Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A new approach to 7/8-in. Tapered drilling equipment at Madawaska

    By R. M. Giegerich

    "This paper begins with a brief history of Madawaska Mines, a brief description of the geology, mining methods and equipment, and the historical development of 7/8-in. tapered drilling equipment. It t

    Jan 1, 1982

  • CIM
    Frother Structure-Property Relationship: Effect of Polypropylene Glycol Alkyl Ethers on Bubble Rise Velocity

    By James A. Finch, Yue Hua Tan, Wei Zhang

    "The paper is part of our study of the frother structure-property relationship using bubble rise velocity. Single bubble rise velocity profiles were determined in a 350 cm column for surfactants from

    Jan 1, 2016

  • CIM
    Novel Quality Control Methodologies to Assess Semi-Solid Aluminum Produced with the Seed Process

    By Z. Zhang, D. Bouchard, H. Blanchette, A. Lemieux

    This paper describes quality control methodologies for the production of semisolid A356 aluminum slugs with the SEED process. A methodology based on destructive tests carried out with an apparatus mea

    Jan 1, 2006

  • CIM
    The effects of geological features on coal mining, Sydney coalfield, Nova Scotia

    By Steve Forgeron, Brendan MacKenzie, Kevin MacPherson

    "The geological composition of strata immediately adjacent to coal seams has a significant effect on the safe and efficient extraction of coal from underground mines of the Sydney coalfield. Geologica

    Jan 1, 1986

  • CIM
    Till Prospecting for Sulphide Ores in the Abitibi Clay Belt of Ontario

    By I. S. Thompson

    A program of geochemical till prospecting, carried out by Derry, Michener & Booth in 1974, was instrumental in t~ e discovery of a copper deposit in Currie Township, Ontario, beneath thick lacustrine

    Jan 1, 1979

  • CIM
    Fording Coal Limited silo explosion

    By D. A. Stokes

    "In October of 1980, Fording's 15 000-ton capacity clean coal silo was put into operation. The silo was unique in that it was designed to allow the mass flow of material, coupled with a sophistic

    Jan 1, 1986

  • CIM
    Geological engineering aspects of the conceptual design of a radioactive waste vault in hard crystalline rock

    By M. A. Mahtab, A. S. Burgess, R. G. Charlwood, P. O. Sandstrom, J. L. Ratigan

    "Addressing a current operating and environmental concern, this paper first presents an overview of the design program for an underground radioactive waste storage vault. It then reviews the construct

    Jan 1, 1980

  • CIM
    Optimizing Stope Sequence in a Diminishing Ore Pillar: A Case Study

    By Shahé Shnorhokian

    Numerical modeling is increasingly being used as a tool to examine complex geomechanical issues related to rockmass behaviour and stability of underground openings. The in-situ stress regime and the e

    Aug 1, 2013

  • CIM
    Shaft extension design at the Underground Research Laboratory, Pinawa, Manitoba

    By J. R. Morris, A. E. Ball, G. W. Kuzyk

    "AECL Research has constructed an underground laboratory for the research and development required for the Canadian Nuclear Fuel Waste Management Program. The experimental program in the laboratory wi

    Jan 1, 1991

  • CIM
    Protective instrumentation for large grinding mill trunnion bearings

    By R. L. Guerguerian, Eugene Bercel

    "Grinding mill hydrostatic trunnion bearings require an external pumping source to provide and maintain the oil film between the bearing members. In order to guarantee a predetermined minimum film thi

    Jan 1, 1981

  • CIM
    Influence of various parameters on underground accidents: a multifactorial approach in Quebec mines

    By Marcel Laflamme, N. R. Rillette

    "In 1982, a study was initiated to investigate relationships between bonus and accidents in Quebec underground mines. In 1983, the study was expanded to include the impact of age and experience on acc

    Jan 1, 1989

  • CIM
    Boiler tube failure mechanism recognition an expert system

    By P. Mayer

    "Determining the correct mechanism of a boiler tube failure is important for the prevention of future tube failures. Proper corrective measures can be undertaken to alleviate the root cause or causes

    Jan 1, 1990

  • CIM
    Magnetic Separation of Fine Gangue Minerals from Magnesite as Hydrophobic Co-Agglomerates

    By G. Bimpilas, G. N. Anastassakis

    "Today, one of the most intense problems in mineral processing systems is referred to the treatment of fine (–100 µm), and even smaller size, particles. Fine mineral particles possess specific propert

    Jan 1, 2016

  • CIM
    Scale model study of a borehole pulse electromagnetic system

    By Dennis V. Woods, J. Duncan Crone

    "In order to determine its capabilities and to aid in the interpretation of fie ld results, a scale model study and field tests were carried out on the Crone borehole pulse electromagnetic (PEM) syste

    Jan 1, 1980

  • CIM
    Study on Methodology for Detecting the Status of General Excavator without Renovation

    By Min-Sung Kang

    Excavation and earthmoving equipment mostly operate in accident-prone areas. These areas normally have rollover, confinement, and fall or may be considered harmful work areas due to demolitions and se

    Aug 1, 2013

  • CIM
    The Long-Term Stability of the Iron (III)-Arsenate Coprecipitate: Effects of the Transformation of 2-Line Ferrihydrite on the Immobilization of Arsenate

    By Yongfeng Jia, Shaofeng Wang, Danni Zhang

    Arsenic in mineral processing solutions and effluents is commonly removed and immobilized via iron(III)-arsenatecoprecipitation. The effect of re-crystallization of 2-line ferrihydrite on the long-ter

    Jan 1, 2014

  • CIM
    The Aqueous Oxidation of Pyrite

    By James Stenhouse

    Abstract The aqueous oxidation of pyrite in caustic solutions under oxygen pressure was investigated by measuring that effect of reaction variable on oxygen consumption by the reactions. From the res

    Jan 1, 1952

  • CIM
    Preliminary evaluation of the methane production potential of coal seants at Greenltills Mine, Elkford, British Columbia

    By R. Augsten, K. K. Feng, K. C. Cheng

    "Methane emission and the desorption characteristics of vertical borehole coal samples of Greenhills multiple seams in the vicinity of Elkford, British Columbia were investigated. Three vertical boreh

    Jan 1, 1984

  • CIM
    Interactive computer modelling of draglines

    By P. W. Udo Graefe

    "An interactive computer model of a dragline, windrow and spoil pile has been developed for modelling oil sands mining operations. The model is to be used in conj unction with models of other oil sand

    Jan 1, 1982

  • CIM
    Effects of the Melt Thermal Treatment Process on the Tensile Properties of 356 Type-Alloys

    The tensile test results of as-cast A356.2 grain-refined alloy castings show that the tensile strength can be improved by strontium modification (`SrM'), superheating at 900°C OM, and melt therma

    Jan 1, 2011