Tanana River Bulkhead Expansion, Flexibility In Construction; Key To Arctic Dock ConstructionBy Roy Peratrovich
An innovative cost-saving design for a 1,100 ft bulkhead on the Tanana River at Nenana in central Alaska won Alaska Construction & Oil magazine's Construction Achievement Award. The designers uti
Jan 1, 1985
-
Temporary Secant Wall For A Subway Rehabilitation Project In An Urban EnvironmentBy Vincent Tirolo
Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre
Jan 1, 2003
-
Managing SOE Construction Risk through Design-Build SystemsBy Rob Jameson
"The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,
Jan 1, 2017
-
What Has Been Learned About Drilled Shafts From The Osterberg Load Test - SummaryBy Jorj O. Osterberg
The Osterberg (O-Cell) Method makes it possible to separate the side shear resistance (skin friction) from end bearing. The O-Cell is placed on or near the bottom of a drilled shaft and after the conc
Jan 1, 1999
-
Displacement Dependent Stiffness And Damping Constants Of Pile GroupsBy Shamsher Prakash
Equivalent spring constants for analysis of footings is a function of Young's modulus of pile material (Ep), shear modulus of soil (Gs), and geometry of the footing and/or piles. Shear modulus is
Jan 1, 2002
-
Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, PennsylvaniaBy Brian H. Greene
The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo
Jan 1, 2006
-
Non-Destructive Testing, Evaluation And Optimization Of Existing Deep Foundations For Re-Use Along The East CoastBy Matthew E. Meyer
Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems
Jan 1, 2011
-
Challenges Associated with the Construction of a Cofferdam – A Case StudyBy Eric S. White, Thomas J. Sabourin, Khuram R. Mohib
"This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init
Jan 1, 2017
-
Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing MethodsBy Juan M. Antorena
A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a
Jan 1, 1995
-
Large Diameter Rock-Socketed Caissons For Vent Building No. 6 Central Artery/Tunnel Project, Boston - IntroductionBy P. A. Neill, O&apos
The caisson foundation for Vent Building No. 6, at the southern landfall of Boston's Third Harbor Tunnel, was installed inside an unbraced concrete cofferdam 250 feet in diameter and about 70 fee
Jan 1, 1994
-
Common Sense Changed ConditionsBy Bert R. Oastler
BERT R. OASTLER: Born Atlanta, Georgia, October 19, 1933; B.S. Civil Engineering, Duke University, 1956; Doctor of Laws, Emory University, 1966; Bryan Honor Society; Associate Editor, Journal of Publi
Jan 1, 1988
-
Deep Mixing Ground Improvement Design to Support Large MSE Walls for Kitimat LNG, BCBy Randy R. Williams, Roberto R. Olivera, Brian W. Wilson, Marina S. W. Li
"An extensive, deep mixing (DM) ground improvement program using the Cutter Soil Mixing (CSM) technique was designed and constructed in 2013 to support up to 20 m (66 ft) high Mechanically Stabilized
Jan 1, 2017
-
Analysis and Case Study for Minimizing Differential Settlements in Piled Raft FoundationsBy Yu Chuang, Zai Jinmin, Liu Songyu
"The piled raft foundation is a geotechnical composite construction method, consisting of three elements, piles, raft and soils, which is applied for the foundation in an increasing number. Differenti
Jan 1, 2005
-
Industry Practice Standards And DFI Practice Guidelines For Structural Slurry Walls - First Edition - Title ? Table Of Contents - Part I Industry Practice Standards - 1. Classification Of Slurry Wall PanelsThere are many ways to classify structural slurry wall elements, but the DFI committee chooses to limit these descriptions to three functional requirements, namely: design function, plan configuration
Jan 1, 2005
-
Once Again, Engineering And Contractor Tenacity Overcome Tough GeologyBy John E. Lens
How much trouble can narrow vertical fissures in bedrock cause on a shallow bedrock site? Enough trouble so end-bearing H-piles range between 8 and 100 feet long in a single pile cap and tiebacks ran
Jan 1, 2006
-
Drilled Piers In Coastal Plain DepositsBy J. Allan Tice
In the past fifteen to twenty years, the use of drilled piers to support high capacities in coastal plain deposits has become more and more common. With improved construction techniques and better und
Jan 1, 1988
-
Value Engineering And Field Testing Of Pre-Cast Concrete Piles For The kcICON ProjectBy Elizabeth M. Smith
The kcICON design-build project in Kansas City, Missouri includes widening the existing roadway, improving interchanges and grade separation bridges, and replacing the Missouri River Bridge. The Miss
Jan 1, 2009
-
Ground Vibrations from Pile and Sheet Pile Driving Part 1 — Building DamageBy K. Rainer Massarsch, Bengt H. Fellenius
"Abstract Vibrations generated during the driving of piles or sheet piles can affect buildings or installations in the ground. However, observed building damage is not always caused directly by dynami
Jan 1, 2014
-
Estimating N Value from Data in Press-In PilingBy Yukihiro Ishihara, Nanase Ogawa, Ming Lei
"Abstract In the Press-in Method, a static jacking force is used to install a prefabricated pile, while a reaction force is gained from previously installed piles. This piling technique has solved pro
Jan 1, 2014
-
High Capacity And Fully Removable Soil AnchorsBy Anthony D. Barley
Over 60,000 multiple anchors have been used internationally since their introduction in the early 1990s, including 1000 in the United States. The multiple anchor system comprises a "multiple" of "unit
Jan 1, 2002