A Case Study of Wet Soil Mixing for Bearing Capacity Improvement in TurkeyBy Arash Maghsoudloo, Asli Can
"Abstract This paper presents a ground improvement implementation case under a raft foundation of a local hospital. The selected ground improvement method is Wet Soil Mixing (WSM) technique. Soil mixi
Jan 1, 2014
-
Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design ParametersBy Martin D. Larisch
The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.
Nov 1, 2022
-
Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing ResultsBy Yogesh Prashar
Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December
Jan 1, 2002
-
p-y Curves For Analyzing Micropiles in Sandy Soils Using Lateral Load Test DataBy Mahdi Soudkhah, Akhter Hossain
Vertical micropiles are generally considered to be low in lateral resistance. Therefore, battered micropiles are often used when additional lateral load carrying capacity is required. However, batteri
Jan 1, 2019
-
Simplifying the Design of Laterally Loaded Piles for Waterfront StructuresBy Amanda R. Parry, Chris R. Pray
Predicting and modeling the soil structure interaction of laterally loaded piles with significant unbraced lengths is one of the challenges faced in designing many waterfront structures. Designers of
Sep 8, 2021
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Use of Porous Concrete in Secant Bored Pile WallsBy Matthias Pulsfort, Markus Herten, Rolf Breitenbücher, Claudia Fierenkothen
"Secant bored pile walls are frequently used as retaining walls in watertight excavations to cut off ground water aquifers and are subsequently exposed to ground water pressure loading in addition to
Jan 1, 2017
-
1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papersBy J. Hartikainen
19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an
Jan 1, 1994
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - SynopsisBy N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
Quality Control For Augered Cast-In-Place Piles In Texas And Louisiana - 1.0 IntroductionBy Timothy L. Roberts
For many years practicing geotechnical and structural engineers in Texas and Louisiana were reluctant to include augered cast-in-place (ACIP) piles as a viable deep foundation alternate. Three primary
Jan 1, 1998
-
Berminghammer II 25 Vertical Travel Lead System: Innovative Technology For Deep Foundation Soil Mixing - 0.0 IntroductionBy Andy Schroeder
Located in Hamilton, Ontario Canada, Berminghammer Foundation Equipment, is a manufacturer of advanced foundation equipment with 30 years of experience. The company is represented in more than 20 coun
Jan 1, 1997
-
Embankment Piles ? IntroductionBy B. B. Broms
Embankment piles are common in the Scandinavian countries (Kjellman, 1940) and in Southeast Asia as support of fills, light structures, bridge abutments and deep excavations (Eide, 1968) as described
Jan 1, 2010
-
Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile SystemBy Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer
"The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of
Jan 1, 2017
-
The Effect Of Drilling Fluid On Axial Capacity, Cape Fear River, NCBy Dan Brown
Two drilled shaft foundations were subjected to axial load tests in order to measure the influence of drilling fluid on performance. Other than the differing drilling fluids, the shafts were construct
Jan 1, 2002
-
Dynamic Pile Testing - The Caltrans Results - Dynamic Pile Testing - Who Needs It?By G. G. Goble
Dynamic pile testing is now over 20 years old as a routinely applied tool for evaluating driven pile installation. The first test on a cast-in-place pile was performed more that 15 years ago. The rese
Jan 1, 1993
-
Comparative Study On Numerical Analysis Of Laterally Loaded PileBy Tiruvengala Padma, Nilesh Naik
Piles are common type of deep foundation elements used for the special bridges, transmission towers, Jetties, and tall structures. Lateral loads on the structures can be due to either earth pressures,
Sep 1, 2022
-
Long Term Behavior Of Piles - Presented At An ASCE-Penn DOT Seminar Innovations In Geotechnical Engineering - Harrisburg, PA, April 1985By Donald J. Murphy
Longevity of structural units, as compared to the planned useful life of a facility, always is a design consideration. Typical concerns include slow decay due to environmental factors, and changes in
Jan 1, 1986
-
Field Test Verification Of Ground Bearing Pressure Under Rig Tracks And Implications For Working Platform DesignBy Steffen Schweizer, Tadeusz Brzozowski, Alfred Koller, Michał Topolnicki, Jürgen Wäger, Grzegorz Sołtys
A full scale test has been conducted to determine ground bearing pressure under rig tracks. The track loads were recorded in real time using Liebherr's Ground Pressure Visualisation system, and the ve
May 1, 2022
-
Design Of Augered Cast In Place (ACIP) Piles - IntroductionBy Michael McVay
The use of augered cast-in-place piles has seen tremendous growth under commerical structures in the past twenty years. Problems with vibration, soil densification and/or heave associated with driven
Jan 1, 1997
-
Special Topic On Eurocode 7 And Standardization - Eurocode 7 - A European Geotechnical Design Code - The Eurocode System * The Objectives Of The EurocodesBy Niels Krebs Ovesen
Close economic cooperation was established among the countries in western Europe during the seventies. As a consequence, among others, a need for harmonized technical specifications for civil engineer
Jan 1, 1994