Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Ecstall Story: The Transition from Pit to Underground

    By Peter N. Blakey, Jean-Paul Paquette, Barton A. Thomson

    "FROM THE BEGINNING OF THE PIT, it was known that the surface mining method had a projected life of about ten years, and that the ore extended to depths recoverable only by underground mining. When se

    Jan 1, 1974

  • CIM
    Geomechanical Study of Fractured Carbonate Reservoir –Part I, Rock Testing Data

    By M. Hozayen, E. S. Radwan, P. A. Nawrocki, A. Jebbouri

    "A major geomechanical study was conducted for one of the UAE onshore oil fields with the purpose of studying reservoir rock properties and stress distribution, based on which a 3D coupled reservoir g

    Jan 1, 2015

  • CIM
    Recycling of Metal-Coated Plastic-Parts from End-Of-Life-Vehicles with Biotechnological Methods

    By F. Logsch, H. Pempel, J. Markowski, P. Ay

    "Due to the European Directive 2000/53/EC on end-of-life-vehicles, from 2015 on more than 95% of car materials have to be recycled. In order to recycle the materials back into the economic cycle, it i

    Jan 1, 2016

  • CIM
    Meeting the Global Challenge

    By Jean Vavrek

    What is CIM?s role on a planet-wide scale? That question has been coming back to the forefront of many discussions regularly in the months since we came on board as Executive Director and Vice-Preside

    Feb 1, 2004

  • CIM
    Hydrogen Mitigation In The Mcclean Lake Uranium Leaching Circuit– An Update

    By W. McCombe, G. Remple, L. Nightingale-Mercer

    The McClean Lake Mill is located approximately 850 kilometres north of Saskatoon, Saskatchewan, Canada, and is operated by Orano Canada Inc. (Orano). The mill was designed to process high grade uraniu

    Jan 1, 2020

  • CIM
    High Productivity Zinc Electrowinning Plant

    By M. L. Connolly

    Zinc production by Cominco Ltd. began in Trail in 1916 at a rate of 55 metric tonnes per day (t/d) and was increased ,in several increments until now electrowinning capacity approaches 750 t/d. The la

    Jan 1, 1977

  • CIM
    Observation of Wash Water Effect on Particle Motion in a Spiral Concentrator by Positron Emission Particle Tracking

    By Darryel Boucher, Thomas W. Leadbeater, Raymond Langlois, Joshua Sovechles, McGill University, Zhoutong Deng

    "Spiral concentrators are used to upgrade ore based on the density difference between their component minerals. This simple flowing film gravity separator is of interest for the processing of large am

    Jan 1, 2016

  • CIM
    Risk Assessment Applied to Excavation Ground Support

    By William Pitman

    Ground instability and subsequent rock falls are a major concern in underground mines. As a result, several mining companies are conducting risk assessments of the ground support installed in their mi

    May 1, 2004

  • CIM
    Mine Conveyance Safety Dogs

    By A. B. C. Stothart

    "IntroductionIn the past four years Ontario Mines have made great progress in the development of reliable mine conveyance safety dogs. History shows that, prior to 1945, a rope failure on a descending

    Jan 1, 1950

  • CIM
    Corporate Social Responsibility:Kidnap as an Enterprise Solution

    CORPORATE SOCIAL RESPONSIBILITY CSR is about how companies manage the business processes to produce an overall positive impact on society. - Indentured work, sexual slavery, fair trade, organic grow

    May 1, 2010

  • CIM
    An Initial Investigation into the Effect of Fe (III) Concentration on the Product Characteristics of Fe (III) Oxyhydroxide Precipitates during Lime Precipitation

    By Jochen Petersen, Alison Lewis, Cledwyn Mangunda

    Run-off and waste water streams high in dissolved metal content are generated in all mining operations. The metals pose a threat to life due to their persistent bio-accumulative toxic (PBT) characteri

    Jan 1, 2016

  • CIM
    Toughness: Its Measurement and Relevance for Pipelines

    By W. R. Tyson

    Pipelines for the transport of gas and oil are being designed to operate at increasing pressures in increasingly harsh environments. The steel used to construct these pipelines must have adequate toug

    Jan 1, 2005

  • CIM
    Using hydraulic excavators to mine variably dipping coal seams

    By Ross G. Bertinshaw

    "The Line Creek Mine of Crows Nest Resources started mining coal in the fall of 1981. There are seven mineable seams with thicknesses ranging from 1.5 to 13 metres and with dips varying from 0 degrees

    Jan 1, 1985

  • CIM
    Effects of Uniform Direct Chill Casting Process on Structure of 7055 Alloy Billet

    By C. S. Chen, Y. J. Luo, M. W. Gao, B. Li, Z. F. Zhang

    "To obtain large-sized billets with fine grains and homogeneous elements distribution, uniform direct chill (UDC) casting process, based on annular electromagnetic stirring coupling with intercooling,

    Jan 1, 2018

  • CIM
    A Model to Predict Wear Rate of Shell Liners in Tumbling Mills - The Sarcheshmeh Copper Complex and the Gol-E-Gohar Iron Ore Company Sag Mill Cases

    By Z. Bibak, S. Banisi, A. Ghasemi, E. Nematollahi

    "The use of large AG/SAG mills in the mineral industry has been on the rise recently due to a significant reduction in the capital and operating costs for achieving significant increases in plant thro

    Jan 1, 2016

  • CIM
    The Mount Polley alkalic porphyry copper-gold deposit, south-central British Columbia

    By D. Gorc, T. M. Fraser, Z. T. Nikic, R. Pesalj

    "Mount Polley is an alkalic porphyry copper-gold deposit of Lower Jurassic age within the Quesnel terrane in south-central British Columbia. The silica-saturated Mount Polley intmsive complex is assum

    Jan 1, 1995

  • CIM
    On-Line Gas and Solids Holdup Estimation in Solid-Liquid-Gas Systems

    By S. Banisi, J. A. Finch, A. R. Laplante

    "A technique for on-line simultaneous estimation of gas and solids holdup (volume fraction), based on a combination of conductivity and pressure difference measurements, is proposed and tested in a la

    Jan 1, 1994

  • CIM
    Coal Reclamation from the Summit Mine Dump (Paper No. 13 )

    "Background:The recorded coal production in Nova Scotia from 1863 to 1980 was 390, 000, 000 short tons. This extraction was associated with an estimated 60,000,000 short tons of discarded material. Th

    Jan 1, 1983

  • CIM
    Lender?s Perspective on Financing: Back to the Future!

    By Jeff Stufsky

    Debt Financing ?Broad Market Overview ? Recovering due to factors including: ? Increased trust in the system ? Enhanced capitalization of financial institutions ? The need to deploy capital for

    May 1, 2010

  • CIM
    Shot off the Solid: technological advances in nineteenth century Vancouver Island coal mining fail to prevent a coal dust explosion

    By Lynne Bowen

    "On the da y shift in Number One Mine at Nanaimo on Vancouver Island, on May 3, 1887, William Griffiths, a coal miner with many years experience, fired a shot to advance the face of the crosscut. A fl

    Jan 1, 1992