Design of Hydraulic Backfill Distribution Systems - Lessons From Case StudiesBy D Gericke, R Cooke
This paper presents an assessment of the status in design and operation of deep level backfill distribution systems by referring to case studies and practical experience. The improvements in design an
Jan 1, 1998
-
Expansion at Mt. Leyshon to Treat 2.0 MTPA Primary OreThe process selection and design aspects to treat primary ore in a new carbon-in-pulp (C.I.P.) plant while utilizing, where possible, existing equipment and infra- structure are discussed. The exis
Jan 1, 1989
-
Urban Tunnelling Challenges - Mechanised Tunnelling to Improve Life Quality in CitiesBy U Rehm
The biggest hard rock double-shield tunnel boring machine (TBM) in the world, with a diameter of 12.4 m, is currently excavating the North-South Bypass, which includes a crossing under the Brisbane Ri
Jan 1, 2008
-
Rare-Earth Element Analysis of Hydrothermal Scheelite from Mineralised Fault-Veins in the Glenorchy Region, NW OtagoBy J M. Palin
Hydrothermal scheelite precipitated in fault-veins at Paradise, Bonnie Jean, Davidson's and Glenorchy mines display chemical variability involving REE patterns that are transitional between two e
Jan 1, 2003
-
Heap LeachingThe preferred alternatives in heap design and their motivation are identified as- -normal heap leaching, to be generally applied wherever possible, - flooded vat leaching, to be appliedwhere wetted or
Jan 1, 1984
-
The Solvent Extraction - Electrowinning Recovery of Zinc from Eskay Creek Pressure Oxidation Solutions Using Cyanex 302 ExtractantBy West-Sells P, King J. A, Patel C
The Eskay Creek orebody is located in north-central British Columbia (Canada). The ore contains major gold and silver values and minor but economically significant quantities of zinc. The refractory
Jan 1, 1993
-
Presidential Address The Hauraki Goldfields N.Z.YOUR Excellency, Fellow Members of the Australasian Institute Of Mining Engineers and Gentlemen:- Nearly a decade has passed, since our Institute first met in New Zealand. May I, at the very outset of
Jan 1, 1911
-
Assessment of Rock Damage During 145 Tonne Blast at MochiaBy Agrawal A, Joshi A
Mochia mine, in culmination of depillaring operations, fired India's largest underground pillar blast consuming 145 tonnes of explosive and yielding 0.55 million tonnes of ore in June 1994. To
Jan 1, 1995
-
Hydrocarbon Occurrences Offshore From the Pilbara BlockDuring the past 18 months several import- ant hydrocarbon discoveries have been made in the Dampier Sub-basin, which is a sedimentary area lying entirely offshore from the Precambrian Pilbara Block
Jan 1, 1973
-
Pemali Open Pit Mine Slope Stability ProblemBy Bhattacharyya A. K>
The Pemali Open Pit Mine is situated in a small island called Bangka in Indonesia. It produces approximately 165,000 m3/year of tin ore with an average grade of 3.67 kg/m' of tin from a primary
Jan 1, 1989
-
Grade Control Sampling Quality Assurance/Quality Control in a High-Grade Gold Mine - Gosowong, IndonesiaBy K Steamy, D Lesmana, K Yulia
Effective selective mining relies heavily on high quality geological data and assay data. Such assay data is dependent on effective sampling protocols, sample preparation techniques, assaying practice
Jan 1, 2009
-
Improving Colliery Performance Through One Big Team, Many Teams or.......???A cry that is often heard from front-line employees, particularly as a mine grows or circumstances change is "We used to be one big team but now they have set up teams for different functions - we don
Jan 1, 1998
-
Design of Steel Fibre Reinforced Segmental Lining for the Gold Coast Desalination TunnelsBy M Chappell
This paper describes the design of the steel fibre reinforced precast concrete (SFRC) segmental lining for the intake and discharge tunnels for the Gold Coast desalination plant in Queensland. In addi
Jan 1, 2008
-
Implications of High Productivity Long Wall SystemsThe areas of impact when employing high productivity long wall systems are reviewed and the financial implications of the most significant areas highlighted. A distinction has been made between av
Jan 1, 1988
-
Raise Bored Shafts in Decline MinesWestern Mining Corporation (WMC), managers of the Windarra Nickel Project, installed a raise-bored haulage shaft and underground crushing system at the Mt Windarra Nickel Mine in 1982. The system is t
Jan 1, 1984
-
Seam Gases in Major Australian CoalfieldsThe major coalfields of Australia are almost unique in the occurrence in some areas of CO partly or almost completely replacing CH4,t1e normal seam gas from metamorphism of coal due to time and de
Jan 1, 1986
-
Blue Mountains Sewage Transfer Scheme - A Review of TunnellingBy McQueen LB
The Water Board has been involved in the development and ipgrading of sewerage facilities in the Blue Mountains since 1980. In 1984 the Board prepared a report that dealt with the Blue Mountains Sewag
Jan 1, 1993
-
Application of a Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model for Subsidence PredictionBy Chugh Y. P
A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the
Jan 1, 1992
-
Geochemical Prospecting in Papua-New Guinea - Case HistoriesThe highland region of Papua-New Guinea is relatively rugged terrain where stream gradients are steep. In areas where porphyry copper deposits outcrop the streams commonly expose primary sulphide m
Jan 1, 1973
-
Flotation Characterisation of Iron OresBy Hinkley JT, Smitham JB, Nicol SK
Historical investigations of mineral flotation have highlighted the many factors which affect flotation. Some of these are related to the mineral, its degree of liberation (however defined), solutio
Jan 1, 1993