Foundation Construction Challenges At 100 11th Avenue In Manhattan - Secant Pile WallBy Andrew Cushing
This paper presents the design and construction of the foundation for a major high-rise real estate development on the west side of Manhattan. Arup was retained by Underpinning and Foundation Skanska
Jan 1, 2008
-
Construction Of Large Open Caissons In Soft StratumBy Chen Zhiquan
Author has exhaustively researched into soft ground through construction of a large open caisson on soft ground (muck) which weighs more than 4, 000 tons. To avoid any contingency during construction,
Jan 1, 1991
-
Piled Rafts In Geotechnical Practice - An International PerspectiveBy Michael W. Neill, O&apos
The performance of foundations that combine the high bearing capacity of rafts (mats) with the settlement reduction capability of piles is described through a summary of 24 case histories. Structures
Jan 1, 2003
-
Load Tests on Large Diameter Bored Piles in Cemented Sands (e34a0a63-0fa5-40f6-8850-5a2442305f1f)By Nabil F. Ismael
"Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait. T
Jan 1, 2017
-
Driven Piles Hollow Concrete Spun Piles – The Brazilian Experience"Premissas BásicasCaracterísticas do concreto centrifugado(Spun concrete characteristics)Aplicação em obras de engenharia de fundações(Application engineering works foundations)Logística de fabricação
Jan 1, 2015
-
Load Tests On Large Diameter Bored Piles In Cemented SandsBy Nabil F. Ismael
Load tests were carried out to examine the ultimate bearing capacity of short, large diameter bored piles in connection with the construction of a multistory building on the Arabian Gulf in Kuwait.
-
Full-Scale Tests To Evaluate Lateral Pile Resistance At The Edge Of A SlopeBy Artak D. Mirzoyan
Pile foundations near the edge of a slope are often required to resist lateral loads. This is particularly important for piles at abutments of bridges. However, very few full-scale tests are availab
Jan 1, 2007
-
Woodrow Wilson Bridge CofferdamsBy Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2005
-
Design Of Bored Piles In Chalk At The New Medway Crossing Based On Instrumented Load TestsBy David J. Puller
As part of the value engineering process on a major Design Build highway project, instrumented trial pile load tests were used to achieve savings in cost and time on the foundations for a major river
Jan 1, 2002
-
Practice to Reduce Ground Displacement in Deep Mixing WorkBy Kozo Takeda, Arashi Shimano
"Dry Jet Mixing (DJM) technique is widely known as soil mitigation technique with small ground displacement during installation comparing with other techniques. Some projects involving sensitive struc
Jan 1, 2015
-
Port Said East Port Project - Deep Diaphragm Walls For The Quay Wall ConstructionBy Mamdouh Hamza
The construction of 1200 m length new quay wall located 1,300 m East of the existing Suez Canal bypass and about 1,000 m south of the Mediterranean shoreline is one of the main projects currently unde
Jan 1, 2002
-
Interpreting Strain Measurements From Load Tests In Bored PilesBy Jack Hayes
Vibrating wire strain gages have proven to be a very reliable and effective tool for the measurement of strains associated with the loading of bored piles (drilled shafts). However, when these strains
Jan 1, 2002
-
The Wireline Undisturbed Soil Sampling In Deep Foundation ? SynopsisBy Z. Q. Bian
The wireline sampling originates from core drilling in rocks. The authors combined the wireline sampling technique with conventional undisturbed soil samplers, including Osterberg sampler, Denison sam
Jan 1, 2010
-
Practice Of Arranging Drilling Piles In Subsiding GroundsBy Vladimir M. Korolev
The field studies conducted at the experimental-production sites allowed to develop the technology of arranging drilling piles in loess subsiding grounds over 25 m deep and over 250 mm in diameter, to
Jan 1, 2002
-
Session 20 "Grouting for Water Retaining Embankments"By Timothy Flaherty
We observed the boiling in the water very close to the water adjacent to where we were drilling. That only happened at the very beginning before it was switched to water flushing. Yes, it was performe
Feb 10, 2003
-
Excavation Techniques For Underground Drinking Water Pipe Line With Micro Piles As A Special ApplicationBy Andhra Pradesh, Nagarajkumar B. V
As a part of Mumbai City Mega Drinking Water Project at Amar Mahal Tunnel-1 Ghatkopar East Mumbai, drinking water tunnels were proposed by MCGM from Amar Mahal to Trombay reservoirs, Amar Mahal to Wad
Sep 1, 2022
-
Interpretation Of Full Scale Horizontal Pile Loading Tests In Sand Analysis Of P-Y CurvesBy Ali Bouafia
Five full-scale horizontal loading tests of piles carried out by the LCPC in France are interpreted in order to analyse P-Y load-transfer curves. The experimental piles are either bored or jacked into
Jan 1, 2002
-
Nailed It! The Great Wall of the Chinese Embassy (dbde4e01-35b2-40e7-b641-e07610069e96)By Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
Nailed It! The Great Wall of the Chinese EmbassyBy Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
Underpinning System Based On Preloaded Micropiling For Construction Of Additional Underground FloorsBy Wolfram Groh
New underground floors comprising the complete footprint area of the building structure, were constructed under an existing building in sand, located in the Verdun district of Beirut / Lebanon. The wo