Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Prohibited Activities and the Resource Management Act 1991 û Does æProhibitedÆ Mean æForbiddenÆ?

    By M L. van Kampen

    The Resource Management Act 1991 provides for activities to be classified as permitted, controlled, restricted discretionary, discretionary, non-complying or prohibited in district and regional plans.

    Jan 1, 2007

  • AUSIMM
    Application of Heterogeneity Testing to Coarse Gold Ores

    By S C. Dominy, R C. A Minnitt

    Determination of the sampling constant and liberation diameter are of importance when applying the Fundamental Sampling Error (FSE) equation to optimise sampling protocols. The method for the direct d

    Aug 21, 2012

  • AUSIMM
    Recent Process Improvements at Hidden Valley Gold Mine

    By F Burns, G Peachey

    The Hidden Valley process plant has recently undertaken a program to relieve process flow bottlenecks and improve process automation. An environment of cost reduction and restrained capital necessitat

    Sep 1, 2014

  • AUSIMM
    The Merlin Molybdenum Rhenium Deposit, Mt Isa Inlier – Two Years from Discovery to Development

    By G Phillips

    The Merlin project is situated 130 km south of Cloncurry in North West Queensland, Australia. It is located within the Pre-Cambrian Mt Isa Inlier and is grouped within the Eastern Fold Belt. The host

    Aug 22, 2011

  • AUSIMM
    Phosphate-Bonded Zircon Refractories

    A study was made of zircon powders bonded with phosphoric acid or aluminium orthophosphate. The influence of strength of solution of the phosphatic binders on the modulus of rupture over a temperature

    Jan 1, 1972

  • AUSIMM
    Improvement of Blasting Productivity at Brunswick Mine

    By B Ellis

    Brunswick Mine is one of the largest underground zinc/lead mines in Canada, producing 3.4 million tones of ore annually. As mining activities advance to deeper levels, ground pressure also becomes gre

    Jan 1, 2001

  • AUSIMM
    Virtual mine geologist – who needs a real one when AI can do the job?

    By S Sullivan

    The key skills for a competent geologist are observation, documentation, analytical thought and the ability to communicate. These attributes have served the geological world for the past two centuries

    Sep 1, 2024

  • AUSIMM
    New Zealand Gold Mining: Past, Present and Future Trends

    By D J. Holden

    Prospectivity, the relative value of gold, investor confidence, general economic stability and legislation driven by public attitudes are seen as the major influences on the gold mining industry in Ne

    Jan 1, 1992

  • AUSIMM
    Greater Use of Geoscan On-belt Analysis for Process Control at Sepon Copper Operation

    By T D. Jolly, L A. Balzan, A R. Harris, Z Bauk

    "The availability of real-time data in any process control system is critical for effective management of that system. At MMG LXML Sepon Copper Operation in Lao PDR, controlling the copper grade of th

    Oct 10, 2016

  • AUSIMM
    Risk and Alternate Dispute Resolution Options for Mining Companies Operating in South East Asia (Including a Case Study)

    By K Broadley

    Risk and dispute resolution are linked. Dispute resolution techniques are brought to bear on a dispute - which is an outcome of a risk being wholly or partially realised. There has been an increasing

    Jan 1, 1999

  • AUSIMM
    In situ Stress Measurement Using Acoustic Emission from Cored Rock

    By G Baird, M Seto

    Reliable evaluation of in situ stress is an important phase in the analysis and design of underground excavations, particularly for evaluating the stability of underground structures to prevent failur

    Jan 1, 2002

  • AUSIMM
    Lack of Alignment between Regulation of Surface Water Management in Coal Mining and Coal Seam Gas

    By E Coffison, M Gibbs, C Bennett

    The sustainable management of surface water associated with coal mining and coal seam gas projects is a considerable factor affecting the global competitiveness of these resource companies operating i

    Nov 26, 2013

  • AUSIMM
    Transforming dust control – lessons from tunnelling

    By A De, B Palmer, rade, P Stowasser, A Fanning

    Mining and tunnelling share many commonalities (eg confined working environments, excavation equipment and processes), but of significance is an overarching commitment to provide safe work conditions

    Apr 16, 2024

  • AUSIMM
    Robust flexibility – a methodology for agile systems engineering in mining

    By D Brown, Z Tabor

    Projects must be flexible to account for the rapid development of new technologies and changing stakeholder expectations. Coupled with calls for bleeding-edge solutions, customers, shareholders, and r

    Sep 1, 2024

  • AUSIMM
    Comprehensive Models of In-Situ and Dump Leaching

    By Beavis FC, Box JC

    The important chemical and fluid flow phenomena in heap, dump and in situ leaching are summarised. Published, quantitative models of these processes are critically reviewed, and their potential app

    Jan 1, 1981

  • AUSIMM
    Notes on the Metallurgical Design of Tungsten-Carbide Rock Bits

    A comparatively new and very promIsmg field for applying cemented tungsten-carbides is in the mining and quarrying industries. The economic advantages of this unique engineering material over the conv

    Jan 1, 1950

  • AUSIMM
    The Colorimetric Determination of Thorium in Soils, Sediments, and Rocks

    Samples weighing 0·5 g are decomposed with hydrofluoric and other acids. Most elements are extracted ftom the acid, aqueous solution by Alamine 336 (tricaprylyl tertiary amine) and thorium is det

    Jan 1, 1971

  • AUSIMM
    Large Excavations in Weak Mudstone for the Porgera Mine Plant Development

    The plant and processing site at Porgera has been built on a levelled mudstone ridge about lkm E of the mine. Excavation of 7xl06m3 of soil and rock was necessary to achieve the required area. The

    Jan 1, 1991

  • AUSIMM
    Buzwagi Open Pit Study

    By M Sebbag, T Taimre

    Barrick Gold Corporation is proceeding with development of the Buzwagi Mine in the Lake Victoria Greenstone Belt District of Tanzania. The Buzwagi orebody occurs in the Nzega Shear zone within the Gre

    Jan 1, 2007

  • AUSIMM
    How Robust Are Your Asset Integrity Management Processes?

    By R Cannings, J Wallace, M McCamley

    The mining industry continues to have major disasters (Bingham Canyon, Pike River, Upper Big Branch, Mount Polley and Samarco), which often have a devastating effect on the enterprise, in terms of per

    Jun 22, 2016