Earth Pressure Balanced (EPB) shields designed by Mitsubishi Heavy Industries, Ltd., are recently more enthusiastically accepted by tunnel boring specialists. This company having built 1,000 tunne

    Jan 1, 1987

  • SME-ICGCM
    Innovation in Rock Mechanics: Iced Tailings As Structural Backfill for the Citronen Mine, Ironbark Zinc Ltd., Greenland

    By Andrew P. Schissler

    The Citronen Zinc-Lead Project is one of the world?s largest undeveloped zinc-lead resources, containing more than 13 billion pounds of zinc and lead metal. The project is located in northern Greenlan

    Jan 1, 2012

  • NIOSH
    IC 8877 SIC-Based Demand Information System For Nonfuel Minerals

    By George K. Schenck

    This Bureau of Mines publication describes and evaluates a Standard Industrial Classification (SIC) based end-use data system for minerals that is designed to link the demand for minerals to economic

    Jan 1, 1982

  • SME
    Planning and Fast Track Tunnel Design in Historical Downtown Charleston

    By James McKelvey, Larry Drolet, Jason Swartz

    INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved

    Jan 1, 2005

  • AUSIMM
    Computer Simulation of Roadway Development to Support Longwall Mining

    Prefeasibility planning and cost estimation of conveyor systems has historically been undertaken by comparing fixed plant transport requirements to that of similar systems in service. This paper descr

    Dec 6, 2010

  • NIOSH
    IC 8182 Sandstone As Dimension Stone

    By Oliver Bowles

    Sandstone, a widely distributed siliceous sedimentary rock, is the third most popular building stone in the United States. It is formed by the breaking down of preexisting rocks by weathering, subsequ

    Jan 1, 1963

  • SME
    SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023

    By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell

    The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad

    Jun 13, 2023