Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Separation of Chalcopyrite and Pentlandit from Inco's Sudbury Area Ores Pilot Plant Testwork

    By G. E. Agar, W. B. Kipkie, R. A. Tenbergen

    "This paper describes the successful pilot plant testing of a flowsheet, developed at INCO Ltd.'s J.Roy Gordon Research Laboratory (JRGRL), for improved separation of the constituent minerals in a bul

    Jan 1, 1984

  • CIM
    Respect for employees: Clarifying expectations and authorities

    "One of the corporate values mentioned by many companies deals with respect for people. This paper discusses one aspect of this value, namely, the need for clarity of accountabilities and authorities.

    Jan 1, 1999

  • CIM
    Observations and Numerical Back Analysis of an Excavation in the Queenston Mudstone

    By M. A. Perras, M. S. Diederichs

    "The Niagara Tunnel Project (NTP) is a 10.1 km long water-diversion tunnel in Niagara Falls, Ontario, which was excavated by a 14.4 m diameter tunnel boring machine. The excavated rock types included

    Jan 1, 2015

  • CIM
    Platinum and Rhenium Recovery from Reforming Catalysts via Plasma Arc Technology

    By D. E. Deegan, P. M. Keeley, N. A. Rowson, T. Stachowski

    An investigation into the use of Tetronics International’s thermal plasma technology based pyrometallurgical smelting process for the recovery of both platinum and rhenium was conducted. 1000 kg of Pt

    Jan 1, 2015

  • CIM
    Crushing, Grinding and Concentrating

    By David Runnels

    The Mount Wright iron are mine and upgrading plant were brought on line in the fall of 1975. The mine is located near the Quebec - Labrador border some six hundred miles northeast of Montreal. This pa

    Jan 1, 1977

  • CIM
    Welcome to Newfoundland

    By Robert B. Parsons

    "The Canadian mining industry is not off to a good start in the 1993/94 budget season. Of the five provinces and territories to table budgets as of March 31, 1993, the industry's scorecard shows:

    Jan 1, 1993

  • CIM
    A Method of Determining Recoverable Iron in Mixed Magnetite-Hematite Orebodies

    By P. E. Cavanagh

    "The Davis tube test has been used for many years as a laboratory method for determining the magnetic iron re-coverable from a magnetite iron orebody. This paper de-scribes a method for determining th

    Jan 1, 1968

  • CIM
    Aspects of Operational Mine Safety Assurance at the 4 South Mine, Quinsam Coal Mining Operation

    By Paul Krivokuca

    Outline Quinsam Coal Mine ?? Location ?? Mine History ?? Safety ?? Production ?? Hiring 4S Mine ?? Depillaring design ?? Structural mapping, Risk assessment ?? Rock Bolt Design Selection ??

    May 1, 2008

  • CIM
    The “Mill Redesign Project” at Inco’s Clarabelle Mill

    By G. Labonté, J. Truskoski, A. Kerr, A. Bouchard, J. Barrett

    "Improving mill grade recovery relationships is always good business. Inco’s Clarabelle mill has just undergone a $16 M process upgrade that was designed to improve nickel recovery by 2%. The “Mill Re

    Jan 1, 2003

  • CIM
    Diggability of plains overburden with bucketwheel excavators

    By A. M. Krzanowski, T. S. Golosinski

    "This paper presents results of a study undertaken to determinethe feasibility of mining plains overburdens with bucket wheel excavators. Based on extensive geotechnical testing of overburdens under s

    Jan 1, 1987

  • CIM
    The Effects of Thermal History on Mine Climate Simulation Results

    By G. Danko, C. Lu

    "High temperature and humidity at the working negatively affect safety and health in deep and hot underground mines. It is necessary to predict during design the dynamic changes in temperature with he

    Jan 1, 2019

  • CIM
    Surface mine fan installations at INCO Limited

    By Jozef S. Stachula

    "INCO Limited operates eleven under-ground mines in the Sudbury area. The mines are located on the rim of the Sudbury Basin, an oval with the axis in the range of 27 km and 60 km. The ore dips to at l

    Jan 1, 1996

  • CIM
    A novel approach to enclosed gear lubrication on board mining equipment

    By Shek N. Lau, Nicola Samman

    "Enclosed gear cases on board heavy mining equipment have traditionally been lubricated with regular heavy duty gear oils. However, equipment manufacturers, have recommended the use of an ISO-1000 gea

    Jan 1, 1996

  • CIM
    Geostatistical Simulation of Optimum Mining Elevations for Nickel Laterite Deposits

    By J. A. McLennan

    Nickel laterite deposits are typically formed from tropically weathered mafic-ultramafic complexes. The resulting nickel concentration is found within soil horizons and is mineable with regular dozer

    Apr 1, 2005

  • CIM
    In-track assessment of premium and intermediate grade rail steels

    By K. J. Griffin, G. W. Rosval

    "In our increasingly competitive market, attempts to improve productivity by increasing axle loads have placed more severe demands on rails. CP Rail thus requires stronger, tougher, and more wear-resi

    Jan 1, 1988

  • CIM
    Modelling Secondary Crushing Plants for Teaching Purposes and Operator Training

    By J. A. Meech, R. J. Tucker

    "A dynamic computer model has been developed to simulate the operation of ore crushing plants. The model was created in a general form to allow imitation of a wide variety of secondary crushing circui

    Jan 1, 1985

  • CIM
    The Effect of Grinding Media Performance on Milling and Operation Behaviour

    By Don Langlois, Udo Weber

    "The effect of grinding media performance on milling and operational behaviour was demonstrated under different selected milling conditions of calcium carbonate. A variety of grinding media material a

    Jan 1, 2009

  • CIM
    Low-temperature Mineralization of the sub-Triassic Unconformity Surface and Alteration of the Underlying Intrusions of Southern Leicestershire, England

    By C. A. Jeffrey, K. Pearson

    Abstract - The Croft diorite in central England belongs to a suite of Caledonian igneous rocks collectively known as the South Leicestershire diorite complex. Although the intrusions occupy separate o

    Jan 1, 1997

  • CIM
    On the Role of Bubble Size in Column Flotation

    By Jose R. Hernandez-Aguilar

    "Three models to predict the effect of bubble size (Db) on metallurgical response were tested in a pilot-scale flotation column at Teck Highland Valley Copper mine. The column was fed with slurry coll

    Jan 1, 2011

  • CIM
    Low-temperature Mineralization of the sub-Triassic Unconformity Surface and Alteration of the Underlying Intrusions of Southern Leicestershire, England (9bc68e68-fd4f-4372-98ae-17c227289524)

    By C. A. Jeffrey, K. Pearson

    The Croft diorite in central England belongs to a suite of Caledonian igneous rocks collectively known as the South Leicestershire diorite complex. Although the intrusions occupy separate outcrops, th

    Jan 1, 1997