    Calibrated Geotechnical Measurement to Provide a Quantitative Understanding of Rock Mass Conditions at the Tasmania Gold Mine, Beaconsfield, Tasmania

    Judicious placement of a range of geotechnical instruments was employed at the Tasmania gold mine, Beaconsfield, Tasmania, as a key strategy in the monitoring of rock mass conditions over the past fou

    Nov 25, 2010

  • AUSIMM
    Heavy Medium Separation at Iscor's Sishen Iron-Ore-Mine

    The Sishen iron-ore-mine produces 3 pro= ducts with size gradings of 25 to 8 mm, 11 to 5 mm and 5 to 0,2 mm and has a product capacity of 20 Mtpa. Ore is produced at an average Fe content of 66,2

    Jan 1, 1987

  • AUSIMM
    Strategies and Achievements for Moving Towards Minimum Wastes and Emissions in the Asian Steel Industry

    By D-J Min

    Strategies and achievements in the Asian steel industry to construct industrial ecological chain are reviewed largely in the case of Japan, Korea and China. Emphasis is placed on the development of re

    Jan 1, 2004

  • AUSIMM
    Caving-induced Subsidence Behaviour of Lift 1 at the Palabora Block Cave Mine

    By D P. Sainsbury, B L. Sainsbury, A Vakili, H-D Paetzold, P Lourens

    The cave propagation behaviour of a jointed rock mass is strongly governed by the unique nature of joints and discontinuities, together with the intact strength of rock bridges that make up the rock f

    May 9, 2016

  • AUSIMM
    Completion of the New Zealand Coal Resources Survey

    The Coal Resources Survey commenced in 1974 as a search for Huntly Power Station coal, but soon developed into the most detailed regional coal search programme to be instituted in New Zealand. The pro

    Jan 1, 1987

  • AUSIMM
    Walk or Talk - Is the Current Mine Approval Process in Queensland Delivering Rehabilitation and Closure Success?

    By T Baumgartl, R I. Maczkowiack, O White, P D. Erskine

    Queensland legislation, industry codes and policies relating to mine rehabilitation and closure create the expectation of successful progressive rehabilitation and that the post-mining environment is

    Jul 10, 2012

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    Brisbane Airport Link Project – Design and Construction of the 26 m Span Kedron Caverns: Comparing Monitoring Data with the Design

    By I Coombes, M Trim, Y Sun, M McRae, A Spiegl, H Lagger, A Amon, P Barraclough, M Villeneuve

    The Brisbane Airport Link Project (AirportlinkM7) includes the design and construction of more than 12.5 km of tunnels, with the Kedron interchange including four ramp tunnels that intersect with main

    Sep 17, 2014

  • AUSIMM
    An attempt towards ferrochromium production using molten oxide electrolysis

    By L Klemettinen, J Biswas, W Malan, D Sukhomlinov, D Lindberg

    In order to mitigate the effects of climate change, our society must be able to drastically reduce its CO2 emissions. As the metallurgical industry is a considerable contributor to these emissions, ne

    Jun 19, 2024

  • AUSIMM
    Sintering for emissions reduction

    By G S. Beros

    In 2019 the Chinese Ministry of Ecology and Environment issued guidelines promoting the implementation of ultra-low emissions in the iron and steelmaking industry. These guidelines aim to drive improv

    Nov 8, 2021

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    Quartz Vein Styles in Turbidite-hosted Mesothermal Gold Deposits of Western South Island (New Zealand), Victoria (Australia) and Nova Scotia (Canada)

    By P K. Smith, R J. Ryan, W R. H Ramsay, D C. Arne, F P. Bierlein

    Turbidite-hosted, mesothermal lode gold deposits in Paleozoic metasedimentary rocks of the Buller Terrane, western South Island have a similar geological history and genesis to the Paleozoic lode gold

    Jan 1, 1999

  • AUSIMM
    Grey River Gold Dredge Project

    Grey River Gold Mining Ltd commenced dredging alluvial flats in the Grey River Valley in 1989. Previous drilli

    Jan 1, 1990

  • AUSIMM
    Development of the Professional Mining Technician – Henderson’s Underground Mine Continuous Improvement Program

    By C Rizzardi, M Callahan, J Mahon

    Henderson Operation’s underground molybdenum mine has been in production since 1976. Since that historic date, more than one billion pounds of moly has been produced, and over 120 Mt of ore extracted

    May 9, 2016

  • AUSIMM
    Processing Copper-Gold Ore at Ok Tedi

    By Kanau JL, Kilgour I

    This paper describes the metallurgical processes at the 80 000tpd Ok Tedi Mining Limited concentrator, which treats copper- gold ore by single-stage crushing, SAG and ball milling and flotation to

    Jan 1, 1991

  • AUSIMM
    Technical Note - A Test and Comment on Taylor's Rule of Mine Life

    By Schaap W

    A test on Taylor's rule of mine life using published data on open pit porphyry copper mines confirmed that mine life is, on average proportional to the fourth root of reserve tonnage. Deviations

    Jan 1, 1984

  • AUSIMM
    Shotover Alluvial Gold: An Evaluation of the Genesis and Chronology of the Host Sediments

    Several glacial episodes have been distinguished in the Shotover Valley. These produced fluvioglacial aggradational deposits downvalley from the terminii, commonly with well-preserved terrace treads,

    Jan 1, 1998

  • AUSIMM
    Drill Steel Sharpening Practice at Lake View and Star Gold Mine

    The drill steel' sharpening shop, which stands adjacent to the Chaffers shaft, is built to the dimensions of 110 ft. 9 in. by 58 ft. wide, and is air conditioned in order to maintain reasonable w

    Jan 1, 1941

  • AUSIMM
    Significance of Ion Interactions in Flotation in Saline and Brine Solutions

    Significance of Ion Interactions in Flotation in Saline and Brine Solutions

    Sep 13, 2010

  • AUSIMM
    DeGrussa Copper Mine – mine closure experience

    By M Bellamy

    The DeGrussa copper deposit was discovered by Sandfire Resources in April 2009. Construction of the 1.6 Mt/a concentrator, open pit and underground mining operations commenced in March 2011 with first

    Mar 29, 2023