Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Tile catenary idler as a means of energy absorption and spillage prevention

    By Douglas G. Jay

    "Transfer points on belt conveyors have long been a source of problems for both designers and users. Conveyors are generally given a low priority in new equipment layout, thus designers are often forc

    Jan 1, 1982

  • CIM
    Is Bigger Still Better? Considerations in Increasing the Size Of Haulage Equipment

    By M. Dotto, T. G. Joseph, M. Curley

    "Equipment selection is a key decision in mine planning. Equipment size affects decisions from pit size to the total operation cost. Particularly when replacing haulage fleets for long-life surface mi

    Jan 1, 2019

  • CIM
    Productivity improvements for dragline operations using controlled blasting in a single- and multiple-seam opencast coal operation at Rietspruit, South Africa

    By W. A. Crosby, W. K. Smith, K. L. McDonald

    "IntroductionThis paper describes how the introduction of two blasting techniques and the resuItant development of new dragline digging methods have increased the productivity of single- and double-se

    Jan 1, 1983

  • CIM
    Waste Rock Dump Closures in Cold Climates - Selection Processes and Implemented Method

    By Michel Noël

    This paper presents a partial compilation of adopted measures of waste rock dump closures at mine sites located in Canada and Alaska, where the climate includes cold winters. The paper also presents t

    Nov 1, 2008

  • CIM
    The guide to the evaluation of gold deposits: Integrating deposit evaluation and reserve inventory practices (34faf259-b4ae-4451-8b9d-98da22422cac)

    By H. K. Taylor

    "As a mining engineer with over 50 years' experience in underground operations and mine planning, I appreciate the enormous amount of work that went into the paper; and despite an imbalance betwe

    Jan 1, 1992

  • CIM
    Chuquicamata: Quality Challenges throughout 100 Years of Copper Electrorefining and Electrowinning

    By J. C. Salas, A. Weishaupt, J. A. Guzman

    The origins of the electrorefining process date back to 1869, when the first ER cathodes were produced at Pembrey, South Wales. By the time that Pembrey was closing, Chuquicamata tank house was under

    Jan 1, 2019

  • CIM
    Light Weighting the Automotive Industry the Road to 2025 CAFÉ

    By G. S. Cole

    By 2025, the U.S. automotive industry will have to average 54.5 mpg (4.3l/100km) Corporate Average Fuel Economy (CAFÉ). While new/improved powertrain technology (turbocharging, electrification, diesel

    Jan 1, 2016

  • CIM
    Les Mines Selbaie Story Organization of administrative and technical services

    By R. C. Bryce

    "Accident prevention has been an on-going priorty for five years. In 1987, adherence to the ILCI five-star rating loss control program was started, and a first star was awarded. Extensive training pro

    Jan 1, 1990

  • CIM
    Toward an inventory of aggregate resources in Newfoundland and Labrador

    By R. Ricketts, D. G. Vanderveer, F. Kirby

    "A program of mapping, sampling and testing to determine the potential of the aggregate resources throughout Newfoundland and Labrador was commenced in 1978. A 6-km-wide corridor parallel to all trans

    Jan 1, 1982

  • CIM
    Design and construction of the Montana Tunnels tailings disposal facility

    By K. J. Brouwer, J. P. Haile

    "Construction of the first stage of the tailings disposal facility for the Montana Tunnels Project was completed in October 1986. The project is located 37 km south of Helena, Montana, and involves mi

    Jan 1, 1988

  • CIM
    Physical and chemical characterization of Athabasca tar sands fly ash

    By D. R. Spink, G. L. Rempel, C. O. Gomez Bueno

    "A morphological and chemical study of the Great Canadian Oil Sands Ltd. (GCOS) fly ash has been carried out. Extensive scanning electron microscopy, as well as light microscopy, showed that the GCOS

    Jan 1, 1980

  • CIM
    Aspects and considerations of licensing patents in the metallurgical industry

    By S. Zador

    "IntroductionIn the past decade, metallurgical and mining companies have shown an increased interest in the licensing of technology. When licensing technology, it is usually to the benefit of the part

    Jan 1, 1991

  • CIM
    Treatment of Complex Feeds at Noranda Copper Smelting and Refining

    By Peter Godbehere, Christian Desroches, Viken Baboudjian

    "Noranda Copper Smelting and Refining is a unit of Noranda Metallurgy Inc., comprising the Home smelter in Rouyn-Noranda, Quebec and the C.C.R. Refinery in Montreal East. The Home smelter provides cus

    Jan 1, 1995

  • CIM
    Campaign Life Extension and Refractory Management of Copper Making Furnaces

    By T. Gonzales, M. Maleki, M. Caçador, B. Climenhaga, H. Ghorbani

    The campaign life of furnaces in the copper making industry is greatly affected by damage caused by normal operation cycling and abnormal conditions. Proper monitoring and assessment of the existing c

    Jan 1, 2019

  • CIM
    Selenium and Molybdenum Removal from Key Lake Mill Process Effluent

    By Arthur Lieu

    Outline Removal mechanisms of Se and Mo in the Key Lake Bulk Neutralization circuit Bulk circuit Detail process modification in the Key Lake BN circuit Process performance after commissioning Ob

    Nov 1, 2011

  • CIM
    Consolidated rockfill design and quality control at Kidd Creek Mines

    By P. Farsangi, A. Hara

    "Kidd Creek Mines places approximately 10 000 tonnes of consolidated rockfill on a daily basis. Consolidated rockfill is comprised of sized aggregate mixed with different ratio and amounts of binders.

    Jan 1, 1993

  • CIM
    The Flooding of the Cominco Potash Mine and its Rehabilitation

    By Fritz F. Prugger

    In August, 1970, during routine shaft grouting, a major water source was intersected. Water and quicksand under very high pressure entered the shaft at a rate of 65 m3 per minute. The mine and both sh

    Jan 1, 1979

  • CIM
    Comminution and Metallurgical Testwork Program Approach for Successful Project Design

    By R. Esteban, D. Runnels, S. Girgin, J. Torrealba-Vargas

    "Each mineral processing project requires early testwork to evaluate the economic potential of a deposit. The testwork needs to be efficient and it should provide enough information to obtain key para

    Jan 1, 2016

  • CIM
    In-mould electromagnetic stirring-cast billet and bar product quality

    By G. C. Weatherly, L Beitelman, M Gray, M. W. Bates, R Hadden

    "A program of evaluation of in-mould electromagnetic stirring on the product of a straight-mould, billet continuous casting machine has been carried out. The effects on macrostructure, surface and int

    Jan 1, 1982

  • CIM
    Undergronnd ore handling and hoisting system at the Williams Mine

    By Henry Smith, Stu Brown

    "The Williams Mine is Canada's largest gold producer, with annual production of some 500 000 ounces of gold from two million tonnes of ore. Highly mechanized and automated underground mining prac

    Jan 1, 1991