Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Split Rock Prospect, Chillagoe District, North Queensland

    The Split Rock low grade copper prospect was discovered in 1969 by Cyprus Mines Corporation using stream geochemistry. Cyprus "Imes carried out geochemical and geophysical investigations, geologica

    Jan 1, 1978

  • AUSIMM
    Improving Blister Tapping at Olympic Dam

    By A Campbell

    Trials of different tapping operations at Olympic Dam have been carried out with the aim of improving the safety of tapping and improving the integrity and lifetime of the taphole. This has involved t

    Jan 1, 2005

  • AUSIMM
    Development of the Burra Mine Museum

    The Barra Mine was the most significant mine of Australia's earliest mining era, which took place in South Australia between 1841 and 1851, the decade prior to discovery of gold in eastern Austra

    Jan 1, 1993

  • AUSIMM
    New Backfill Binder and Method

    By M Grossi, G Baiden

    This paper describes a new mine backfill method based on a newly invented binder with several years of test results from laboratory and onsite applications. The new binder has several advantages over

    Jan 1, 1998

  • AUSIMM
    Improving Fundamental Stockpile Management Procedures

    By Knijnikov M, Cameron D

    Coal Quality management and the control of the flow of coal through complex mining preparation and transport phases of standard mining operations has assumed greater importance over recent years.

    Jan 1, 1998

  • AUSIMM
    The Effect of Downhole Survey Uncertainty on Modelled Volume

    Downhole survey uncertainties observed at various De Beers operations prompted an investigation into their possible effect on deposit shape and volume. An accurately surveyed artificial æboreholeÆ was

    Jan 1, 2009

  • AUSIMM
    Preliminary Assessment of Sampling Techniques at Hilton Mine

    At Hilton Mine, 18 kilometres north of Mount Isa, the silver-lead-zinc sulphide bodies have undergone strong deformation in the form of folding and later faulting and brecciation in the hangingwal

    Jan 1, 1976

  • AUSIMM
    Reduction of Airborne Dust on the E48 Extraction Level at Northparkes Mines

    By C Vejrazka, A Wyllie

    A common problem faced by underground mining operations around the world is airborne dust sourced from production and auxiliary processes. In most underground mining methods, air is generally directed

    Mar 24, 2014

  • AUSIMM
    HoistEM ù A New Airborne Electromagnetic System

    HoistEM is a helicopter-towed time domain electromagnetic system. This paper presents details of the towed array structure (the Hoist) as well as a description of the instrumentation. A comparison bet

    Jan 1, 2004

  • AUSIMM
    Computer Monitoring of Environmental Conditions and Production Processes (WCC)

    By Miller RJ, Eager DT, Lama RD

    For safe and efficient mining operations, it is essential that environment and equipment status be monitored. A system that gives quick access to status at any given time, and also permits quick analy

    Jan 1, 1985

  • AUSIMM
    Minerology of some Ceramic Clays from the Adelaide Area

    By Nickson NM, Lancucki CJ

    X-ray diffraction and differential thermal methodshave been used to determine the mineralogy of some clays used by the heavy clay industry in the Adelaide area. A detailed analysis has been made of th

    Jan 1, 1963

  • AUSIMM
    Advances in Theory and Application of Non-Electric Initiation Systems to 60 Series Extraction at the Mount Lyell Copper Mine

    By Duniam P

    Sequencing of large underground firings is a critical aspect of blast performance. Using theory developed in open cut operations, where blast results are easier to quantify, a new technique for sequ

    Jan 1, 1995

  • AUSIMM
    Hydraulic Boulder Fragmentation Using Small Explosive Charges

    By P Worsey, B Lane

    The recommended maximum explosive weight for boulder blasting using internal charges is 0.15 kg/m 3 (Olofsson, 1988). Normally this charge results in excessive scattering and flyrock, creating increas

    Jan 1, 1999

  • AUSIMM
    Microstructural Changes During the Reduction of Wustite

    By Matthew SP, Hayes PC

    The product morphologies formed on the reduction of dense wustite crystals are classified into three types,A) porous iron, B) porous wustite covered with dense iron and C) dense wustite covered wi

    Jan 1, 1984

  • AUSIMM
    Ground Control Hazard Analysis in Multi-Seam Mining

    By Zhou Y, Karmis M, Haycocks C

    Hazard analysis utilizes interaction mecha- nisms in combination with geologic, structural and mining conditions to delineate areas of potential damage in seams subject to interaction. Using charac

    Jan 1, 1992

  • AUSIMM
    The Effects of A Change from Parallel to Series Grinding at Broken Hill South

    By Weller KR, Restarick CJ, Stewart PSB

    Following a detailed assessment of concen trator performance at Broken Hill South Limited which was reported in a previous paper, the fine grinding section was changed from a parallel arrangement o

    Jan 1, 1972

  • AUSIMM
    Quantifying the Advantages of Improved Performance During Supply Disturbances of AC Pulse Width Modulation Drives for Winders Compared With Earlier Technologies

    By P Warner

    Mines are often located in remote areas that are not well served by æstiffÆ power grids. Radial transmission networks, high lightning incidence (eg in South Africa the Witwatersrand experiences seven

    Jan 1, 2005

  • AUSIMM
    The Manufacture of Ferro Manganese and Alloy Steels in the Electric Furnace

    In recent years, the. art of electric steelmaking has received a great deal of attention, and naturally, much controversy has existed from time to time regarding the relative merits of different pract

    Jan 1, 1951

  • AUSIMM
    Upgrading of the Mechanical Braking System of a Large Blair Multi-Rope Rock Hoist

    By J Harmse

    This paper deals with the modernisation of the brakes on an electrically coupled Blair multi-rope hoist and covers the removal of the old calliper brakes and hydraulic control system, and its replacem

    Jan 1, 2005

  • AUSIMM
    Blasting Rock to Suit Stringent Underground Fill Requirements

    Recent analysis of backfilling material has shown that a finer size distribution is preferable for stope filling. In order to increase crusher throughput and pit productivity, a reassessment of the

    Jan 1, 1995